Permit Application Status

PRCOM20192156


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192156
Building Permit - Commercial
Certificate of Occupancy
NEW COMMERCIAL
NEW GROCERY STORE FOUNDATION PERMIT - PRCOM20192982
08/09/2019
01/09/2020
02/23/2020
04/08/2021
Locations
Contacts
J PRICE ARCHITECTURE, Address:105 W KANSAS STREET, SUITE C, Phone:(816) 792-5991  
CRANE CONSTRUCTION COMPANY, Address:PO BOX 298, Phone:(816) 324-5951  
WESTERN ENTERPRISE INC, Address:956 OSAGE AVE, Phone:(913) 342-0505  
APPLE ELECTRIC INTEGRATED SOLUTIONS INC, Address:PO BOX 998, Phone:(913) 837-5285  
WESTERN ENTERPRISE INC, Address:956 OSAGE AVE, Phone:(913) 342-0505  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 03/13/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
03/13/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and a flow test.
Building Plan Review Approved with Conditions 09/30/2019 12/16/2019
Joe Frogge
Final Development Plan
Resolved
11/22/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 9/24/19 - acknowledged in letter
License Tax Application
Resolved
12/10/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 9/24/19 - acknowledged in letter
Project cost
Resolved
11/27/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 9/24/19 - acknowledged in letter
Miscellaneous Correction
Resolved
09/30/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 9/24/19 - acknowledged in letter
Health Dept Review
Resolved
12/16/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 9/24/19 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
09/23/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 9/24/19 - acknowledged in letter
Miscellaneous Correction
Resolved
09/24/2019

Insufficient information to complete review. Provide the following: - Complete Type I hood design.
Accessibility - Turning space 603.2.1
Resolved
09/24/2019

ICC A117.1-2017 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Turning radii shall be minimum 67" in diameter. Update plans and details.
Plumb - Minimum number of fixtures 403.1
Resolved
09/24/2019

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide mop sink. (wall finish materials around mop sink must comply with IBC 1209.2.2)
Bldg - Common path of egress travel 1014.3
Resolved
09/24/2019

2018 IBC 1006.2.1 Egress based on occupant load and common path of egress travel distance. Two exits or exit access doorways from any space shall be provided where the design occupant load or the common path of egress travel distance exceeds the values listed in Table 1006.2.1. The cumulative occupant load from adjacent rooms, areas or spaces shall be determined in accordance with Section 1004.2. (see code for special requirements for foyers, lobbies, vestibules, and care suites in I-2 occupancies) Action required: Common path of travel (max 75') exceeded at Back Room #159. Provide additional exit to comply. (exit shall not be directed thru meat prep)
Miscellaneous Correction
Resolved
09/24/2019

2018 IBC 1004.2.1 Intervening spaces or accessory areas. Where occupants egress from one or more rooms, areas or spaces though others, the design occupant load shall be the combined occupant load of interconnected accessory or intervening spaces. Design of egress path capacity shall be based on the cumulative portion of occupant loads of all rooms, areas or spaces to that point along the path of egress travel. Action required: Provide 2 exits out of Outside Seating #159.
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
09/23/2019

2018 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Counter designs have been deferred. Field verify for compliance of ICC/ANSI A117.1 Section 904. 9/24/19 - acknowledged in letter - to be field verified
Bldg - Types I and II construction allowable materials 602.2
Resolved
09/24/2019

2018 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Trellis over Outside Seating #159 is not allowed to be constructed of combustible materials.
Miscellaneous Correction
Resolved
09/24/2019

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
Screening - Ground mounted equipment
Corrective Action Required
09/23/2019

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how generator will be screened from all 4 sides per referenced UDO section. 9/24/19 - acknowledged in letter - to be covered in FDP - field verify
Health Department Review Approved 12/16/2019
Joe Frogge
Alarm Plan Review Released for Construction 12/09/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/09/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing
Misc
Corrective Action Required
12/09/2019

(Action Required) Label RTU's and remote test key switches for the duct detection.
Licensed Contractors Approved 09/30/2019 11/27/2019
Joe Frogge
LC - General Contractor
Resolved
11/27/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 9/24/19 - acknowledged in letter
LC - MEP Subs
Resolved
11/27/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 9/24/19 - acknowledged in letter
Final Development Plan Review Approved 11/22/2019
Joe Frogge
Special Inspections Review Approved 09/30/2019
Joe Frogge
Fire Plan Review Approved with Conditions 09/30/2019 09/25/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
09/23/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
09/23/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
09/23/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
09/23/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order a Knox box from Knoxbox.com. Placement will be made on the exterior by the FDC.
Fire protection equipment identification
Corrective Action Required
09/23/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Type I hood - Where required
Resolved
09/25/2019

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. (Action Required) Provide specs on Type 1 hood system. Show placement of K-Class extinguisher and manual pull.
Construction documents - Fire protection systems
Corrective Action Required
09/23/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
09/23/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
09/23/2019

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/23/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Misc
Resolved
09/25/2019

(Suggestion) Provide exterior access to the sprinkler room. This would allow direct access for the fire dept. Additional exit could satisfy IBC common path of travel. Reference building plan review for further information.
Duct smoke detectors
Corrective Action Required
09/23/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) Duct detection required with CFM over 2000.
Door operations
Corrective Action Required
09/23/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Illumination required
Corrective Action Required
09/23/2019

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection)
Building Plan Review Rejected 08/23/2019 08/21/2019
Joe Frogge
Final Development Plan
Corrective Action Required
08/21/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
08/21/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
08/21/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
08/21/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Health Dept Review
Corrective Action Required
08/21/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
08/21/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
08/21/2019

Insufficient information to complete review. Provide the following: - Complete Type I hood design.
Accessibility - Turning space 603.2.1
Corrective Action Required
08/21/2019

ICC A117.1-2017 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Turning radii shall be minimum 67" in diameter. Update plans and details.
Plumb - Minimum number of fixtures 403.1
Corrective Action Required
08/21/2019

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide mop sink. (wall finish materials around mop sink must comply with IBC 1209.2.2)
Bldg - Common path of egress travel 1014.3
Corrective Action Required
08/21/2019

2018 IBC 1006.2.1 Egress based on occupant load and common path of egress travel distance. Two exits or exit access doorways from any space shall be provided where the design occupant load or the common path of egress travel distance exceeds the values listed in Table 1006.2.1. The cumulative occupant load from adjacent rooms, areas or spaces shall be determined in accordance with Section 1004.2. (see code for special requirements for foyers, lobbies, vestibules, and care suites in I-2 occupancies) Action required: Common path of travel (max 75') exceeded at Back Room #159. Provide additional exit to comply. (exit shall not be directed thru meat prep)
Miscellaneous Correction
Corrective Action Required
08/21/2019

2018 IBC 1004.2.1 Intervening spaces or accessory areas. Where occupants egress from one or more rooms, areas or spaces though others, the design occupant load shall be the combined occupant load of interconnected accessory or intervening spaces. Design of egress path capacity shall be based on the cumulative portion of occupant loads of all rooms, areas or spaces to that point along the path of egress travel. Action required: Provide 2 exits out of Outside Seating #159.
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
08/21/2019

2018 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Counter designs have been deferred. Field verify for compliance of ICC/ANSI A117.1 Section 904.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
08/21/2019

2018 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Trellis over Outside Seating #159 is not allowed to be constructed of combustible materials.
Miscellaneous Correction
Corrective Action Required
08/21/2019

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
Screening - Ground mounted equipment
Corrective Action Required
08/21/2019

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how generator will be screened from all 4 sides per referenced UDO section.
Licensed Contractors Rejected 08/23/2019 08/21/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
08/21/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/21/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 08/23/2019 08/20/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
08/20/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
08/20/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
08/20/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/20/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox box from Knoxbox.com. Placement will be made on the exterior by the FDC.
Fire protection equipment identification
Corrective Action Required
08/20/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Type I hood - Where required
Corrective Action Required
08/20/2019

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. (Action Required) Provide specs on Type 1 hood system. Show placement of K-Class extinguisher and manual pull.
Construction documents - Fire protection systems
Corrective Action Required
08/20/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
08/20/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
08/20/2019

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/20/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Misc
Corrective Action Required
08/20/2019

(Suggestion) Provide exterior access to the sprinkler room. This would allow direct access for the fire dept. Additional exit could satisfy IBC common path of travel. Reference building plan review for further information.
Duct smoke detectors
Corrective Action Required
08/20/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Door operations
Corrective Action Required
08/20/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Illumination required
Corrective Action Required
08/20/2019

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $23,602.34 $23,602.34 Paid 01/09/2020
8331507-Sewer Connection Fee $1,350.00 $1,350.00 Paid 01/09/2020
7232302-Commercial License Tax Fee $281,595.00 $281,595.00 Paid 07/28/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 3/23/2020 at 3:30 PM 03/23/2020
Misc
Partial Correction
03/23/2020
-EXTERIOR WALL METAL STUD/JOIST FRAMING AT FRONT OF BUILDING, INCLUDING THE ROOFTOP-OK TO COVER
Underslab Plumbing Inspection - Commercial Partial 3/31/2020 3/31/2020 03/31/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/31/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6
Underslab Plumbing Inspection - Commercial Partial 4/1/2020 4/1/2020 04/01/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/31/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4
Underslab Electrical Inspection - Commercial Partial 4/2/2020 4/2/2020 04/01/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/01/2020
Loading dock A-C 1.9-5.2 elect
Underslab Plumbing Inspection - Commercial Partial 4/3/2020 04/03/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/01/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7 FRONT COOLER
Underslab Electrical Inspection - Commercial Partial 4/3/2020 4/3/2020 04/03/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/01/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6 LOADING DOCK
Underslab Plumbing Inspection - Commercial Partial 4/6/2020 4/6/2020 04/06/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/03/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8 FRONT COOLER
Underslab Plumbing Inspection - Commercial Partial 4/7/2020 4/7/2020 04/07/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/06/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8 DLINE 8-9.5 FRONT COOLER
Underslab Plumbing Inspection - Commercial Partial 4/8/2020 4/8/2020 04/08/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/07/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8 DLINE 8-9.5-7-8 FRONT COOLER
Underslab Electrical Inspection - Commercial Partial 4/6/2020 4/9/2020 04/09/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/03/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8
Underslab Plumbing Inspection - Commercial Partial 4/9/2020 4/9/2020 04/09/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/08/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 FRONT COOLER
Underslab Electrical Inspection - Commercial Partial 4/13/2020 4/13/2020 04/13/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/09/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9
Underslab Plumbing Inspection - Commercial Partial 4/13/2020 4/13/2020 04/13/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/09/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP- E-8.5 FRONT COOLER
Underslab Plumbing Inspection - Commercial Partial 4/14/2020 4/14/2020 04/14/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/13/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP- E-8.5 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5
Underslab Electrical Inspection - Commercial Partial 4/14/2020 4/14/2020 04/14/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/13/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 -
Underslab Plumbing Inspection - Commercial Partial 4/15/2020 4/15/2020 04/15/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/14/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP- E-8.5;6- 9 F-10- 9-e FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5
Underslab Electrical Inspection - Commercial Partial 4/15/2020 4/15/2020 04/15/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/14/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e
Underslab Plumbing Inspection - Commercial Partial 4/16/2020 4/16/2020 04/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/15/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5
Underslab Electrical Inspection - Commercial Partial 4/16/2020 4/17/2020 04/17/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/15/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR
Underslab Plumbing Inspection - Commercial Partial 4/17/2020 4/17/2020 04/17/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/16/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10
Underslab Plumbing Inspection - Commercial Partial 4/20/2020 4/20/2020 04/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/17/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. -
Underslab Electrical Inspection - Commercial Partial 4/20/2020 4/20/2020 04/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/17/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT GONDOLOAS NE -
Underslab Plumbing Inspection - Commercial Partial 4/21/2020 4/21/2020 04/21/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/20/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. -
Underslab Plumbing Inspection - Commercial Partial 4/22/2020 4/22/2020 04/22/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/21/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. - - 4/22/20 F-10 TO G-10 -
Underslab Electrical Inspection - Commercial Partial 4/21/2020 4/22/2020 04/22/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/20/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT GONDOLOAS NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES -
Underslab Plumbing Inspection - Commercial Partial 4/23/2020 4/23/2020 04/23/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/22/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5,10.7 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. - - 4/22/20 F-10 TO G-10 -
Underslab Electrical Inspection - Commercial Partial 4/23/2020 4/24/2020 04/24/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/22/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT GONDOLOAS NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES - -BEER COOLERS TO H 4.2 -
Underslab Plumbing Inspection - Commercial Partial 4/24/2020 4/24/2020 04/24/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/23/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5,10.7 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. - - 4/22/20 F-10 TO G-10 - -4/24/20 G-7 TO G10.7, COOLERS G-D 1-2,
Underslab Electrical Inspection - Commercial Partial 4/28/2020 4/28/2020 04/28/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/24/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES - -BEER COOLERS TO H 4.2 - G,H-4-6.5.
Underslab Plumbing Inspection - Commercial Partial 4/28/2020 4/28/2020 04/28/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/24/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5,10.7 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. - - 4/22/20 F-10 TO G-10-7.5-10 -4/24/20 G-7 TO G10.7, COOLERS G-D 1-2,
Underslab Plumbing Inspection - Commercial Partial 4/29/2020 4/29/2020 04/29/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/28/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5,10.7 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. - - 4/22/20 F-10 TO G-10-7.5-10 -4/24/20 G-7 TO G10.7, COOLERS G-D 1-2, -4/29/20 TEA BAR UNDERSLAB OK TO COVER -
Underslab Electrical Inspection - Commercial Partial 4/29/2020 4/29/2020 04/29/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/28/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES - -BEER COOLERS TO H 4.2 - G,H-4-6.5. - - 4/29/20 TEA BAR & SEATING AREA UNDER WINDOWS -
Underslab Electrical Inspection - Commercial Partial 4/30/2020 4/30/2020 04/30/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/29/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES - -BEER COOLERS TO H 4.2 - G,H-4-6.5. -;G-7.5-10 - 4/29/20 TEA BAR & SEATING AREA UNDER WINDOWS -
Underslab Electrical Inspection - Commercial Partial 5/1/2020 5/1/2020 05/01/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/30/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES - -BEER COOLERS TO H 4.2 - G,H-4-6.5. -;G-7.5-10 - 4/29/20 TEA BAR & SEATING AREA UNDER WINDOWS - CENTER FRONT FLORAL.
Underslab Plumbing Inspection - Commercial Passed 4/30/2020 5/12/2020 05/12/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
05/12/2020
MAIN TRUNK LINES- C-LINE-3.7-5.5 F LINE-6.5-8.6 D LINE 1.9-4; 4-9 MAIN TRUNK, D LINE 5.2-7-8-9 DLINE 8-9.5-7-8 PREP-AREA- E-8.5;6- 9 F-10- 9-E;E-F 7.5-9;10.5,10.7 FRONT COOLER - GREASE LINES COLUMN 9 LINE D TO E .5 4/17/20 F 7.5 - 10 - 4/20/20 F 7.5 VENT, FLOOR SINK. F 10 FLOOR SINKS NEAR SIDE DOOR WALL. - - 4/22/20 F-10 TO G-10-7.5-10 -4/24/20 G-7 TO G10.7, COOLERS G-D 1-2, -4/29/20 TEA BAR UNDERSLAB OK TO COVER -
All Rough Inspection - Commercial Partial 5/12/2020 05/12/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/12/2020
ALL TRADES MEP'S WALL SECTIONS: PENDING APPROVAL 1 LINE D-H PENDING FOR FRIDAY 5/12 AREA 11 LINE D-H
Misc
Corrective Action Required
05/12/2020
install pipe insulation and boca plates as required in wall. RESCHEDULE FOR 5/13
Rough Framing Inspection - Commercial Partial 5/12/2020 5/12/2020 05/12/2020
Misc
Informational
08/20/2020
-EXTERIOR WALL METAL STUD/JOIST FRAMING AT FRONT OF BUILDING, INCLUDING THE ROOFTOP-OK TO COVER;FRONT OFFICE EXTERIOR WALL.
All Rough Inspection - Commercial Partial 5/13/2020 05/12/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/12/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H PENDING FOR FRIDAY 5/12 AREA 11 LINE D-H
Misc
Resolved
05/12/2020
install pipe insulation and boca plates as required in wall. RESCHEDULE FOR 5/13
All Rough Inspection - Commercial Partial 5/14/2020 5/14/2020 05/14/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/12/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11;
All Rough Inspection - Commercial Partial 5/15/2020 5/15/2020 05/15/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/14/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6
Hood/Duct Inspection Partial 5/27/2020 5/27/2020 05/27/2020
Misc
Corrective Action Required
05/27/2020
5 sections
Misc
Partial Correction
05/27/2020
5 sections ok 1 section has pin hole with MH wrote near hole for reinspect
Hood/Duct Inspection Partial 5/28/2020 5/28/2020 05/28/2020
Misc
Informational
05/28/2020
5 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Resolved
05/28/2020
5 sections ok 1 section has pin hole with MH wrote near hole for reinspect
All Rough Inspection - Commercial Partial 6/2/2020 6/2/2020 06/02/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/15/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT
All Rough Inspection - Commercial Partial 6/5/2020 6/5/2020 06/05/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/02/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
All Rough Inspection - Commercial Partial 6/12/2020 6/12/2020 06/12/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/05/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/12/2020
- DELI ISLAND SOFFIT - - BAKERY ISLAND SOFFIT - - OFFICES AT ENTRY - Michael Harkins 06/12/2020 1:09 PM
Hood/Duct Inspection Partial 6/18/2020 6/18/2020 06/18/2020
Misc
Informational
05/28/2020
6 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Informational
06/18/2020
WELDS APPROVED HOOD DUCTS #4 #5 #6 ( 2 PCS )
All Rough Inspection - Commercial Partial 6/18/2020 6/18/2020 06/18/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/12/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/12/2020
- DELI ISLAND SOFFIT - - BAKERY ISLAND SOFFIT - - OFFICES AT ENTRY - Michael Harkins 06/12/2020 1:09 PM - TEA BAR WALLS & SOFFIT -
Electrical Service Inspection Passed 6/19/2020 6/19/2020 06/19/2020
Hood/Duct Inspection Partial 6/23/2020 6/23/2020 06/23/2020
Misc
Informational
06/18/2020
6 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Informational
06/18/2020
WELDS APPROVED HOOD DUCTS #4 #5 #6 ( 2 PCS ) VERTICAL GROUND WELDS HOODS 1,2,3,-OK
All Rough Inspection - Commercial Partial 6/23/2020 6/23/2020 06/23/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
08/20/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
THE FOLLOWING AREAS ARE APPROVED
Resolved
08/20/2020
- DELI ISLAND SOFFIT - - BAKERY ISLAND SOFFIT - - OFFICES AT ENTRY - Michael Harkins 06/12/2020 1:09 PM - TEA BAR WALLS & SOFFIT - - BREAKROOM, 4 RESTROOMS,BACK HALL, OFFICE, RECEIVING,ROOMS WEST OF SALES FLOOR.
All Rough Inspection - Commercial Partial 6/29/2020 6/29/2020 06/29/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/23/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/23/2020
- DELI ISLAND SOFFIT - - BAKERY ISLAND SOFFIT - - OFFICES AT ENTRY - Michael Harkins 06/12/2020 1:09 PM - TEA BAR WALLS & SOFFIT - - BREAKROOM, 4 RESTROOMS,BACK HALL, OFFICE, RECEIVING,ROOMS WEST OF SALES FLOOR.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/29/2020
ELECTRICAL: -SIGN BOXES ABOVE WINDOWS DELI SEATING AREA - - LIGHTS & CAMERAS ENTRY CEILING - - DELI & BAKERY ISLANDS CAN LIGHTS -
Hood/Duct Inspection Partial 6/29/2020 6/29/2020 06/29/2020
Misc
Informational
06/23/2020
6 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Informational
06/23/2020
WELDS APPROVED HOOD DUCTS #4 #5 #6 ( 2 PCS ) VERTICAL GROUND WELDS HOODS 1,2,3,-OK
Misc
Corrective Action Required
06/29/2020
- (6) INSTALLED HOODS IN DELI AREA WELDS APPROVED OK FOR 1ST LAYER WRAP -
Hood/Duct Inspection Partial 7/1/2020 7/1/2020 07/01/2020
Misc
Informational
06/29/2020
6 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Informational
06/29/2020
WELDS APPROVED HOOD DUCTS #4 #5 #6 ( 2 PCS ) VERTICAL GROUND WELDS HOODS 1,2,3,-OK
Misc
Corrective Action Required
06/29/2020
- (6) INSTALLED HOODS IN DELI AREA WELDS APPROVED OK FOR 1ST LAYER WRAP - - (6) HOOD 1ST LAYER WRAP APPROVED OK FOR 2ND LAYER OF WRAP -
All Rough Inspection - Commercial Partial 7/1/2020 7/1/2020 07/01/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/29/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/29/2020
- DELI ISLAND SOFFIT - - BAKERY ISLAND SOFFIT - - OFFICES AT ENTRY - Michael Harkins 06/12/2020 1:09 PM - TEA BAR WALLS & SOFFIT - - BREAKROOM, 4 RESTROOMS,BACK HALL, OFFICE, RECEIVING,ROOMS WEST OF SALES FLOOR. - FLORAL DEPT, PRODUCE DIVIDING WALL, -
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/29/2020
ELECTRICAL: -SIGN BOXES ABOVE WINDOWS DELI SEATING AREA - - LIGHTS & CAMERAS ENTRY CEILING - - DELI & BAKERY ISLANDS CAN LIGHTS -
Hood/Duct Inspection Partial 7/7/2020 7/7/2020 07/07/2020
Misc
Informational
07/01/2020
6 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Informational
07/01/2020
WELDS APPROVED HOOD DUCTS #4 #5 #6 ( 2 PCS ) VERTICAL GROUND WELDS HOODS 1,2,3,-OK
Misc
Corrective Action Required
07/01/2020
- (6) INSTALLED HOODS IN DELI AREA WELDS APPROVED OK FOR 1ST LAYER WRAP - - (6) HOODs 1ST LAYER WRAP APPROVED OK FOR 2ND LAYER OF WRAP - - (6) HOODS 2ND LAYER/ BANDING APPROVED - Michael Harkins 07/07/2020 8:55 AM
Gas Piping Inspection - Commercial Passed 7/16/2020 7/16/2020 07/16/2020
Gas Service Inspection - Commercial Passed 7/17/2020 7/17/2020 07/17/2020
Above Ceiling Inspection Partial 7/20/2020 7/20/2020 07/20/2020
Misc
Corrective Action Required
07/20/2020
- support MC over meat counter. -2 open boxes over south center kitchen area. - front popcorn area still working.
Above Ceiling Inspection Partial 7/21/2020 7/21/2020 07/21/2020
Misc
Corrective Action Required
07/20/2020
Areas approved- Meat area & kitchen - front popcorn area still working.
Above Ceiling Inspection Passed 7/22/2020 7/22/2020 07/22/2020
Misc
Corrective Action Required
07/21/2020
Areas approved- Meat area & kitchen - POPCORN AREA, BREAKROOM, OFFICES -
Sprinkler - Hydrostatic Test Passed 7/27/2020 07/27/2020
Occupancy Inspection - Water Utilities Passed 8/6/2020 08/06/2020
Occupancy Inspection - Fire Passed 8/6/2020 8/6/2020 08/06/2020
Occupancy Inspection - Codes Commercial Temporary C of O 8/6/2020 8/6/2020 08/06/2020
Misc
Corrective Action Required
08/06/2020
- TCO TO TRAIN & STOCK ONLY - : - LABLE RTU DISCONNECTS - - WOMENS RESTROOM STALL DOOR - - FIRE CAULK CEILING DRY SPRINKLER ROOM -
Occupancy Inspection - Engineering Failed 8/6/2020 08/06/2020
Informational
08/06/2020
1. Sidewalk out front has 2 panels missing 2. We need a substantial completion for the off-site public road improvements and a partial substantial completion for the private road. These item are to be taken care of by the developper. We have no items that McKeever's has to do.
Occupancy Inspection - Planning Temporary C of O 8/11/2020 08/11/2020
Underslab Electrical Inspection - Commercial Passed 5/20/2020 8/20/2020 08/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/01/2020
Loading dock A-C 1.9-5.2 elect; DLINE 4-6;7-8 E LINE 7-8 E LINE 8-9 - Gondola E to F - - Data G to H - - B refer system 5.5 to 7.2 - -E-8.5;6- 9 F-10- 9-e 4/17/20 F 7.5-10 @ SIDE DOOR - - 4/20/20 E 7 CANDY DISPLAY, 3/0 GROUND FOR COOLERS REAR WALL, CONDUIT AT NE - - 4/22/20 E-F 1 TO 6.5 FLOOR BOXES - -BEER COOLERS TO H 4.2 - G,H-4-6.5. -;G-7.5-10 - 4/29/20 TEA BAR & SEATING AREA UNDER WINDOWS - CENTER FRONT FLORAL.
Hood/Duct Inspection Passed 8/20/2020 08/20/2020
Misc
Informational
07/07/2020
6 sections 1st layer wrap 4’ from flange welds approved on all 6 sections
Misc
Informational
07/07/2020
WELDS APPROVED HOOD DUCTS #4 #5 #6 ( 2 PCS ) VERTICAL GROUND WELDS HOODS 1,2,3,-OK
Misc
Informational
07/07/2020
- (6) INSTALLED HOODS IN DELI AREA WELDS APPROVED OK FOR 1ST LAYER WRAP - - (6) HOODs 1ST LAYER WRAP APPROVED OK FOR 2ND LAYER OF WRAP - - (6) HOODS 2ND LAYER/ BANDING APPROVED - Michael Harkins 07/07/2020 8:55 AM
All Rough Inspection - Commercial Passed 8/20/2020 08/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/01/2020
ALL TRADES MEP'S WALL SECTIONS: 1 LINE D-H; 11 LINE D-H;D LINE 1-11; LINE 6-9 H EXTERIOR STOCK ROOM SIDE LINE D6 BAKERY AREA POPCORN SALES PRODUCE PREP SEAFOOD DEPARTMENT MEAT DEPARTMENT CATERING DEPARTMENT DELI DEPARTMENT G LINE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/01/2020
- DELI ISLAND SOFFIT - - BAKERY ISLAND SOFFIT - - OFFICES AT ENTRY - Michael Harkins 06/12/2020 1:09 PM - TEA BAR WALLS & SOFFIT - - BREAKROOM, 4 RESTROOMS,BACK HALL, OFFICE, RECEIVING,ROOMS WEST OF SALES FLOOR. - FLORAL DEPT, PRODUCE DIVIDING WALL, -
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/01/2020
ELECTRICAL: -SIGN BOXES ABOVE WINDOWS DELI SEATING AREA - - LIGHTS & CAMERAS ENTRY CEILING - - DELI & BAKERY ISLANDS CAN LIGHTS -
Rough Framing Inspection - Commercial Passed 08/21/2020
Misc
Resolved
08/21/2020
-EXTERIOR WALL METAL STUD/JOIST FRAMING AT FRONT OF BUILDING, INCLUDING THE ROOFTOP-OK TO COVER;FRONT OFFICE EXTERIOR WALL.
Sprinkler - Flow Test Passed 8/4/2020 08/21/2020
Alternate Protection Systems Inspection Passed 8/4/2020 08/21/2020
Alarm Test Passed 8/4/2020 08/21/2020
Occupancy Inspection - Codes Commercial Temporary C of O 8/20/2020 09/04/2020
Misc
Informational
09/02/2020
Full TCO to open for business
Occupancy Inspection - Engineering Temporary C of O 8/20/2020 09/04/2020
Occupancy Inspection - Planning Passed 09/08/2020
Occupancy Inspection - Codes Commercial Full C of O 04/08/2021
Misc
Resolved
04/08/2021
Full TCO to open for business
Occupancy Inspection - Engineering Passed 04/08/2021
Misc
Informational
02/19/2021
Waiting on Final Acceptance for the off- site infrastructure. McKeever's punch list is completed. Dawn will close this out when the infrastructure has been given final acceptance.
Occupancy Inspection - Engineering Passed 04/08/2021
Misc
Resolved
04/08/2021
Waiting on Final Acceptance for the off- site infrastructure. McKeever's punch list is completed. Dawn will close this out when the infrastructure has been given final acceptance.
Documents & Images
Date Uploaded File Type Document Name
08/21/2019 Letter Fire Building Plan Review
08/21/2019 Letter DS P/R Corrections Document
09/25/2019 Letter Fire Building Plan Review
09/30/2019 Special Inspections Letter
12/09/2019 Letter Fire (Alarm) Plan Review Notice
12/16/2019 Letter License Tax Bill
01/09/2020 Receipt Receipt for transaction: 2020-000110
01/09/2020 Letter DS Building Permit
03/13/2020 Letter Fire (Sprinkler) Plan Review
03/23/2020 Letter INSPECTION SUMMARY
03/31/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
04/06/2020 Letter INSPECTION SUMMARY
04/07/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/17/2020 Letter INSPECTION SUMMARY
04/17/2020 Letter INSPECTION SUMMARY
04/21/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter Codes Plan Review Conditions
04/28/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/27/2020 Letter INSPECTION SUMMARY
05/28/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/17/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
07/22/2020 Letter INSPECTION SUMMARY
07/28/2020 Receipt Receipt for transaction: 2020-004744
08/06/2020 Letter Codes Temporary Certificate of Occupancy
08/06/2020 Letter DE-Daily Inspection Summary
09/01/2020 Email jxn cty sushi
09/04/2020 Letter Codes Temporary Certificate of Occupancy
09/04/2020 Letter Codes Temporary Certificate of Occupancy
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter Codes Temporary Certificate of Occupancy
02/19/2021 Letter INSPECTION SUMMARY
04/08/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home