Permit Application Status

PRCOM20200716


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200716
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
CHANGE OF TENANT
TENANT FINISH FOR EXERCISE FACILITY WITH STATIONARY BIKES
03/18/2020
04/15/2020
09/16/2020
11/10/2020
Locations
Contacts
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
CONSTRUCTION DESIGNWORKS LLC, Address:6657 WOODLAND DRIVE, Phone:(913) 745-4727  
AMOR ARCHITECTURAL CORPORATION, Phone:(909) 944-8904  
AIR CARE HEATING & COOLING, Address:10332 W 79TH ST, Phone:(913) 362-5274  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MISSION PLUMBING, HEATING AND COOLING, Address:5725 NIEMAN RD STE C, Phone:(913) 631-6506  
AGUILLONRIVERACARLOS45@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 06/10/2020 06/10/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/10/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 05/07/2020
Michael Weissenbach
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
05/07/2020

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. (Informational Purposes) Current annual inspection tag needed on riser.
Building Plan Review Approved with Conditions 04/21/2020 04/14/2020
Joe Frogge
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/14/2020

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load. (architectural drawings show rooftop units as existing but the mechanical drawings show new units so replacements were assumed) 4/7/20 - deferred per architect request. No occupancy to be granted prior to receipt of report
IBC 1209.2 Urinal partitions - privacy
Resolved
04/14/2020

2018 IBC 1209.3.2 Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measures from the finished back wall surface, whichever is greater. Exceptions: 1. Urinal partitions shall not be required in a single-occupant or family or assisted-use toilet room with a lockable door. 2. Toilet rooms located in child day care facilities containing two or more urinals shall be permitted to have one urinal without partitions. Action required: Modify design to show that urinal partition will be compliant.
ICC A117.1 303 Changes in Level
Resolved
04/14/2020

ICC A117.1 Section 303 Changes in Level 303.1 General. Changes in level in floor surfaces hall comply with Section 303. Action required: Provide detail or spec to demonstrate compliance at transition from rubber mat to adjacent flooring.
Licensed Contractors Approved 04/21/2020 04/14/2020
Joe Frogge
Fire Plan Review Approved with Conditions 04/21/2020 04/14/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
04/14/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 55 for the entire space.
Construction documents for fire alarm systems
Resolved
04/14/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
04/14/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
04/14/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Duct smoke detectors
Corrective Action Required
04/14/2020

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection to be tied to the fire alarm system.
Alarm Plan Review Released for Construction 04/03/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
04/03/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 03/30/2020 03/20/2020
Joe Frogge
IBC 1606.2 Design dead load - structural
Corrective Action Required
03/20/2020

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load. (architectural drawings show rooftop units as existing but the mechanical drawings show new units so replacements were assumed) 4/7/20 - deferred per architect request
IBC 1209.2 Urinal partitions - privacy
Corrective Action Required
03/20/2020

2018 IBC 1209.3.2 Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measures from the finished back wall surface, whichever is greater. Exceptions: 1. Urinal partitions shall not be required in a single-occupant or family or assisted-use toilet room with a lockable door. 2. Toilet rooms located in child day care facilities containing two or more urinals shall be permitted to have one urinal without partitions. Action required: Modify design to show that urinal partition will be compliant.
ICC A117.1 303 Changes in Level
Corrective Action Required
03/20/2020

ICC A117.1 Section 303 Changes in Level 303.1 General. Changes in level in floor surfaces hall comply with Section 303. Action required: Provide detail or spec to demonstrate compliance at transition from rubber mat to adjacent flooring.
Fire Plan Review Approved with Conditions 03/30/2020 03/19/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
03/19/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 55 for the entire space.
Construction documents for fire alarm systems
Corrective Action Required
03/19/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
03/19/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
03/19/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Duct smoke detectors
Corrective Action Required
03/19/2020

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection to be tied to the fire alarm system.
Licensed Contractors Approved 03/30/2020 03/18/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
7232302-Commercial Excise Tax Fee $4,410.00 $4,410.00 Paid 03/24/2020
$4,410.00
9110078-Valuation Fee for Change of Tenant $376.00 $376.00 Paid 04/21/2020
8331507-Sewer Connection Fee $210.00 $210.00 Paid 04/21/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 4/21/2020 4/21/2020 04/21/2020
In-wall Inspection Partial 5/7/2020 05/07/2020
Misc
Partial Correction
05/07/2020
IN-WALL OK TO COVER: -THE REAR 6" DEMISING WALL; EAST 4" WALL
In-wall Inspection Partial 5/22/2020 05/22/2020
Misc
Partial Correction
05/07/2020
IN-WALL OK TO COVER: -THE REAR 6" DEMISING WALL; EAST 4" WALL **YOU CAN START ROCKING THE EXERCISE BIKE ROOM ONE-SIDE ONLY CORRECTIONS: -PROTECT PLUMBING AT BOTTOM WALL TRACK WITH MIN. 2" OF PROTECTION BEYOND THE TRACK -SECURE IN-WALL 2" OR SMALLER PLUMBING AT MID-WALL HEIGHT -LAUNDRY STAND PIPE SHALL EXTEND MIN 18" AND NO MORE THAN 42" ABOVE THE TRAP WEIR -INSTALL BLOCKINGS FOR THE RESTROOM GRAB BARS
In-wall Inspection Passed 5/29/2020 at 1:40 PM 05/29/2020
Misc
Informational
05/29/2020
IN-WALL OK TO ROCK, INCLUDING THE RATED DEMISING WALL.
Above Ceiling Inspection Partial 6/17/2020 06/17/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
06/17/2020
- HARD LID HALLWAY OK TO COVER -
Electrical Service Inspection Failed 6/25/2020 6/25/2020 06/25/2020
Misc
Corrective Action Required
06/25/2020
-ISOLATE THE EQUIPMENT GROUNDING CONDUCTORS (EGC) FROM THE GROUNDED CONDUCTORS. INSTALL GROUNDING BUSBAR FOR CONNECTIONS OF MULTIPLE EGC
All Rough Inspection - Commercial Partial 5/29/2020 6/26/2020 06/26/2020
Misc
Partial Correction
06/26/2020
-FLOOR STAGE WITH RECEPTACLES INSIDE THE BACKSIDE EXERCISE RM-OK
Electrical Service Inspection Passed 6/26/2020 at 9:35 AM 06/26/2020
Misc
Resolved
06/26/2020
-ISOLATE THE EQUIPMENT GROUNDING CONDUCTORS (EGC) FROM THE GROUNDED CONDUCTORS. INSTALL GROUNDING BUSBAR FOR CONNECTIONS OF MULTIPLE EGC
Above Ceiling Inspection Passed 7/10/2020 7/10/2020 07/10/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
06/17/2020
- HARD LID HALLWAY OK TO COVER - - HARD LIDS RESTROOMS OK TO COVER - - SUSPENDED CEILING AREAS OK -
Alarm Test Passed 8/20/2020 08/20/2020
Gas Piping Inspection - Commercial Passed 8/21/2020 8/21/2020 08/21/2020
Miscellaneous Correction
Informational
08/21/2020
Gas piping for RTUs
Gas Service Inspection - Commercial Passed 10/27/2020 10/27/2020 10/27/2020
Occupancy Inspection - Fire Temporary C of O 10/29/2020 10/29/2020 10/29/2020
Occupancy Inspection - Codes Commercial Failed 10/29/2020 10/29/2020 10/29/2020
Misc
Corrective Action Required
10/29/2020
- PROVIDE HAMMER ARRESTORS WASHING MACHINE - - PROVIDE GFCI PROTECTION JANITORS CLOSET - - PIPE WATER HEATER RELIEF VALVE TO MOP SINK - - ADJUST SELF CLOSERS RESTROOM DOORS - - ADDRESS SURFACE MOUNTED HARDWARE ENTRY DOOR (SECTION 1010.9) - - PROVIDE SIGNAGE ENTRY DOOR ( THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS ) -
Occupancy Inspection - Fire Passed 11/5/2020 11/05/2020
Occupancy Inspection - Codes Commercial Full C of O 11/10/2020 11/10/2020 11/10/2020
Misc
Resolved
11/10/2020
Documents & Images
Date Uploaded File Type Document Name
03/18/2020 Letter License Tax Bill
03/19/2020 Letter Fire Building Plan Review
03/20/2020 approved job copy
03/20/2020 Letter DS P/R Corrections Document
04/03/2020 Letter Fire (Alarm) Plan Review Notice
04/14/2020 A2276 CB 2020_04_13 PC RESPONSE
04/14/2020 A2276 Cyclebar Lee's COMPLETE SET
04/14/2020 Letter Fire Building Plan Review
04/14/2020 Approved - A2276 Cyclebar Lee's COMPLETE SET
04/14/2020 Receipt Receipt for transaction:2020-001534
04/15/2020 Letter DS Building Permit
04/21/2020 Receipt Receipt for transaction: 2020-001635
04/21/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter Fire (Sprinkler) Plan Review
05/07/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
06/02/2020 Plans Revised drawing for city
06/02/2020 Plans Approved - Revised drawing for city
06/10/2020 Letter Fire (Alarm) Plan Review Notice
06/17/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter Fire (Alarm) Plan Review Notice
10/27/2020 Letter INSPECTION SUMMARY
10/27/2020 Letter Codes Plan Review Conditions
10/29/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter Codes Final Certificate of Occupancy
11/10/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home