Permit Application Status

PRCOM20200228


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200228
Building Permit - Commercial
Final Completion
W PHARMACY I DST
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS INCLUDING NEW HEALTH CLINIC
01/30/2020
03/12/2020
08/03/2020
06/25/2020
Locations
Contacts
W PHARMACY I DST, Address:1 CVS DR  
Stephen Guindon, Address:1631 Alhambra Blvd. Suite 100, Phone:(916) 453-3815  
John Polsinelli, Address:150 W. Jefferson Ave. Suite 1300  
DIAMOND CONTRACTORS INC, Address:4224 NE PORT DR, Phone:(816) 650-9200  
TODCO, Address:1260 SE CENTURY DR, Phone:(816) 875-1941  
CHAPPELL ELECTRIC LLC, Address:8908 N BALES AVE, Phone:(816) 883-8392  
SCHOELLER PLUMBING INC, Address:PO BOX 1268, Phone:(816) 628-3848  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 02/11/2020 03/12/2020
Joe Frogge
LC - MEP Subs
Resolved
03/12/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Resolved
03/12/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Building Plan Review Approved with Conditions 02/11/2020 02/06/2020
Joe Frogge
Misc
Corrective Action Required
02/05/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Gen - Plan submittals 2018 codes
Resolved
02/06/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Revise Code Data on sheet G4 to show correct code year which is 2018. (given the minor nature of comment we can correct by hand under direction from architect)
Code analysis required
Resolved
02/06/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Revise code data on sheet G4 to show correct building construction type which is 5B. (given the minor nature of comment we can correct by hand under direction from architect)
Fire Plan Review Approved with Conditions 02/11/2020 01/31/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/31/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
01/31/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
01/31/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing if modifications were made.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $1,000.00 $1,000.00 Paid Not payable online 03/12/2020
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 3/26/2020 3/26/2020 at 2:15 PM 03/26/2020
Corrective Action Required
03/26/2020
Wellness room only : 3/26/20 metal stud framing & rough electrical APPROVED
Rough Electrical Inspection - Commercial Partial 5/21/2020 05/21/2020
Misc
Informational
05/21/2020
- SHEET HUB1 AREA PER PLAN -
Rough Framing Inspection - Commercial Partial 5/21/2020 5/21/2020 05/21/2020
Misc
Corrective Action Required
05/21/2020
- SHEET HUB1 AREA METAL STUD FRAMING AT STORAGE ROOM 7 SHORT WALL WAITING ROOM -
Rough Framing Inspection - Commercial Partial 6/2/2020 6/2/2020 06/02/2020
Misc
Informational
06/02/2020
- SHEET HUB1 AREA METAL STUD FRAMING AT STORAGE ROOM 7 SHORT WALL WAITING ROOM - - METAL STUD FRAMING CONSULT ROOM AT PHARMACY -
Above Ceiling Inspection Passed 6/22/2020 06/22/2020
In-wall Inspection Passed 6/2/2020 06/22/2020
Verify Final Inspection (Final) Complete 06/23/2020
Rough Electrical Inspection - Commercial Passed 6/25/2020 06/25/2020
Misc
Informational
05/21/2020
- SHEET HUB1 AREA PER PLAN -
Rough Framing Inspection - Commercial Passed 6/25/2020 06/25/2020
Misc
Informational
06/02/2020
- SHEET HUB1 AREA METAL STUD FRAMING AT STORAGE ROOM 7 SHORT WALL WAITING ROOM - - METAL STUD FRAMING CONSULT ROOM AT PHARMACY -
All Rough Inspection - Commercial Passed 6/25/2020 06/25/2020
Occupancy Inspection - Fire Passed 6/25/2020 6/25/2020 06/25/2020
Final Electrical Inspection - Commercial Passed 6/25/2020 06/25/2020
Occupancy Inspection - Codes Commercial Full C of O 6/25/2020 6/25/2020 06/25/2020
Documents & Images
Date Uploaded File Type Document Name
01/30/2020 Letter License Tax Not Applicable
01/31/2020 Letter Fire Building Plan Review
02/05/2020 Letter DS P/R Corrections Document
02/06/2020 RE CVS Healthhub - plan review PRCOM20200228
03/12/2020 Receipt Receipt for transaction: 2020-001138
03/12/2020 Letter DS Building Permit
03/26/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter Codes Final Certificate of Occupancy
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home