Permit Application Status

PRCOM20193219


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193219
Building Permit - Commercial
Certificate of Occupancy
LSMOB OWNER LLC
NEW TENANT FINISH
TENANT FINISH FOR PHYSICAL THERAPY
11/01/2019
01/29/2020
05/05/2020
03/13/2020
Locations
Contacts
EXCEL CONSTRUCTORS, INC, Address:8041 W 47TH ST, Phone:(913) 261-1000  
EDWARDS MCDOWELL INC, Address:400 E 10TH AVE, Phone:(816) 221-7878  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
VAUGHAN MECHANICAL INC, Address:4220 NE 34TH , Phone:(816) 453-3400  
TROY.BECHTEL@EXCELCONSTRUCTORS.COM  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
LSMOB OWNER LLC, Address:11715 ADMINISTRATION DR STE 200  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 02/10/2020
Michael Weissenbach
Misc
Corrective Action Required
02/10/2020

(Informational Purposes) Update records showing 2016 NFPA and 2018 I-Series.
Licensed Contractors Approved 11/19/2019 12/13/2019
Joe Frogge
LC - MEP Subs
Resolved
12/13/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/13/19 - acknowledged in letter
Building Plan Review Approved with Conditions 11/19/2019 11/13/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/12/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 11/13/19 - acknowledged in letter
IPC 918.1 Air admittance valve
Resolved
11/13/2019

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Modify plumbing design to comply.
Suite address
Corrective Action Required
11/12/2019

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been assigned as 2861 NE Independence Ave, Unit:104. Please update your records. (reprint of entire set not required) 11/13/19 - acknowledged in letter
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
11/13/2019

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Coffee service cabinetry to be maximum 34" high. (increased height at under counter equipment is acceptable)
Fire Plan Review Approved with Conditions 11/19/2019 11/13/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/12/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Tenant identification
Corrective Action Required
11/12/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection) Address the Suite with 104 on the corridor side.
Construction documents - Fire protection systems
Corrective Action Required
11/12/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
11/12/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 11/13/2019 11/07/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/07/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IPC 918.1 Air admittance valve
Corrective Action Required
11/07/2019

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Modify plumbing design to comply.
Suite address
Corrective Action Required
11/07/2019

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been assigned as 2861 NE Independence Ave, Unit:104. Please update your records. (reprint of entire set not required)
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
11/07/2019

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Coffee service cabinetry to be maximum 34" high. (increased height at under counter equipment is acceptable)
Licensed Contractors Rejected 11/13/2019 11/07/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
11/07/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/13/2019 11/04/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/04/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide three sets of PE stamped shop drawings.
Tenant identification
Corrective Action Required
11/04/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection) Address the Suite with 102 on the corridor side.
Construction documents - Fire protection systems
Corrective Action Required
11/04/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
11/04/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
7232302-Commercial License Tax Fee $12,510.00 $12,510.00 Paid 03/13/2020
9110078-Valuation Fee for New Tenent Finish $1,029.04 $1,029.04 Paid 12/26/2019
8331506-EFHB Maybrook, Full $42.61 $42.61 Paid 12/26/2019
8331507-Sewer Connection Fee $30.00 $30.00 Paid 12/26/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Partial 2/20/2020 2/20/2020 01/09/2020
In-wall Inspection Partial 1/9/2020 01/09/2020
Underslab Plumbing Inspection - Commercial Passed 1/29/2020 1/29/2020 01/29/2020
Underground Plumbing Inspection - Commercial Passed 01/29/2020
Underslab Electrical Inspection - Commercial Passed 1/29/2020 1/29/2020 01/29/2020
Above Ceiling Inspection Passed 2/24/2020 2/24/2020 01/29/2020
In-wall Inspection Passed 2/6/2020 1/29/2020 01/29/2020
In-wall Inspection Passed 2/6/2020 at 1:35 PM 02/06/2020
Alarm Test Passed 3/5/2020 03/05/2020
Occupancy Inspection - Codes Commercial Temporary C of O 3/5/2020 03/05/2020
Misc
Corrective Action Required
03/05/2020
COMPLETE INSTALLING SINK AND COUNTER
Occupancy Inspection - Codes Commercial Full C of O 3/13/2020 3/13/2020 03/13/2020
Misc
Resolved
03/13/2020
LICENSE TAX FEE MUST BE PAID PRIOR TO ISSUANCE OF CO
Documents & Images
Date Uploaded File Type Document Name
11/01/2019 Letter License Tax Bill
11/04/2019 Letter Fire Building Plan Review
11/07/2019 Letter DS P/R Corrections Document
11/13/2019 Letter Fire Building Plan Review
12/13/2019 RE EXOX Physical Therapy - plan review PRCOM20193219
12/26/2019 Receipt Receipt for transaction: 2019-007836
01/09/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter DS Building Permit
01/29/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter Fire (Sprinkler) Plan Review
03/05/2020 Letter Codes Temporary Certificate of Occupancy
03/13/2020 Letter Codes Final Certificate of Occupancy
03/13/2020 Letter Field Certificate of Occupancy
03/13/2020 Receipt Receipt for transaction: 2020-001142
10/12/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home