Permit Application Status

PRCOM20201087


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20201087
Building Permit - Commercial
Final Completion
TOWNSEND SUMMIT LLC
ALTERATION COMMERCIAL
LANDLORD WORK FOR FUTURE TENANT FINISH FOR RESTAURANT
04/29/2020
07/15/2020
10/27/2020
11/05/2020
Locations
Contacts
CAMM CONSTRUCTION INC, Address:4006 E 137TH TERR, Phone:(816) 607-3602  
MISSION PLUMBING, HEATING AND COOLING, Address:5725 NIEMAN RD STE C, Phone:(913) 631-6506  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
SLAGGIE ARCHITECTS INC, Address:4600 MADISON AVE STE 350, Phone:(816) 756-1958 Ext:243  
TOWNSEND SUMMIT LLC, Address:230 SCHILLNG CIR STE 120  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 05/12/2020 05/06/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
05/05/2020

This project is for landlord improvements for future restaurant. Occupancy has not been established and a Certificate of Occupancy will not be issued. Action required: Comment is for informational purposes. 5/6/20 - acknowledged in letter.
IBC 1606.2 Design dead load - structural
Resolved
05/06/2020

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that roof structure is adequate to support roof mounted equipment.
IBC 706.1 Fire and Smoke Protection - General
Resolved
05/06/2020

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide complete UL wall assembly details including nail/screw patterns.
Licensed Contractors Rejected 05/12/2020 05/06/2020
Joe Frogge
LC - General Contractor
Resolved
07/15/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 5/6/20 - acknowledged in letter.
LC - MEP Subs
Resolved
07/15/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/6/20 - acknowledged in letter.
Fire Plan Review Approved with Conditions 05/12/2020 05/06/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
05/05/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
05/05/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
05/05/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Resolved
05/06/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC fire extinguisher.
Fire Plan Review Approved with Conditions 05/11/2020 04/30/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/30/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
04/30/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
04/30/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/30/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC fire extinguisher.
Building Plan Review Rejected 05/11/2020 04/30/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
04/30/2020

This project is for landlord improvements for future restaurant. Occupancy has not been established and a Certificate of Occupancy will not be issued. Action required: Comment is for informational purposes.
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/30/2020

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that roof structure is adequate to support roof mounted equipment.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
04/30/2020

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide complete UL wall assembly details including nail/screw patterns.
Licensed Contractors Rejected 05/11/2020 04/30/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
04/30/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
04/30/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $608.64 $608.64 Paid 07/15/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 8/4/2020 8/4/2020 08/04/2020
Misc
Resolved
10/28/2020
brace wall per plans. A101 - letter from Bob Campbell addressing above -
Rated Assembly Inspection Partial 8/12/2020 8/12/2020 08/12/2020
Misc
Informational
08/12/2020
- 1 LAYER 5/8 PER PLAN DEMISING WALLS OK TO TAPE -
Underground Plumbing Inspection - Commercial Failed 8/19/2020 8/19/2020 08/19/2020
Misc
Corrective Action Required
08/19/2020
- RESUBMIT TYPE OF GREASE INTERCEPTOR INSTALLED PLANS SHOW 1000 GAL INSTALLED 250 GAL -
Underground Plumbing Inspection - Commercial Failed 8/26/2020 8/26/2020 08/26/2020
Misc
Resolved
11/02/2020
- RESUBMIT TYPE OF GREASE INTERCEPTOR INSTALLED PLANS SHOW 1000 GAL INSTALLED 250 GAL - PLAN SHOWS 2" VENT THROUGH ROOF, INSTALL PER PLANS AND RESCHEDULE
Gas Service Inspection - Commercial Passed 9/15/2020 9/15/2020 09/15/2020
Gas Piping Inspection - Commercial Passed 10/28/2020 10/28/2020
In-wall Inspection Passed 10/29/2020 10/28/2020
Misc
Resolved
10/28/2020
brace wall per plans. A101 - - addressed in letter from Bob Campbell -
Rated Assembly Inspection Passed 10/28/2020 10/28/2020
Misc
Informational
08/12/2020
- DEMISING WALLS OK TO TAPE -
Final Inspection - Commercial Failed 10/28/2020 10/29/2020 10/29/2020
Misc
Corrective Action Required
10/29/2020
- PAINT GAS LINES ON ROOF -
All Rough Inspection - Commercial Passed 8/4/2020 11/02/2020
Misc
Informational
11/02/2020
- CAMM CONST WORK, STORE FRONT DOORS & GLASS, DEMISING WALLS, RTUs, GREASE INTERCEPTOR, -
Final Plumbing Inspection - Commercial Passed 10/29/2020 11/02/2020
Underground Plumbing Inspection - Commercial Passed 10/29/2020 11/02/2020
Misc
Corrective Action Required
08/26/2020
- RESUBMIT TYPE OF GREASE INTERCEPTOR INSTALLED PLANS SHOW 1000 GAL INSTALLED 250 GAL - PLAN SHOWS 2" VENT THROUGH ROOF, INSTALL PER PLANS AND RESCHEDULE
Underslab Electrical Inspection - Commercial Passed 10/29/2020 11/02/2020
Misc
Informational
11/02/2020
- UNDER SLAB CONDUIT FOR EXIT LIGHTING -
Underslab Plumbing Inspection - Commercial Passed 10/29/2020 11/02/2020
Misc
Informational
11/02/2020
- GREASE INTERCEPTOR -
Final Inspection - Commercial Passed 11/2/2020 11/4/2020 11/04/2020
Misc
Resolved
11/04/2020
- PAINT GAS LINES ON ROOF -
Documents & Images
Date Uploaded File Type Document Name
04/29/2020 Application Form Commercial Permit Application_Flying Biscuit Landlord TI_SAI Signed_2020-04-28
04/29/2020 Plans 180902-04 Flying Biscuit_Combined Permit Set_2020-04-24
04/30/2020 Letter Fire Building Plan Review
04/30/2020 Letter DS P/R Corrections Document
05/05/2020 Letter DS P_R Corrections Document_Flying Biscuit_SAI Responses_2020-05-01
05/05/2020 Plans 180902-04_Flying Biscuit_Addendum 01 - City Comments_2020-05-01
05/05/2020 Plans Roof Structure Verification Letter
05/06/2020 Letter Fire Building Plan Review
05/06/2020 Approved Plans Approved - Flying Biscuit_Combined Permit Set
07/15/2020 Receipt Receipt for transaction:2020-004478
07/15/2020 Letter DS Building Permit
08/04/2020 Letter INSPECTION SUMMARY
08/06/2020 Letter Letter regarding wall design
08/19/2020 Letter INSPECTION SUMMARY
08/21/2020 Approved Plans approved - ME401
08/21/2020 Approved Plans approved - ME301
08/26/2020 Letter INSPECTION SUMMARY
09/15/2020 Letter INSPECTION SUMMARY
10/29/2020 Letter INSPECTION SUMMARY
10/29/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home