Summary
PRCOM20193058
Building Permit - Commercial
Final Completion
METCALF BANK
PARTIAL COMMERCIAL
The Princeton - foundation and underslab permit Full building permit: PRCOM20191614 (SENIOR LIVING APARTMENTS WITH INDEPENDENT LIVING, ASSISTED LIVING, AND MEMORY CARE - INCLUDES POOL AND AMENITIES)
10/17/2019
01/23/2020
06/14/2021
Locations
Contacts
METCALF BANK, Address:609 NE 291 HWY  
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
CLAYCO ELECTRIC COMPANY, Address:319 E 11TH AVE, Phone:(816) 221-0593  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
LEES SUMMIT SENIOR COMMUNITY LLC, Address:5051 S NATIONAL AVE STE 4-100  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/31/2019 12/31/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Partial Commercial $30.00 $30.00 Paid 10/17/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 2/4/2020 02/04/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/04/2020
Section "C"- rooms 1026,28,30
Footing Inspection - Commercial Partial 2/5/2020 02/05/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/04/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062
Footing Inspection - Commercial Partial 2/6/2020 2/6/2020 02/06/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/05/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3, 1027,1025,1023, 1021
Footing Inspection - Commercial Partial 2/7/2020 2/7/2020 02/07/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/06/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3(S03)1027,1025,1023, 1021 Section C 1019,1017,1015,105.7A,105.6,105.5,105.1,103.2A,103.3, Stair 1(S01),105.9
Footing Inspection - Commercial Partial 2/10/2020 2/10/2020 02/10/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/07/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3(S03)1027,1025,1023, 1021 Section C, A 1019,1017,1015,1057A,1056,1055,1031,1032A,1033, Stair 1(S01),1059 Section C,A,B 1013,1011,1009,1007,1005,1003, 1001, 1037
Footing Inspection - Commercial Partial 2/11/2020 (1:15) 2/11/2020 02/11/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/10/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3(S03)1027,1025,1023, 1021 Section C, A 1019,1017,1015,1057A,1056,1055,1031,1032A,1033, Stair 1(S01),1059 Section C,A,B 1013,1011,1009,1007,1005,1003, 1001, 1037 Section B 1006,1008,1010,1012,1014
Underslab Plumbing Inspection - Commercial Partial 2/12/2020 2/12/2020 at 11:25 AM 02/12/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/12/2020
"C" SECTION- main trunk line to 2 rooms of "A"
Underslab Plumbing Inspection - Commercial Partial 2/18/2020 02/18/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/12/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line
Footing Inspection - Commercial Partial 2/18/2020 02/18/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/11/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3(S03)1027,1025,1023, 1021 Section C, A 1019,1017,1015,1057A,1056,1055,1031,1032A,1033, Stair 1(S01),1059 Section C,A,B 1013,1011,1009,1007,1005,1003, 1001, 1037 Section B 1006,1008,1010,1012,1014, EAST WALL A-CORNER OF G COLUMN PADS SECTION C-9NORTH END
Footing Inspection - Commercial Partial 2/19/2020 2/19/2020 02/19/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/18/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3(S03)1027,1025,1023, 1021 Section C, A 1019,1017,1015,1057A,1056,1055,1031,1032A,1033, Stair 1(S01),1059 Section C,A,B 1013,1011,1009,1007,1005,1003, 1001, 1037 Section B 1006,1008,1010,1012,1014, EAST WALL A-CORNER OF G COLUMN PADS SECTION C-9NORTH END SECTION A ELEVATOR PIT, 4 SPREAD FOOTINGS SECTION B 13 SPREAD FOOTINGS SECTION C 3 SPREAD FOOTINGS FOOTING 1002,1004,1040,1041 (POOL) 1 SIDE GRADE BEAM A & C
Underslab Plumbing Inspection - Commercial Partial 2/20/2020 2/20/2020 02/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/18/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved.
Underslab Plumbing Inspection - Commercial Partial 2/21/2020 2/21/2020 02/21/2020
Misc
Informational
02/21/2020
96’ of 8” main from kitchen to room 162
Footing Inspection - Commercial Partial 2/27/2020 2/27/2020 02/27/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/19/2020
Section "C"- rooms 1026,28,30 Section C rooms 1024,1022,1020,1018,1016,1062 Section C stair 3(S03)1027,1025,1023, 1021 Section C, A 1019,1017,1015,1057A,1056,1055,1031,1032A,1033, Stair 1(S01),1059 Section C,A,B 1013,1011,1009,1007,1005,1003, 1001, 1037 Section B 1006,1008,1010,1012,1014, EAST WALL A-CORNER OF G COLUMN PADS SECTION C-9NORTH END SECTION A ELEVATOR PIT, 4 SPREAD FOOTINGS SECTION B 13 SPREAD FOOTINGS SECTION C 3 SPREAD FOOTINGS FOOTING 1002,1004,1040,1041 (POOL) 1 SIDE GRADE BEAM A & C Section A/B 6 interior spreads Section B unit 1013,1014; stair S02 footing Footing unti 1040 @pool
Footing Inspection - Commercial Partial 2/28/2020 02/28/2020
Misc
Informational
02/28/2020
2/28/20 Building F footing N , E , S, sides
Underslab Plumbing Inspection - Commercial Partial 2/28/2020 2/28/2020 02/28/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/21/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk
Footing Inspection - Commercial Partial 3/2/2020 (1:15) 3/2/2020 at 1:20 PM 03/02/2020
Misc
Partial Correction
03/02/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";
Underslab Plumbing Inspection - Commercial Partial 3/2/2020 3/2/2020 at 2:10 PM 03/02/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/02/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90';
Footing Inspection - Commercial Partial 3/3/2020 (1:15) 3/3/2020 03/03/2020
Misc
Partial Correction
03/02/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f
Footing Inspection - Commercial Partial 3/4/2020 at 1:35 PM 03/04/2020
Misc
Partial Correction
03/03/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f; AT AREA "D" A TO B TO C; D TO E;
Footing Inspection - Commercial Partial 3/5/2020 3/5/2020 at 1:00 PM 03/05/2020
Misc
Partial Correction
03/04/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM;
Underslab Plumbing Inspection - Commercial Partial 3/6/2020 3/6/2020 03/06/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/02/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD.
Footing Inspection - Commercial Partial 3/6/2020 03/06/2020
Misc
Partial Correction
03/05/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F
Underslab Plumbing Inspection - Commercial Partial 3/12/2020 3/12/2020 03/12/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/06/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A”
Footing Inspection - Commercial Partial 3/13/2020 (1:00) 3/13/2020 03/13/2020
Misc
Partial Correction
03/06/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9)
Footing Inspection - Commercial Partial 3/23/2020 (1:15) 3/23/2020 03/23/2020
Misc
Partial Correction
03/13/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors
Footing Inspection - Commercial Partial 3/25/2020 3/25/2020 03/25/2020
Misc
Partial Correction
03/23/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings
Footing Inspection - Commercial Partial 3/26/2020 (1:15) 3/26/2020 03/26/2020
Misc
Partial Correction
03/25/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive
Underslab Plumbing Inspection - Commercial Partial 4/2/2020 4/2/2020 04/02/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/12/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A” - - 4/2/20 BLG "C" UNDERSLAB ALL UNITS COMPLETE EXITS BLG TO NORTH -
Underslab Plumbing Inspection - Commercial Partial 4/9/2020 04/09/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/02/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A” - - 4/2/20 BLG "C" UNDERSLAB ALL UNITS COMPLETE EXITS BLG TO NORTH AREA IL A on Plan Sheet IL P0.2
Underslab Electrical Inspection - Commercial Partial 4/9/2020 4/9/2020 04/09/2020
Misc
Corrective Action Required
04/09/2020
corner c, b
Underslab Plumbing Inspection - Commercial Partial 4/23/2020 4/23/2020 04/23/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/09/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A” - - 4/2/20 BLG "C" UNDERSLAB ALL UNITS COMPLETE EXITS BLG TO NORTH AREA IL A on Plan Sheet IL P0.2 - - 4/23/20 MIDDLE SECTION AREA "B" PLUMBING DRAWINGS KITCHEN,BATHS, UNITS COMPLETE -
Underslab Plumbing Inspection - Commercial Partial 5/6/2020 5/6/2020 05/06/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/23/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A” - - 4/2/20 BLG "C" UNDERSLAB ALL UNITS COMPLETE EXITS BLG TO NORTH AREA IL A on Plan Sheet IL P0.2 - - 4/23/20 MIDDLE SECTION AREA "B" PLUMBING DRAWINGS KITCHEN,BATHS, UNITS COMPLETE - - 5/6/20 BLDG G & F, KITCHEN AREA -
Underslab Plumbing Inspection - Commercial Partial 5/13/2020 5/13/2020 05/13/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/06/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A” - - 4/2/20 BLG "C" UNDERSLAB ALL UNITS COMPLETE EXITS BLG TO NORTH AREA IL A on Plan Sheet IL P0.2 - - 4/23/20 MIDDLE SECTION AREA "B" PLUMBING DRAWINGS KITCHEN,BATHS, UNITS COMPLETE - - 5/6/20 BLDG G & F, KITCHEN AREA - - AREA "E" UNDERSLAB OK TO COVER -
Underslab Electrical Inspection - Commercial Partial 5/15/2020 5/15/2020 05/15/2020
Misc
Corrective Action Required
04/09/2020
CORNER C, B Area G, KITCHEN MAIN SERVICE ENTRANCE
Underslab Plumbing Inspection - Commercial Passed 5/21/2020 5/21/2020 05/21/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/13/2020
"C" SECTION- main trunk line to 2 rooms of "A" "B" main trunk line, B east to connection of A, south to G building, see plans for areas approved. “E” main truck line “A” west to “C” main trunk; MAIN DRAIN UNDER CORR 177 EAST 90'; MAIN AROUNF E&F COURT YARD. “A” main trunk NSEW complete “A” - - 4/2/20 BLG "C" UNDERSLAB ALL UNITS COMPLETE EXITS BLG TO NORTH AREA IL A on Plan Sheet IL P0.2 - - 4/23/20 MIDDLE SECTION AREA "B" PLUMBING DRAWINGS KITCHEN,BATHS, UNITS COMPLETE - - 5/6/20 BLDG G & F, KITCHEN AREA - - AREA "E" UNDERSLAB OK TO COVER - -AREA “D” UNDERSLAB OK TO COVER-
Underslab Electrical Inspection - Commercial Partial 5/26/2020 5/26/2020 05/26/2020
Misc
Corrective Action Required
05/15/2020
CORNER C, B Area G, KITCHEN MAIN SERVICE ENTRANCE Area D & E 5/26/20
Footing Inspection - Commercial Partial 6/18/2020 (1:00) 6/18/2020 06/18/2020
Misc
Partial Correction
03/26/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive
Misc
Informational
06/18/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY -
Footing Inspection - Commercial Partial 6/19/2020 (1:00) 6/19/2020 06/19/2020
Misc
Partial Correction
06/18/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive
Misc
Informational
06/18/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM :
Footing Inspection - Commercial Partial 6/22/2020 6/22/2020 06/22/2020
Misc
Partial Correction
06/19/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive
Misc
Informational
06/19/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM : - FOOTING FOR GENERATOR ENCLOSURE EAST SIDE - - Michael Harkins 06/22/2020 1:40 PM -
Underground Electrical Inspection - Commercial Partial 6/29/2020 6/29/2020 06/29/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/29/2020
- (6) 3" CONDUITS GENERATOR TO BLDG "E" - - (2 )4" CONDUITS BUILDING "F"TO TRENCH FOR ABOVE -
Underground Electrical Inspection - Commercial Partial 7/6/2020 7/6/2020 07/06/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/29/2020
- (6) 3" CONDUITS GENERATOR TO BLDG "E" - - (2 )4" CONDUITS BUILDING "F"TO TRENCH FOR ABOVE - - CONDUIT BLDG G 200' TOWARDS TRASH ENCLOSURE -
Footing Inspection - Commercial Partial 7/6/2020 7/6/2020 07/06/2020
Misc
Partial Correction
06/22/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive
Misc
Informational
06/22/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM : - FOOTING FOR GENERATOR ENCLOSURE EAST SIDE - - Michael Harkins 06/22/2020 1:40 PM - - (2) SPREAD FOOTINGS SW CORNER MEMORY CARE - - (1) SPREAD FOOTING NE VESEBUL (FIRE HYDRANT) -
Pool Steel/Bonding - Commercial Partial 7/21/2020 07/21/2020
E680 Swimming Pools
Informational
07/21/2020
- POOL SHELL BONDING APPROVED -
Foundation Inspection - Commercial Partial 12/3/2020 12/3/2020 12/03/2020
Miscellaneous Correction
Informational
12/03/2020
-Generator pad
Footing Inspection - Commercial Partial 12/8/2020 (8:30) 12/8/2020 12/08/2020
Misc
Partial Correction
07/06/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive Building “C” patio footings all of east side and one on southeast
Misc
Informational
07/06/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM : - FOOTING FOR GENERATOR ENCLOSURE EAST SIDE - - Michael Harkins 06/22/2020 1:40 PM - - (2) SPREAD FOOTINGS SW CORNER MEMORY CARE - - (1) SPREAD FOOTING NE VESEBUL (FIRE HYDRANT) -
Footing Inspection - Commercial Partial 12/14/2020 (8:00) 12/14/2020 12/14/2020
Misc
Partial Correction
12/08/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive Building “C” patio footings all of east side, all of west side, and one on southeast Building “B” patio footings all of north side
Misc
Informational
12/08/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM : - FOOTING FOR GENERATOR ENCLOSURE EAST SIDE - - Michael Harkins 06/22/2020 1:40 PM - - (2) SPREAD FOOTINGS SW CORNER MEMORY CARE - - (1) SPREAD FOOTING NE VESEBUL (FIRE HYDRANT) -
Footing Inspection - Commercial Partial 12/16/2020 (2:30) 12/16/2020 12/16/2020
Misc
Partial Correction
12/14/2020
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive Building “C” patio footings all of east side, all of west side, and one on southeast Building “B” patio footings all of north side, all of south side
Misc
Informational
12/14/2020
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM : - FOOTING FOR GENERATOR ENCLOSURE EAST SIDE - - Michael Harkins 06/22/2020 1:40 PM - - (2) SPREAD FOOTINGS SW CORNER MEMORY CARE - - (1) SPREAD FOOTING NE VESEBUL (FIRE HYDRANT) -
Footing Inspection - Commercial Passed 06/14/2021
Misc
Resolved
06/14/2021
2/28/20 Building F footing N , E , S, sides; GRADE BEAM SECTIONS MARKED ON PERMIT PRINTS AS "A" THRU "D" AND "L" THRU "R";, g-f;AT AREA "D" A TO B TO C; D TO E; COURTYARD GRADE BEAMS AT "D"; AT "F" 106' GRADE BEAM; COURT YARD E&F 3/13/20 Building “F” pads/footings North (5) East (4) South (9) “F” 3 spread footings “E” 15 spread footings both corridors “E” 4 spread footings “D” 4 south, 4 west , spread footings - "D" North 6 East 2 spread footings- "D" corridor 3 spred footings- "A" 1 spread footing "D" West side footing complete footing at temp drive Building “C” patio footings all of east side, all of west side, and one on southeast Building “B” patio footings all of north side, all of south side
Misc
Resolved
06/14/2021
- BLDG A 5 SPREAD FOOTINGS FOR CANOPY - - BLDG E 4 SPREAD FOOTINGS FOR CANOPY - - FOOTING FOR TRASH ENCLOSURE EAST SIDE - : Michael Harkins 06/19/2020 9:52 AM : - FOOTING FOR GENERATOR ENCLOSURE EAST SIDE - - Michael Harkins 06/22/2020 1:40 PM - - (2) SPREAD FOOTINGS SW CORNER MEMORY CARE - - (1) SPREAD FOOTING NE VESEBUL (FIRE HYDRANT) -
Foundation Inspection - Commercial Passed 06/14/2021
Miscellaneous Correction
Resolved
06/14/2021
-Generator pad
Pool Steel/Bonding - Commercial Passed 06/14/2021
E680 Swimming Pools
Informational
07/21/2020
- POOL SHELL BONDING APPROVED -
Underground Electrical Inspection - Commercial Passed 7/21/2020 06/14/2021
THE FOLLOWING AREAS ARE APPROVED
Resolved
06/14/2021
- (6) 3" CONDUITS GENERATOR TO BLDG "E" - - (2 )4" CONDUITS BUILDING "F"TO TRENCH FOR ABOVE - - CONDUIT BLDG G 200' TOWARDS TRASH ENCLOSURE -
Underslab Electrical Inspection - Commercial Passed 06/14/2021
Misc
Resolved
06/14/2021
CORNER C, B Area G, KITCHEN MAIN SERVICE ENTRANCE Area D & E 5/26/20
Miscellaneous Inspection Passed 2/5/2020 06/14/2021
STAIR TOWER 1
Resolved
06/14/2021
Documents & Images
Date Uploaded File Type Document Name
10/17/2019 Receipt Receipt for transaction: 2019-006857
01/23/2020 Letter DS Building Permit
02/05/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/12/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/02/2020 Letter INSPECTION SUMMARY
03/02/2020 Letter INSPECTION SUMMARY
03/03/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/13/2020 Letter INSPECTION SUMMARY
03/23/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
03/26/2020 Letter INSPECTION SUMMARY
04/02/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter INSPECTION SUMMARY
05/06/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter Codes Plan Review Conditions
05/21/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/14/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home