Review Type |
Outcome |
Est. Completion Date |
Completed |
Final Development Plan Review
|
Approved
|
|
02/28/2020
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Approved with Conditions
|
03/06/2020
|
02/28/2020
|
|
Joe Frogge
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is for informational purposes.
2/24/20 - acknowledged in letter.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
2/24/20 - acknowledged in letter.
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Provide roof truss package or request deferral.
2/24/20 - deferred
|
|
Misc
Corrective Action Required
Irrigation piping conflicts with civil plans. Civil plans call for separate irrigation meter while plumbing plans show irrigation piping routed from inside building.
Action required: Resolve conflict.
2/24/20 - conflict still exists. Field verify.
|
|
IPC 1003.3.1 Grease interceptors
Grease interceptor design not found in submittal.
Action required: Provide grease interceptor installation details. (not provided on civil drawings)
2/24/20 - detail is illegible. Reprint.
|
|
Gen - Design professional seals
**comment added on 2/24/20**
Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information)
Action required: All drawings are to bear dated seal and signature from architect/engineer of record. The following sheets have illegible seals/signatures.
A1.3
A4.1 thru A6.1
All MEP
|
|
|
Licensed Contractors
|
Approved
|
02/28/2020
|
02/28/2020
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/06/2020
|
02/28/2020
|
|
Joe Frogge
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load sign at 76.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified At Inspection)
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule a hood and duct detection test.
|
|
Duct smoke detectors
Corrective Action Required
2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
(Verified At Inspection)
|
|
|
Building Plan Review
|
Rejected
|
02/25/2020
|
02/24/2020
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is for informational purposes.
2/24/20 - acknowledged in letter.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
2/24/20 - acknowledged in letter.
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Provide roof truss package or request deferral.
2/24/20 - deferred
|
|
IMC 306.5 Equipment on roofs
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Provide side rail extender at roof hatch ladder.
|
|
ICC A117.1 304.3 Turning Space
ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping)
Action required: Modify design to comply with larger turning radii.
|
|
ICC A117.1 305.3 Clear Floor Space
ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width.
Action required: Modify design to comply with longer clear floor space.
|
|
IMC 508.1.1 Makeup air temperature
2018 IMC 508.1 Makeup air. Makeup air shall be supplied during the operation of commercial kitchen exhaust systems that are provided for commercial cooking appliances. The amount of makeup air supplied to the building from all sources shall be approximately equal to the amount of exhaust air for all exhaust systems for the building. The makeup air shall not reduce the effectiveness of the exhaust system. Makeup air shall be provided by gravity or mechanical means or both. Mechanical makeup air systems shall be automatically controlled to start and operate simultaneously with the exhaust system. Makeup air intake opening locations shall comply with Section 401.1.
Action required: Provide makeup air to compensate for hood exhaust.
|
|
Misc
Corrective Action Required
Irrigation piping conflicts with civil plans. Civil plans call for separate irrigation meter while plumbing plans show irrigation piping routed from inside building.
Action required: Resolve conflict.
2/24/20 - conflict still exists. Field verify.
|
|
NEC Article 250.50 Grounding electrode system
2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception)
Action required: Provide detailed grounding diagram that includes all connections or modify riser diagram to comply.
|
|
IPC 1003.3.1 Grease interceptors
Corrective Action Required
Grease interceptor design not found in submittal.
Action required: Provide grease interceptor installation details. (not provided on civil drawings)
2/24/20 - detail is illegible. Reprint.
|
|
Gen - Design professional seals
Corrective Action Required
**comment added on 2/24/20**
Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information)
Action required: All drawings are to bear dated seal and signature from architect/engineer of record. The following sheets have illegible seals/signatures.
A1.3
A4.1 thru A6.1
All MEP
|
|
|
Licensed Contractors
|
Approved
|
|
02/24/2020
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
02/25/2020
|
02/21/2020
|
|
Michael Weissenbach
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load sign at 76.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified At Inspection)
|
|
Type I hood - Where required
2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors.
(Verified At Inspection)
Manual pull mounted no less than 10 feet and not greater than 20 feet from hood system.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule a hood and duct detection test.
|
|
Portable fire extinguishers for commercial cooking equipment.
2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
(Verified At Inspection)
|
|
Misc
(Action Required)
Provide specs and quantity for the CO2 tank. IFC 2018 5307.3 will apply with tank quantities exceeding 100 pounds.
|
|
Duct smoke detectors
Corrective Action Required
2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
(Verified At Inspection)
|
|
Panic and fire exit hardware
2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
(Action Required)
Provide panic hardware on exit doors.
|
|
|
Health Department Review
|
Approved
|
|
01/02/2020
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Rejected
|
01/02/2020
|
12/18/2019
|
|
Michael Weissenbach
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load sign at 76.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified At Inspection)
|
|
Type I hood - Where required
Corrective Action Required
2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors.
(Verified At Inspection)
Manual pull mounted no less than 10 feet and not greater than 20 feet from hood system.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule a hood and duct detection test.
|
|
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
(Verified At Inspection)
|
|
Misc
Corrective Action Required
(Action Required)
Provide specs and quantity for the CO2 tank. IFC 2018 5307.3 will apply with tank quantities exceeding 100 pounds.
|
|
Duct smoke detectors
Corrective Action Required
2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
(Action Required)
Duct detection required with CFM greater than 2000.
|
|
Panic and fire exit hardware
Corrective Action Required
2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
(Action Required)
Provide panic hardware on exit doors.
|
|
|
Building Plan Review
|
Rejected
|
01/02/2020
|
12/18/2019
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is for informational purposes.
|
|
Health Dept Review
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is for informational purposes.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Provide roof truss package or request deferral.
|
|
IMC 306.5 Equipment on roofs
Corrective Action Required
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Provide side rail extender at roof hatch ladder.
|
|
ICC A117.1 304.3 Turning Space
Corrective Action Required
ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping)
Action required: Modify design to comply with larger turning radii.
|
|
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width.
Action required: Modify design to comply with longer clear floor space.
|
|
IMC 508.1.1 Makeup air temperature
Corrective Action Required
2018 IMC 508.1 Makeup air. Makeup air shall be supplied during the operation of commercial kitchen exhaust systems that are provided for commercial cooking appliances. The amount of makeup air supplied to the building from all sources shall be approximately equal to the amount of exhaust air for all exhaust systems for the building. The makeup air shall not reduce the effectiveness of the exhaust system. Makeup air shall be provided by gravity or mechanical means or both. Mechanical makeup air systems shall be automatically controlled to start and operate simultaneously with the exhaust system. Makeup air intake opening locations shall comply with Section 401.1.
Action required: Provide makeup air to compensate for hood exhaust.
|
|
Misc
Corrective Action Required
Irrigation piping conflicts with civil plans. Civil plans call for separate irrigation meter while plumbing plans show irrigation piping routed from inside building.
Action required: Resolve conflict.
|
|
NEC Article 250.50 Grounding electrode system
Corrective Action Required
2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception)
Action required: Provide detailed grounding diagram that includes all connections or modify riser diagram to comply.
|
|
IPC 1003.3.1 Grease interceptors
Corrective Action Required
Grease interceptor design not found in submittal.
Action required: Provide grease interceptor installation details. (not provided on civil drawings)
|
|
|
Licensed Contractors
|
Rejected
|
01/02/2020
|
12/18/2019
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|