Permit Application Status

PRCOM20193705


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193705
Building Permit - Commercial
Certificate of Occupancy
NEW TENANT FINISH
TENANT FINISH FOR OFFICE/WAREHOUSE
12/31/2019
02/18/2020
07/20/2020
11/10/2020
Locations
Contacts
WARD DEVELOPMENT & INVESTMENT CO, Address:1120 NW EAGLE RIDGE BLVD, Phone:(816) 229-8115  
SBC ARCHITECTURE, Address:3009 ELMIRA CT, Phone:(816) 797-7115  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
BLUE SPRINGS ELECTRICAL SERVICE, Address:3402 LAKE SHORE DR, Phone:(816) 224-9911  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
KENT@SAFETYMINISTORAGE.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 06/23/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/23/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing
Fire Plan Review Approved with Conditions 01/28/2020 01/31/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/31/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
01/31/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors to the space.
Knox box required
Corrective Action Required
01/31/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Informational Purposes) A Knoxbox is not required for the individual space. The shell building will have one placed by the FDC.
Construction documents - Fire protection systems
Corrective Action Required
01/31/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
01/31/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Resolved
01/31/2020

(Action Required) Provide a detailed plan showing racks/storage in the warehouse area. 1/22/2020 Provide a detailed plan showing racks/storage in the warehouse area.
Door operations
Corrective Action Required
01/31/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Approved with Conditions 01/28/2020 01/22/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
01/21/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 1/22/20 - acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
01/21/2020

This tenant finish permit is associated with an incomplete shell permit. Action required: Comment is for informational purposes. Occupancy will not be granted for the tenant prior to completion of shell permit. 1/22/20 - acknowledged in letter.
Suite address
Resolved
01/22/2020

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been assigned the address 2716 NE McBaine Dr. Please update your records.
Code analysis required
Resolved
01/22/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis with correct information. This building is a Type IIB and is not unlimited in area.
IBC 603.1 Type of Construction - Allowable Materials
Resolved
01/22/2020

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood is not an approved material. Modify designs.
Miscellaneous Correction
Resolved
01/22/2020

Walls between warehouse and office are fire rated but the reason is unclear. Action required: Clarify.
IPC 403.1 Minimum number of fixtures
Resolved
01/22/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
ICC A117.1 304.3 Turning Space
Resolved
01/22/2020

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify designs to provide minimum 67" turning radii.
ICC A117.1 902.4 Dining and work surfaces
Resolved
01/22/2020

ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify design to show that counter top at coffee bar to be maximum 34" high.
IBC 1209.2 Finish materials
Resolved
01/22/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify on plans compliant wall finish materials in restrooms and at mop sink.
Misc
Resolved
01/22/2020

Unable to locate natural gas pipe material. Action required: Specify material to be used for natural gas piping.
Fire Plan Review Rejected 01/28/2020 01/22/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/21/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
01/21/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors to the space.
Knox box required
Corrective Action Required
01/21/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Informational Purposes) A Knoxbox is not required for the individual space. The shell building will have one placed by the FDC.
Construction documents - Fire protection systems
Corrective Action Required
01/21/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
01/21/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Resolved
01/22/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC fire extinguisher in the business area and three 2A10BC fire extinguishers in the warehouse.
Miscellaneous Correction
Corrective Action Required
01/21/2020

(Action Required) Provide a detailed plan showing racks/storage in the warehouse area. 1/22/2020 Provide a detailed plan showing racks/storage in the warehouse area.
Door operations
Corrective Action Required
01/21/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Licensed Contractors Approved 01/28/2020 01/21/2020
Joe Frogge
Building Plan Review Rejected 01/13/2020 01/03/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
01/03/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
01/03/2020

This tenant finish permit is associated with an incomplete shell permit. Action required: Comment is for informational purposes. Occupancy will not be granted for the tenant prior to completion of shell permit.
Suite address
Corrective Action Required
01/03/2020

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been assigned the address 2716 NE McBaine Dr. Please update your records.
Code analysis required
Corrective Action Required
01/03/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis with correct information. This building is a Type IIB and is not unlimited in area.
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
01/03/2020

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood is not an approved material. Modify designs.
Miscellaneous Correction
Corrective Action Required
01/03/2020

Walls between warehouse and office are fire rated but the reason is unclear. Action required: Clarify.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
01/03/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
ICC A117.1 304.3 Turning Space
Corrective Action Required
01/03/2020

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify designs to provide minimum 67" turning radii.
ICC A117.1 902.4 Dining and work surfaces
Corrective Action Required
01/03/2020

ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify design to show that counter top at coffee bar to be maximum 34" high.
IBC 1209.2 Finish materials
Corrective Action Required
01/03/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify on plans compliant wall finish materials in restrooms and at mop sink.
Misc
Corrective Action Required
01/03/2020

Unable to locate natural gas pipe material. Action required: Specify material to be used for natural gas piping.
Fire Plan Review Rejected 01/13/2020 01/02/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/02/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
01/02/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
01/02/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Informational Purposes) A Knoxbox is not required for the individual space. The shell building will have one placed by the FDC.
Construction documents - Fire protection systems
Corrective Action Required
01/02/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
01/02/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/02/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC fire extinguisher in the business area and three 2A10BC fire extinguishers in the warehouse.
Miscellaneous Correction
Corrective Action Required
01/02/2020

(Action Required) Provide a detailed plan showing racks/storage in the warehouse area.
Door operations
Corrective Action Required
01/02/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Licensed Contractors Approved 01/13/2020 12/31/2019
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $460.00 $460.00 Paid 02/18/2020
8331506-EFHB Maybrook, Full $255.66 $255.66 Paid 02/18/2020
8331507-Sewer Connection Fee $180.00 $180.00 Paid 02/18/2020
7232302-Industrial/Warehouse License Tax Fee $1,940.00 $1,940.00 Paid 01/14/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 6/18/2020 6/18/2020 at 1:40 PM 06/18/2020
In-wall Inspection Passed 7/10/2020 7/10/2020 at 12:40 PM 07/10/2020
Electrical Service Inspection Passed 8/4/2020 8/4/2020 08/04/2020
Gas Service Inspection - Commercial Passed 8/20/2020 08/20/2020
Above Ceiling Inspection Passed 8/20/2020 8/20/2020 at 8:30 AM 08/26/2020
Misc
Resolved
08/26/2020
-Provide max 10 ft vertical support for PVC. Also provide lateral restraint for PVC in between the required 10 ft support for PVC 2” or smaller -Seal duct joints **OK TO DROP TILES
Rated Assembly Inspection Failed 8/26/2020 08/26/2020
Misc
Corrective Action Required
08/26/2020
-1-hour wall requires type X gypsum; instead, non-type X gb were installed -Screw to bottom edge @ 8” oc
Above Ceiling Inspection Passed 08/26/2020
Misc
Resolved
08/26/2020
-Provide max 10 ft vertical support for PVC. Also provide lateral restraint for PVC in between the required 10 ft support for PVC 2” or smaller -Seal duct joints **OK TO DROP TILES
Rated Assembly Inspection Failed 9/2/2020 9/2/2020 at 10:05 AM 09/02/2020
Misc
Corrective Action Required
08/26/2020
-Complete installing type X gb on the unfinished side -Screw to top and bottom track edge @ 8” oc
Rated Assembly Inspection Passed 9/10/2020 9/10/2020 09/10/2020
Misc
Resolved
09/10/2020
-Complete installing type X gb on the unfinished side -Screw to top and bottom track edge @ 8” oc
Alarm Test Passed 9/15/2020 09/16/2020
Occupancy Inspection - Fire Partial 9/17/2020 9/17/2020 09/17/2020
Occupancy Inspection - Codes Commercial Failed 9/17/2020 09/17/2020
Misc
Corrective Action Required
09/17/2020
-License tax shall be paid prior to issuance of any occupancy -Approval required from: Fire -Install breaker lock for out-of-sight water heater, or install disconnect for WH -The terminations of b-vent shall be min 8 ft from parapet wall
Occupancy Inspection - Planning Temporary C of O 09/18/2020
Corrective Action Required
09/18/2020
Complete landscaping per the approved plan.
Corrective Action Required
09/18/2020
Install the gates on both trash enclosures per the approved plan.
Occupancy Inspection - Codes Commercial Temporary C of O 9/21/2020 09/21/2020
Misc
Corrective Action Required
09/17/2020
-Approval required from: Fire
Occupancy Inspection - Fire Passed 9/22/2020 09/22/2020
Occupancy Inspection - Codes Commercial Full C of O 11/10/2020
Misc
Resolved
11/10/2020
-Approval required from: Fire
Documents & Images
Date Uploaded File Type Document Name
12/31/2019 Letter License Tax Bill
12/31/2019 Letter License Tax Bill
01/02/2020 Letter Fire Building Plan Review
01/09/2020 Email Address info
01/09/2020 Letter DS P/R Corrections Document
01/14/2020 Receipt Receipt for transaction: 2020-000153
01/22/2020 Letter Fire Building Plan Review
01/22/2020 Letter DS P/R Corrections Document
01/31/2020 Letter Fire Building Plan Review
02/18/2020 Receipt Receipt for transaction: 2020-000651
02/18/2020 Letter DS Building Permit
06/18/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter Fire (Alarm) Plan Review Notice
07/10/2020 Letter INSPECTION SUMMARY
08/04/2020 Letter INSPECTION SUMMARY
08/20/2020 Letter INSPECTION SUMMARY
08/20/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter Codes Plan Review Conditions
08/26/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter INSPECTION SUMMARY
09/10/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter Codes Temporary Certificate of Occupancy
11/10/2020 Letter Codes Final Certificate of Occupancy
11/10/2020 Letter Field Certificate of Occupancy
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home