Permit Application Status

PRCOM20193544


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193544
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT MISSOURI
NEW COMMERCIAL
NEW DIALYSIS CLINIC BUILDING WITH CANOPY
12/06/2019
02/27/2020
07/14/2020
03/31/2021
Locations
Contacts
CITY OF LEES SUMMIT MISSOURI, Address:220 SE GREEN ST  
AXIOM NORTHWEST CONSTRUCTION INC, Address:2232 BROADWAY STE 101, Phone:(425) 903-4038  
RANDALL DOVER ARCHITECT, Address:4121 HILLSBORO RD, STE 303, Phone:(615) 251-3388  
PREMIERLIFE REAL ESTATE HOLDING, Address:400 NW MURRAY RD  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
EMPOWERED ELECTRIC , Address:110 E 13TH AVE, Phone:(816) 401-8949  
UNITED PLUMBING & SERVICE CO INC, Address:301 DUCK RD, Phone:(816) 761-5262  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 07/13/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
07/13/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and a water flow.
Misc
Corrective Action Required
07/13/2020

(Informational Purposes) Update records showing NFPA 13 2016 Edition
Special Inspections Review Approved 02/14/2020
Joe Frogge
Building Plan Review Approved with Conditions 01/27/2020 02/11/2020
Joe Frogge
Final Development Plan
Resolved
02/06/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 12/23/19 - acknowledged in letter
Miscellaneous Correction
Corrective Action Required
01/17/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 12/23/19 - acknowledged in letter
IBC 1704.2 Special Inspections
Resolved
02/06/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/23/19 - acknowledged in letter
Engineered truss package
Corrective Action Required
01/17/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral. 12/23/19 - deferred per request
IMC 306.5 Equipment on roofs
Resolved
01/21/2020

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) 7. Climbing clearance. The distance from the centerline of the rungs to the nearest permanent object on the climbing side of the ladder shall be not less than 30 inches measured perpendicular to the rungs. This distance shall be maintained from the point of ladder access to the bottom of the roof hatch. A minimum clear width of 15 inches shall be provided on both sides of the ladder measured from the midpoint of and parallel with the rungs except where cages or wells are installed. Actions required: - - Provide side rail extensions. 12/23/19 - No changes found in submittal. 1/16/20 - Side rail extension applies to all roof hatches, not just exterior. ("ladderup post" or similar would be acceptable. - most manufacturer's are privy to this code section so will likely have an option for you)
Licensed Contractors Approved 01/21/2020 02/11/2020
Joe Frogge
LC - MEP Subs
Resolved
02/11/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/23/19 - acknowledged in letter
LC - General Contractor
Resolved
02/06/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 12/23/19 - acknowledged in letter
Final Development Plan Review Approved 02/06/2020
Joe Frogge
Fire Plan Review Approved with Conditions 01/27/2020 01/22/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/17/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Address numbers required
Corrective Action Required
01/17/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
01/17/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order a Knox box from knoxbox.com. Placement to be made by FDC.
Construction documents - Fire protection systems
Corrective Action Required
01/17/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
01/17/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Door operations
Corrective Action Required
01/17/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Alarm Plan Review Released for Construction 01/21/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
01/21/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Misc
Corrective Action Required
01/21/2020

(Action Required) Label RTU's to correlate with remote test switches.
Building Plan Review Rejected 01/22/2020 01/16/2020
Joe Frogge
Final Development Plan
Corrective Action Required
01/14/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 12/23/19 - acknowledged in letter
Miscellaneous Correction
Corrective Action Required
01/14/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 12/23/19 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
01/14/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/23/19 - acknowledged in letter
Engineered truss package
Corrective Action Required
01/14/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral. 12/23/19 - deferred per request
IBC 1010.1.2 Door swing - direction of swing egress travel
Resolved
01/16/2020

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Door out of PD Lab 118 into Corridor 115 to swing in direction of egress. 12/23/19 - electrical drawing E2.1 still shows exit light.
IMC 306.5 Equipment on roofs
Corrective Action Required
01/14/2020

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) 7. Climbing clearance. The distance from the centerline of the rungs to the nearest permanent object on the climbing side of the ladder shall be not less than 30 inches measured perpendicular to the rungs. This distance shall be maintained from the point of ladder access to the bottom of the roof hatch. A minimum clear width of 15 inches shall be provided on both sides of the ladder measured from the midpoint of and parallel with the rungs except where cages or wells are installed. Actions required: - - Provide side rail extensions. 12/23/19 - No changes found in submittal. 1/16/20 - Side rail extension applies to all roof hatches, not just exterior. ("ladderup post" or similar would be acceptable. - most manufacturer's are privy to this code section so will likely have an option for you)
Licensed Contractors Rejected 01/22/2020 01/16/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/14/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/23/19 - acknowledged in letter
LC - General Contractor
Corrective Action Required
01/14/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 12/23/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 01/22/2020 01/14/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/14/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Address numbers required
Corrective Action Required
01/14/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
01/14/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order a Knox box from knoxbox.com. Placement to be made by FDC.
Construction documents - Fire protection systems
Corrective Action Required
01/14/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
01/14/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Resolved
01/14/2020

(Action required) IFC 503.2.1 Minimum clearance for canopy is 13'6''. 12/26/2019 Fire trucks will have no reason to be under the canopy. Due to ambulances that will have to access the building, especially during inclement weather, what is the height of the canopy? Our ambulances are 9' 9'' in height.
Door operations
Corrective Action Required
01/14/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Direction of swing
Resolved
01/14/2020

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. (Action Required) Door by PD Lab 118 needs to swing in the path of egress. 12/26/2019 Agreed, the door is not required for egress. The exit signage needs to be removed on the electrical plan E2.1.
Fire Plan Review Rejected 01/02/2020 12/26/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
12/23/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Hazardous material identification
Resolved
12/26/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Action Required) Label all rooms with hazardous materials.
Address numbers required
Corrective Action Required
12/23/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
12/23/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order a Knox box from knoxbox.com. Placement to be made by FDC.
Construction documents - Fire protection systems
Corrective Action Required
12/23/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
12/23/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
12/23/2019

(Action required) IFC 503.2.1 Minimum clearance for canopy is 13'6''. 12/26/2019 Fire trucks will have no reason to be under the canopy. Due to ambulances that will have to access the building, especially during inclement weather, what is the height of the canopy? Our ambulances are 9' 9'' in height.
Misc
Resolved
12/26/2019

(Action Required) Provide a fire hydrant within 100' of the FDC.
Door operations
Corrective Action Required
12/23/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Direction of swing
Corrective Action Required
12/23/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. (Action Required) Door by PD Lab 118 needs to swing in the path of egress. 12/26/2019 Agreed, the door is not required for egress. The exit signage needs to be removed on the electrical plan E2.1.
Building Plan Review Rejected 01/02/2020 12/23/2019
Joe Frogge
Final Development Plan
Corrective Action Required
12/23/2019

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 12/23/19 - acknowledged in letter
Miscellaneous Correction
Corrective Action Required
12/23/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 12/23/19 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
12/23/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/23/19 - acknowledged in letter
Engineered truss package
Corrective Action Required
12/23/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral. 12/23/19 - deferred per request
ICC A117.1 305.3 Clear Floor Space
Resolved
12/23/2019

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. Action required: Modify plans and details to comply.
ICC A117.1 304.3 Turning Space
Resolved
12/23/2019

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify plans and details to comply.
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
12/23/2019

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Door out of PD Lab 118 into Corridor 115 to swing in direction of egress. 12/23/19 - electrical drawing E2.1 still shows exit light.
Miscellaneous Correction
Resolved
12/23/2019

Irrigation system backflow is shown to be heated but there is no source of power. Action required: Provide power to backflow heater.
Misc
Resolved
12/23/2019

Conflict exists between notes 4 & 5 on sheet A1.0 and details 6 & 7 on sheet G1.0. Action required: Resolve conflict as concerns which walls are fire rated.
IMC 306.5 Equipment on roofs
Corrective Action Required
12/23/2019

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) 7. Climbing clearance. The distance from the centerline of the rungs to the nearest permanent object on the climbing side of the ladder shall be not less than 30 inches measured perpendicular to the rungs. This distance shall be maintained from the point of ladder access to the bottom of the roof hatch. A minimum clear width of 15 inches shall be provided on both sides of the ladder measured from the midpoint of and parallel with the rungs except where cages or wells are installed. Actions required: - Modify truss designs to comply. 12/23/19 - Sheet S1.2 still shows conflict. Field modifications to engineered trusses not allowed without written approval from truss engineer. - Provide side rail extensions. 12/23/19 - No changes found in submittal.
Gen - Plan submittals 2018 codes
Resolved
12/23/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update or remove reference to 2012 codes on sheet S0.1.
IBC 1809.5 Frost protection - foundation
Resolved
12/23/2019

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify footing designs to show minimum 36" protection.
IBC 1208.2 Attic spaces
Resolved
12/23/2019

2018 IBC 1208.2 Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide attic access.
Licensed Contractors Rejected 01/02/2020 12/23/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/23/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/23/19 - acknowledged in letter
LC - General Contractor
Corrective Action Required
12/23/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 12/23/19 - acknowledged in letter
Building Plan Review Rejected 12/20/2019 12/12/2019
Joe Frogge
Final Development Plan
Corrective Action Required
12/12/2019

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
12/12/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IBC 1704.2 Special Inspections
Corrective Action Required
12/12/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Engineered truss package
Corrective Action Required
12/12/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral.
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
12/12/2019

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. Action required: Modify plans and details to comply.
ICC A117.1 304.3 Turning Space
Corrective Action Required
12/12/2019

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify plans and details to comply.
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
12/12/2019

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Door out of PD Lab 118 into Corridor 115 to swing in direction of egress.
Miscellaneous Correction
Corrective Action Required
12/12/2019

Irrigation system backflow is shown to be heated but there is no source of power. Action required: Provide power to backflow heater.
Misc
Corrective Action Required
12/12/2019

Conflict exists between notes 4 & 5 on sheet A1.0 and details 6 & 7 on sheet G1.0. Action required: Resolve conflict as concerns which walls are fire rated.
IMC 306.5 Equipment on roofs
Corrective Action Required
12/12/2019

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) 7. Climbing clearance. The distance from the centerline of the rungs to the nearest permanent object on the climbing side of the ladder shall be not less than 30 inches measured perpendicular to the rungs. This distance shall be maintained from the point of ladder access to the bottom of the roof hatch. A minimum clear width of 15 inches shall be provided on both sides of the ladder measured from the midpoint of and parallel with the rungs except where cages or wells are installed. Action required: Modify truss designs to comply.
Gen - Plan submittals 2018 codes
Corrective Action Required
12/12/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update or remove reference to 2012 codes on sheet S0.1.
IBC 1809.5 Frost protection - foundation
Corrective Action Required
12/12/2019

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify footing designs to show minimum 36" protection.
IBC 1803.1 General - geotech
Resolved
12/20/2019

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. 12/20/19 - hard copy of report is in FDP file.
IBC 1208.2 Attic spaces
Corrective Action Required
12/12/2019

2018 IBC 1208.2 Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide attic access.
Licensed Contractors Rejected 12/20/2019 12/12/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/12/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
12/12/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fire Plan Review Rejected 12/20/2019 12/10/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
12/10/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Hazardous material identification
Corrective Action Required
12/10/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Action Required) Label all rooms with hazardous materials.
Address numbers required
Corrective Action Required
12/10/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
12/10/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox box from knoxbox.com. Placement to be made by FDC.
Construction documents - Fire protection systems
Corrective Action Required
12/10/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
12/10/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
12/10/2019

(Action required) IFC 503.2.1 Minimum clearance for canopy is 13'6''.
Misc
Corrective Action Required
12/10/2019

(Action Required) Provide a fire hydrant within 100' of the FDC.
Door operations
Corrective Action Required
12/10/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Direction of swing
Corrective Action Required
12/10/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. (Action Required) Door by PD Lab 118 needs to swing in the path of egress.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $14,000.00 $14,000.00 Paid 02/12/2020
8331507-Sewer Connection Fee $1,140.00 $1,140.00 Paid 02/12/2020
7232302-Commercial License Tax Fee $20,835.00 $20,835.00 Paid 12/23/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 5/19/2020 (1:00) 5/19/2020 05/19/2020
Misc
Corrective Action Required
05/19/2020
Pending engineered soils report. Perimeter footing installed, ufer in SW corner. 10 interior piers.
Footing Inspection - Commercial Partial 5/20/2020 5/20/2020 05/20/2020
Misc
Corrective Action Required
05/19/2020
Pending engineered soils report. Perimeter footing installed, ufer in SW corner. 10 interior piers.
Misc
Informational
05/20/2020
2 SPREAD FOOTINGS FRONT OF BUILDING 10 BARS EACH WAY
Foundation Inspection - Commercial Partial 5/22/2020 (8:15) 5/22/2020 05/22/2020
Misc
Informational
05/22/2020
NE CORNER B-B.5 1-4 STEM WALL REBAR (3) # 4 BARS 12 OC
Foundation Inspection - Commercial Partial 6/2/2020 (8:45) 6/2/2020 06/02/2020
Misc
Informational
06/02/2020
- COMPLETE NORTH STEM WALL, WEST STEM WALL TO LINE 8 AT DETAIL F -
Foundation Inspection - Commercial Passed 6/3/2020 (1:00) 6/3/2020 06/03/2020
Misc
Informational
06/02/2020
NE CORNER B-B.5 1-4 STEM WALL REBAR (3) # 4 BARS 12 OC
Misc
Informational
06/03/2020
- STEM WALL LINE 8 WEST WALL, SOUTH WALL , EAST WALL COMPLETES STEM WALL- - UFER LOCATED SE CORNER -
Underslab Plumbing Inspection - Commercial Passed 6/24/2020 6/23/2020 06/23/2020
Misc
Informational
06/23/2020
STORM & SANITARY PRESSURE STEADY AT 5 PSI
All Rough Inspection - Commercial Failed 11/4/2020 11/4/2020 11/04/2020
Misc
Corrective Action Required
11/04/2020
- INSULATED WITHOUT APPROVAL REMOVE INSULATION FOR I NSPECTION - - PROVIDE 3RD PARTY INSPECTION REPORTS - - DO NOT COVER WORK WITHOUT APPROVAL -
Sprinkler - Hydrostatic Test Passed 11/6/2020 11/09/2020
Corrective Action Required
11/25/2020
Electrical Service Inspection Passed 11/10/2020 11/10/2020 11/10/2020
Rough Plumbing Inspection - Commercial Failed 11/11/2020 11/11/2020
Misc
Corrective Action Required
11/11/2020
2001 NW Shamrock Ave Rough plumbing Support vertical 2" & smaller DWV at midpoint Provide pressure on DWV system Support copper plumbing overhead training room ( no bailing wire on sprinkler line ) Boca plates throughout Room # 145 boca 136 140 133
Rough Plumbing Inspection - Commercial Failed 11/13/2020 11/13/2020 11/13/2020
Misc
Resolved
11/25/2020
All Rough Inspection - Commercial Failed 11/13/2020 11/13/2020 11/13/2020
Misc
Corrective Action Required
11/04/2020
- INSULATED WITHOUT APPROVAL REMOVE INSULATION FOR I NSPECTION - - PROVIDE 3RD PARTY INSPECTION REPORTS - - DO NOT COVER WORK WITHOUT APPROVAL -
Misc
Corrective Action Required
11/13/2020
11/13/2020 Electrical & Mechanical trades not ready for all rough inspection. Documentation regarding third party inspections has not been submitted and is not onsite. Do not cover
All Rough Inspection - Commercial Failed 11/23/2020 11/23/2020 11/23/2020
Misc
Corrective Action Required
11/13/2020
- INSULATED WITHOUT APPROVAL REMOVE INSULATION FOR I NSPECTION - - PROVIDE 3RD PARTY INSPECTION REPORTS - - DO NOT COVER WORK WITHOUT APPROVAL -
Misc
Corrective Action Required
11/13/2020
11/13/2020 Electrical & Mechanical trades not ready for all rough inspection. Documentation regarding third party inspections has not been submitted and is not onsite. Do not cover
Misc
Corrective Action Required
11/23/2020
- PROVIDE MEDICAL MC CABLE PATIENT ROOMS & LIGHTS, ALL BRANCH CURCUITS - - PROVIDE CLEANOUTS WHERE REQUIRED - - BACK TO BACK FITTINGS AT DRAIN BOXES - - PROVIDE SPECIAL INSPECTIONS REPORTS - - DRAIN 2 PIPE SIZE DIMENSIONS FROM TRAP TO WYE - - COVER FACED INSULATION ABOVE CEILING - - PROVIDE BACKING FOR ROOFTOP ACCESS LADDER - - ROOF DRAIN ROOM # 119 - -
Gas Service Inspection - Commercial Passed 11/25/2020 11/25/2020 11/25/2020
Rough Plumbing Inspection - Commercial Passed 11/25/2020 11/25/2020
Misc
Resolved
11/25/2020
All Rough Inspection - Commercial Failed 11/25/2020 11/25/2020 11/25/2020
Misc
Corrective Action Required
11/23/2020
- INSULATED WITHOUT APPROVAL REMOVE INSULATION FOR I NSPECTION - - PROVIDE 3RD PARTY INSPECTION REPORTS - - DO NOT COVER WORK WITHOUT APPROVAL -
Misc
Resolved
11/25/2020
Misc
Corrective Action Required
11/23/2020
- PROVIDE SPECIAL INSPECTIONS REPORTS FROM TERRACON - - COVER FACED INSULATION ABOVE CEILING - - PROVIDE BACKING FOR ROOFTOP ACCESS LADDER - - ROOF DRAIN ROOM # 119 - - OK to Sheetrock west wall & one side interior walls -
Rated Assembly Inspection Partial 12/1/2020 12/1/2020 12/01/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
12/01/2020
- SCREW PATTERN SMOKE WALLS ELECTRICAL ROOM & WATER CONDITIONING ROOM -
All Rough Inspection - Commercial Partial 12/2/2020 12/02/2020
Misc
Resolved
02/18/2021
- PROVIDE 3RD PARTY INSPECTION REPORTS - - UPLOAD TERRACON REPORTS TO PERMIT -
Sidewalk Inspection Partial 12/7/2020 12/07/2020
Misc
Informational
12/07/2020
Forms were placed and aggregate was present and compacted. They poured over 6 inches of KCMMB mix. RP 12-7-20
Pavement-Surface Passed 12/7/2020 12/7/2020 12/07/2020
Misc
Informational
12/07/2020
Bottoroff poured the wing sections of the parking lot entrances and dumpster pad. RP 12-7-20
Piers/Caissons Inspection - Commercial Failed 12/7/2020 12/07/2020
Misc
Corrective Action Required
12/07/2020
- RECALL WHEN PIERS/LIGHT POLE BASES DUG, REBAR & GROUND ROD IN PLACE, ALSO CALL FOR UNDERGROUND ELECTRICAL FOR INSPECTION BEFORE COVERING -
Underground Electrical Inspection - Commercial Passed 12/10/2020 12/10/2020 12/10/2020
Misc
Informational
12/10/2020
- CONDUIT FOR LIGHT POLE BASES -
Piers/Caissons Inspection - Commercial Passed 12/10/2020 (8:00) 12/10/2020 12/10/2020
Misc
Informational
12/10/2020
- (7) LIGHT POLE BASES, REBAR IN PLACE, DRIVEN GROUND RODS IN PLACE OK TO POUR -
Sidewalk Inspection Passed 12/11/2020 12/11/2020 12/11/2020
Misc
Informational
12/07/2020
Forms were placed and aggregate was present and compacted. They poured over 6 inches of KCMMB mix. RP 12-7-20
Misc
Informational
12/11/2020
Finished sidewalk meets LS and ADA specs. RP 12-11-20
Footing Inspection - Commercial Passed 12/18/2020 (2:00) 12/18/2020 12/18/2020
Misc
Corrective Action Required
05/20/2020
Pending engineered soils report. Perimeter footing installed, ufer in SW corner. 10 interior piers.
Misc
Informational
05/20/2020
2 SPREAD FOOTINGS FRONT OF BUILDING 10 BARS EACH WAY - MONUMENT SIGN PER PLAN -
Above Ceiling Inspection Failed 1/8/2021 1/8/2021 01/08/2021
Miscellaneous Correction
Corrective Action Required
01/08/2021
Provide covers open j boxs throughout Complete hvac Rooms 107,108, 109,116, 125,127, 135, 143, RO room, IT room,open j boxes at border shall be exposed for inspection 141, 112, 136 install ceiling grid Repair drywall rooms with smoke lids Ok to install borders must provide access to above rooms with open j boxes
Above Ceiling Inspection Failed 1/22/2021 1/22/2021 01/22/2021
Miscellaneous Correction
Corrective Action Required
01/08/2021
Provide covers open j boxs throughout Room / Door # 107,108, 109,116, 125,127, 135, 143, RO room, IT room, treatment areas, Ok to install borders must provide access to above rooms with open j boxes
Piers/Caissons Inspection - Commercial Passed 2/3/2021 (11:00) 2/3/2021 02/03/2021
Misc
Informational
02/03/2021
(2) piers @ trash enclosure for gates
Above Ceiling Inspection Passed 2/3/2021 2/3/2021 02/03/2021
Miscellaneous Correction
Resolved
02/03/2021
Sprinkler - Flow Test Passed 2/4/2021 02/04/2021
Alarm Test Failed 2/4/2021 02/04/2021
Alarm Test Passed 2/18/2021 02/18/2021
Gas Piping Inspection - Commercial Passed 11/25/2020 02/18/2021
All Rough Inspection - Commercial Passed 2/3/2021 02/18/2021
Misc
Resolved
02/18/2021
Rated Assembly Inspection Passed 2/3/2021 02/18/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
12/01/2020
- SCREW PATTERN SMOKE WALLS ELECTRICAL ROOM & WATER CONDITIONING ROOM -
Occupancy Inspection - Planning Temporary C of O 2/23/2021 02/23/2021
Misc
Corrective Action Required
02/23/2021
Complete landscaping off SW building corner.
Occupancy Inspection - Codes Commercial Failed 2/23/2021 2/23/2021 02/23/2021
Misc
Corrective Action Required
02/23/2021
Engineering Basin failed Planning complete landscaping Fire interior exit light east vestibule Fire Exterior light north entry Water backflow pending Complete base at FRP Complete signage Restroom mirrors, soap dispensers, paper towel holders Home training room 3 GFCI at sink & cover plates GFCI's exam room #3 not working Secure GFCI right of sink staff lounge Door Thresholds south loading zone Receptacle cover plate nurse manager room Receptacle cover plates under countertops treatment area Remove trash from roof
Occupancy Inspection - Fire Passed 2/23/2021 02/23/2021
Occupancy Inspection - Water Utilities Passed 2/23/2021 02/24/2021
Occupancy Inspection - Engineering Passed 2/26/2021 2/26/2021 02/26/2021
Misc
Informational
02/23/2021
Bair Excavating made the required repairs to the detention basin. Depending any issues with the as-builds, I see no reason to hold up TCO. All other remaining items are ok for the punch list. RP 2-23-21
Misc
Informational
02/26/2021
Detention basin is good to go for a TCO, but not a CO. RP 2-26-21
Occupancy Inspection - Codes Commercial Temporary C of O 2/26/2021 2/26/2021 02/26/2021
Misc
Corrective Action Required
02/23/2021
Engineering Basin failed Planning complete landscaping TCO for 30 days
Occupancy Inspection - Planning Passed 03/04/2021
Misc
Corrective Action Required
02/23/2021
Complete landscaping off SW building corner.
Occupancy Inspection - Codes Commercial Failed 3/16/2021 3/16/2021 03/16/2021
Misc
Corrective Action Required
02/26/2021
Engineering Basin failed Planning complete landscaping TCO for 30 days
Occupancy Inspection - Codes Commercial Full C of O 03/31/2021
Misc
Resolved
03/31/2021
Engineering Basin failed Planning complete landscaping TCO for 30 days
Documents & Images
Date Uploaded File Type Document Name
12/10/2019 Letter Fire Building Plan Review
12/12/2019 Letter DS P/R Corrections Document
12/26/2019 Letter Fire Building Plan Review
12/27/2019 Letter DS P/R Corrections Document
01/14/2020 Letter Fire Building Plan Review
01/16/2020 Letter DS P/R Corrections Document
01/21/2020 Letter Fire (Alarm) Plan Review Notice
01/22/2020 Letter Fire Building Plan Review
02/06/2020 Engineer Report/Study DCI Lee's Summit - Letter of Intent-sealed
02/12/2020 Receipt Receipt for transaction: 2020-000576
02/27/2020 Letter DS Building Permit
02/27/2020 Letter License Tax Bill
05/20/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter INSPECTION SUMMARY
05/27/2020 Plans Approved - 19293 DCI Lee's Summit - Sheet S2.1 Rev. 20.03.09
06/03/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
07/13/2020 Letter Fire (Sprinkler) Plan Review
11/04/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter Codes Plan Review Conditions
11/25/2020 Letter INSPECTION SUMMARY
12/01/2020 Letter INSPECTION SUMMARY
12/02/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/22/2020 Concrete Compressive Strength Test Special Inspections - DCI Lee's Summit - 9_24_20
12/22/2020 Concrete Sample Pickup Reports - DCI Lee's Summit - 12_19_20
12/22/2020 Asphalt Special Inspections - DCI Lee's Summit - 9_28_20
12/22/2020 Interior & Canopy Baseplates Special Inspection - DCI Lee's Summit - 8_31_20
12/22/2020 Foundation Observations Special Inspections - DCI Lee's Summit - 12_18_20
12/22/2020 Post Installed Anchored Special Inspections - DCI Lee's Summit - 8_6_20
12/22/2020 Proofrolling Observations - DCI Lee's Summit - 9_22_20
12/22/2020 Field Density Testing Special Inspction Reports - DCI Lee's Summit - 5_6_20
12/22/2020 Reinforcing Steel Observations - DCI Lee's Summit - 12_18_20
12/22/2020 Soil Compaction Characteristics Special Inspection - DCI Lee's Summit - 5_4_20
12/22/2020 Wood Framing Obserations Special Inspections - DCI Lee's Summit - 12_2_20
12/22/2020 Soil Sample Pickup Reports - DCI Lee's Summit - 5_4_20
12/22/2020 Nailing & Framing Certification Notorized Letter - Wolf Construction
12/22/2020 Underslab Electrical Certification Letter - Empowered Electric
12/22/2020 Tower Truss Replacement Documentation
12/23/2020 Receipt Receipt for transaction: 2020-008205
01/08/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/04/2021 Letter Fire Loss Reduction Form
02/04/2021 Letter INSPECTION SUMMARY
02/04/2021 Letter Fire Loss Reduction Form
02/18/2021 Letter Fire Loss Reduction Form
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter Fire Loss Reduction Form
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter Codes Temporary Certificate of Occupancy
03/16/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter Field Certificate of Occupancy
03/31/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home