Permit Application Status

PRCOM20191770


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191770
Building Permit - Commercial
Certificate of Occupancy
LSMOB OWNER LLC
NEW TENANT FINISH
TENANT FINISH FOR AMBULATORY SURGERY FACILITY
07/05/2019
09/11/2019
01/11/2020
04/07/2020
Locations
Contacts
LSMOB OWNER LLC, Address:11715 ADMINISTRATION DR STE 200  
EXCEL CONSTRUCTORS, INC, Address:8041 W 47TH ST, Phone:(913) 261-1000  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
TEMP-CON LLC, Address:15670 S KEELER ST, Phone:(913) 768-4888  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
VAUGHAN MECHANICAL INC, Address:4220 NE 34TH , Phone:(816) 453-3400  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 11/07/2019
Michael Weissenbach
Licensed Contractors Approved 08/02/2019 09/06/2019
Joe Frogge
LC - MEP Subs
Resolved
09/06/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/26/19 - acknowledged in letter
LC - MEP Subs
Resolved
09/06/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 08/02/2019 08/04/2019
Joe Frogge
Misc
Corrective Action Required
07/26/2019

This project is associated with an open shell permit. Action required: Comment is for informational purposes. Occupancy shall not be granted until shell occupancy has been granted. 7/26/19 - acknowledged in letter
Project cost
Resolved
09/09/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 7/26/19 - acknowledged in letter
Bldg - Fire partitions - Duct and air transfer openings 717.5.4
Resolved
07/26/2019

2018 IBC 716.5 Fire door assemblies. Fire door assemblies required by other sections of this code shall comply with the provisions of this section. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.2.5.4. Action required: Specify ratings for fire doors and equipment (sterilizers, etc) penetrations at wall type 'A'.
Accessibility - Water closet clearance width 604.3.1
Resolved
07/26/2019

ICC A117.1-2017 Section 604.3.1 Clearance Width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Provide minimum 60" clearance behind water closet at Toilet 1100.2.
Screening - Rooftop equipment
Resolved
07/26/2019

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Provide screening for condensing unit DFSS/2 or relocate to behind existing screen. (or verify that existing parapet is taller than unit)
Plumb - Water distribution pipe 605.4
Resolved
07/26/2019

Unable to verify plumbing materials. Action required: Provide pipe material schedule.
Fire Plan Review Approved with Conditions 08/02/2019 07/30/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
07/26/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three engineered stamped sets of shop drawings for the Fire Alarm System.
Hazardous material identification
Corrective Action Required
07/26/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Informational Purposes)
Tenant identification
Corrective Action Required
07/26/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection) Label all rooms/spaces
Fire protection equipment identification
Corrective Action Required
07/26/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Action Required) Fire sprinkler plans have been submitted and approved for the shell. Any modifications to the system, provide three engineered stamped sets of shop drawings.
Construction documents - Fire protection systems
Resolved
07/30/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of enginnered stamped shop drawings for the fire alarm system.
Misc
Resolved
07/30/2019

Med Gas Room 5306.2.1 A 1-hour exterior room shall be a room or enclosure separated from the remainder of the building by fire barriers constructed in accordance with Section 707 of the International Building Code or horizontal assemblies constructed in accordance with Section 711 of the International Building Code, or both, with a fire-resistance rating of not less than 1 hour. Openings between the room or enclosure and interior spaces shall be self-closing smoke- and draft-control assemblies having a fire protection rating of not less than 1 hour. Rooms shall have at least one exterior wall that is provided with at least two vents. Each vent shall not be less than 36 square inches (0.023 m2) in area. One vent shall be within 6 inches (152 mm) of the floor and one shall be within 6 inches (152 mm) of the ceiling. Rooms shall be provided with at least one automatic sprinkler to provide container cooling in case of fire.
Door operations
Corrective Action Required
07/26/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Informational Purposes)
Licensed Contractors Rejected 07/17/2019 07/12/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
07/12/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 07/17/2019 07/12/2019
Joe Frogge
Misc
Corrective Action Required
07/12/2019

This project is associated with an open shell permit. Action required: Comment is for informational purposes. Occupancy shall not be granted until shell occupancy has been granted.
Project cost
Corrective Action Required
07/12/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Bldg - Fire partitions - Duct and air transfer openings 717.5.4
Corrective Action Required
07/12/2019

2018 IBC 716.5 Fire door assemblies. Fire door assemblies required by other sections of this code shall comply with the provisions of this section. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.2.5.4. Action required: Specify ratings for fire doors and equipment (sterilizers, etc) penetrations at wall type 'A'.
Accessibility - Water closet clearance width 604.3.1
Corrective Action Required
07/12/2019

ICC A117.1-2017 Section 604.3.1 Clearance Width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Provide minimum 60" clearance behind water closet at Toilet 1100.2.
Screening - Rooftop equipment
Corrective Action Required
07/12/2019

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Provide screening for condensing unit DFSS/2 or relocate to behind existing screen. (or verify that existing parapet is taller than unit)
Plumb - Water distribution pipe 605.4
Corrective Action Required
07/12/2019

Unable to verify plumbing materials. Action required: Provide pipe material schedule.
Fire Plan Review Approved with Conditions 07/17/2019 07/10/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
07/10/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three engineered stamped sets of shop drawings for the Fire Alarm System.
Hazardous material identification
Corrective Action Required
07/10/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Informational Purposes)
Tenant identification
Corrective Action Required
07/10/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Action Required) Label all rooms/spaces
Fire protection equipment identification
Corrective Action Required
07/10/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Action Required) Fire sprinkler plans have been submitted and approved for the shell. Any modifications to the system, provide three engineered stamped sets of shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
07/10/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of enginnered stamped shop drawings for the fire alarm system.
Misc
Corrective Action Required
07/10/2019

Med Gas Room 5306.2.1 A 1-hour exterior room shall be a room or enclosure separated from the remainder of the building by fire barriers constructed in accordance with Section 707 of the International Building Code or horizontal assemblies constructed in accordance with Section 711 of the International Building Code, or both, with a fire-resistance rating of not less than 1 hour. Openings between the room or enclosure and interior spaces shall be self-closing smoke- and draft-control assemblies having a fire protection rating of not less than 1 hour. Rooms shall have at least one exterior wall that is provided with at least two vents. Each vent shall not be less than 36 square inches (0.023 m2) in area. One vent shall be within 6 inches (152 mm) of the floor and one shall be within 6 inches (152 mm) of the ceiling. Rooms shall be provided with at least one automatic sprinkler to provide container cooling in case of fire.
Door operations
Corrective Action Required
07/10/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Informational Purposes)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $10,904.72 $10,904.72 Paid 09/11/2019
8331507-Sewer Connection Fee $990.00 $990.00 Paid 09/11/2019
7232302-Commercial License Tax Fee $26,452.50 $26,452.50 Paid 10/28/2019
8331506-EFHB Maybrook, Full $1,406.13 $1,406.13 Paid 09/11/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rated Assembly Inspection Partial 10/30/2019 10/30/2019 at 1:35 PM 10/30/2019
Misc
Partial Correction
10/30/2019
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -WEST WALL COLUMNS-1ST LAYER -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 1ST LAYER OK BELOW SOFFIT
Rated Assembly Inspection Partial 11/4/2019 11/4/2019 at 11:00 AM 11/04/2019
Misc
Partial Correction
11/04/2019
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 1ST LAYER OK; COLUMNS-2ND LAYER OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 1ST LAYER OK BELOW SOFFIT 1-HR WALL: -ROW 2.2 WALL ROCKED ON 1 SIDE IN RM 1171-1173-OK
Rated Assembly Inspection Partial 11/20/2019 11/20/2019
Misc
Partial Correction
11/04/2019
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 1ST LAYER OK; COLUMNS-2ND LAYER OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 1ST LAYER OK BELOW SOFFIT 1-HR WALL: -RM 1171-1174-OK SMOKE WALL: SEALING AT TOP IN PROGRESS
In-wall Inspection Partial 12/13/2019 12/13/2019 at 2:40 PM 12/13/2019
Misc
Partial Correction
12/13/2019
IN-WALL INSPECTED: -1100, 1100.1-.2, 1101-1105, 1134, 1150-1152 **INSTALL PROTECTIVE PLATE FOR PVC PLUMBING LOCATED WITHIN 1.25" OF BOTTOM PLATE
In-wall Inspection Partial 12/16/2019 at 10:55 AM 12/16/2019
Misc
Partial Correction
12/16/2019
IN-WALL OK TO COVER: -1100, 1100.1-.2, 1101-1105, 1134, 1150-1152
In-wall Inspection Partial 12/20/2019 at 1:45 PM 12/20/2019
Misc
Partial Correction
12/16/2019
IN-WALL OK TO COVER: -1100, 1100.1-.2, 1101-1105, 1134, 1150-1152 -1140-1145, 1158-1162, 1180G
Rated Assembly Inspection Partial 12/20/2019 12/20/2019
Misc
Partial Correction
11/20/2019
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 2ND LAYER BOTH SIDES OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 2ND LAYER OK BELOW SOFFIT 1-HR WALL: -RM 1171-1174-OK SMOKE WALL: SEALING AT TOP IN PROGRESS
Rated Assembly Inspection Partial 1/2/2020 01/02/2020
Misc
Partial Correction
12/20/2019
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 2ND LAYER BOTH SIDES OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 2ND LAYER OK BELOW SOFFIT 1-HR WALL: -RM 1171-1174-OK SMOKE WALL: SEALING AT TOP IN PROGRESSl Area B. Complete
Above Ceiling Inspection Partial 1/3/2020 1/3/2020 at 1:00 PM 01/03/2020
Misc
Partial Correction
02/06/2020
Area C 1153 thru 1157 above ceiling hard lids; SPACES COMPRISING "AREA A"
In-wall Inspection Partial 1/3/2020 1/3/2020 01/03/2020
Misc
Partial Correction
12/20/2019
IN-WALL OK TO COVER: -1100, 1100.1-.2, 1101-1105, 1134, 1150-1152 -1140-1145, 1158-1162, 1180G : Area C 1153 thru 1157 in wall OK to cover
Above Ceiling Inspection Partial 1/7/2020 1/7/2020 01/07/2020
Misc
Informational
01/07/2020
Area A 2 restrooms hard lids, soffit lobby/waiting room
Rated Assembly Inspection Partial 1/7/2020 1/7/2020 01/07/2020
Misc
Partial Correction
01/02/2020
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 2ND LAYER BOTH SIDES OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 2ND LAYER OK BELOW SOFFIT : 2nd layer type X hallway at north stairwell screw patten OK : Area C OR 5 north & west walls 1 hr wall 1 layer type X OK 1-HR WALL: -RM 1171-1174-OK SMOKE WALL: SEALING AT TOP IN PROGRESSl Area B. Complete
Rated Assembly Inspection Partial 1/8/2020 01/08/2020
Misc
Partial Correction
01/07/2020
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 2ND LAYER BOTH SIDES OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 2ND LAYER OK BELOW SOFFIT : 2nd layer type X hallway at north stairwell screw patten OK : Area C OR 5 north & west walls 1 hr wall 1 layer type X OK : Area B 2nd layer typeX , 1st layer type X vestibule 1170 OK 1-HR WALL: -RM 1171-1174-OK SMOKE WALL: SEALING AT TOP IN PROGRESSl Area B. Complete
In-wall Inspection Partial 1/15/2020 1/15/2020 at 2:55 PM 01/15/2020
Misc
Partial Correction
01/03/2020
IN-WALL OK TO COVER: 1100, 1100.1-.2, 1101-1106, 1134, 1150-1152, 1140-1145, 1158-1162, 1180G, 1153 thru 1157; 1110-1117, 1120-1123, 1126-1127, 1130-1133
Above Ceiling Inspection Partial 1/17/2020 1/17/2020 at 12:55 PM 01/17/2020
Misc
Partial Correction
01/17/2020
Above-ceiling approved for following areas: Area A, 2 restrooms hard lids, soffit lobby/waiting room, nurse station 1130
In-wall Inspection Partial 1/21/2020 1/21/2020 01/21/2020
Misc
Partial Correction
01/15/2020
IN-WALL OK TO COVER: 1100, 1100.1-.2, 1101-1106, 1110-1117, 1120-1127, 1130-1134, 1140-1145, 1150-1162, 1180G
Above Ceiling Inspection Partial 1/21/2020 1/21/2020 01/21/2020
Misc
Partial Correction
01/17/2020
Above-ceiling approved for following areas: Area A, 2 restrooms hard lids, soffit lobby/waiting room, nurse station 1130, restrooms 1100.1-1100.2
Above Ceiling Inspection Partial 1/29/2020 1/29/2020 at 3:05 PM 01/29/2020
Misc
Partial Correction
01/21/2020
Above-ceiling approved for following areas: Area A, all restrooms, soffit lobby/waiting room, nurse station 1130
Above Ceiling Inspection Partial 2/6/2020 2/6/2020 at 1:00 PM 02/06/2020
Misc
Partial Correction
01/29/2020
Above-ceiling approved for following areas: Area A, all restrooms, soffit lobby/waiting room, nurse station 1130; AREA "A" ACT CEILINGS COMPLETE;
Above Ceiling Inspection Partial 2/13/2020 2/13/2020 at 1:30 PM 02/13/2020
Misc
Partial Correction
02/06/2020
Above-ceiling approved for following areas: All areas ok, except sterilizer rm 1159, 1161.1, and bulk storage rm 1162
Above Ceiling Inspection Partial 2/28/2020 2/28/2020 at 2:30 PM 02/28/2020
Misc
Partial Correction
02/13/2020
Above-ceiling approved for following areas: All areas ok, except sterilizer rm 1159 above the added sink where the hole is the 1-hr wall needs to be patched **Ceiling-mounted operation light circuits must meet NEC517.13
Rated Assembly Inspection Passed 03/05/2020
Misc
Resolved
03/05/2020
2-HR FIRE BARRIER: -ELECTRICAL RM-2ND LAYER OK -SPRINKLER RM-1ST LAYER OK -COLUMN G WALL: 2ND LAYER BOTH SIDES OK -WALL LINE 7 FROM H.8 TO J.5-2ND LAYER OK WITHIN SOFFIT, 2ND LAYER OK BELOW SOFFIT : 2nd layer type X hallway at north stairwell screw patten OK : Area C OR 5 north & west walls 1 hr wall 1 layer type X OK : Area B 2nd layer typeX , 1st layer type X vestibule 1170 OK 1-HR WALL: -RM 1171-1174-OK SMOKE WALL: SEALING AT TOP IN PROGRESSl Area B. Complete
In-wall Inspection Passed 03/05/2020
Misc
Resolved
03/05/2020
IN-WALL OK TO COVER: 1100, 1100.1-.2, 1101-1106, 1110-1117, 1120-1127, 1130-1134, 1140-1145, 1150-1162, 1180G
Above Ceiling Inspection Passed 03/05/2020
Misc
Resolved
03/05/2020
Above-ceiling approved for following areas: All areas ok, except sterilizer rm 1159 above the added sink where the hole is the 1-hr wall needs to be patched **Ceiling-mounted operation light circuits must meet NEC517.13
Occupancy Inspection - Codes Commercial Failed 3/5/2020 3/5/2020 at 9:40 AM 03/05/2020
Misc
Corrective Action Required
03/05/2020
-FIRE DEPT. APPROVAL REQUIRED -ALL ABOVE-CEILING CIRCUITS SERVING OPERATION ROOMS SHALL MEET REQUIREMENT OF 517.13(A) -SCREW AND SEAL PATCHES FOR ABOVE-CEILING OPENING IN 1-HR WALL IN STERILIZER RM -INSTALL RESTROOM SIGNAGES -INSTALL KNEE PROTECTIONS UNDER SINKS IN RESTROOMS AND CORRIDORS -INSTALL HOSPITAL-GRADE RECEPTACLE NEAR SINK IN POST-OP RM **OK TO STOCK. DO NOT OCCUPY AT THIS POINT
Alarm Test Partial 3/5/2020 03/05/2020
Occupancy Inspection - Fire Partial 3/5/2020 3/5/2020 03/05/2020
Occupancy Inspection - Codes Commercial Temporary C of O 3/23/2020 3/23/2020 at 8:55 AM 03/23/2020
Misc
Corrective Action Required
03/05/2020
-FIRE DEPT. APPROVAL REQUIRED
Alarm Test Passed 3/23/2020 03/23/2020
Occupancy Inspection - Fire Passed 3/23/2020 03/23/2020
Occupancy Inspection - Codes Commercial Full C of O 4/7/2020 4/7/2020 04/07/2020
Misc
Resolved
04/07/2020
-FIRE DEPT. APPROVAL REQUIRED -COMPLETE EXHAUST TO OUTSIDE FOR MED GAS STORAGE RML NO RETURN AIR ALLOWED FROM THIS SPACE.
Documents & Images
Date Uploaded File Type Document Name
07/05/2019 Letter License Tax Bill
07/10/2019 Letter Fire Building Plan Review
07/12/2019 Letter DS P/R Corrections Document
07/30/2019 Letter Fire Building Plan Review
09/11/2019 Receipt Receipt for transaction: 2019-006157
09/11/2019 Letter DS Building Permit
10/28/2019 Receipt Receipt for transaction: 2019-007046
10/29/2019 ASA Excise Tax Application_10.29.19
10/30/2019 Letter INSPECTION SUMMARY
11/04/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter Fire (Sprinkler) Plan Review
11/20/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/15/2020 Letter INSPECTION SUMMARY
01/17/2020 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/13/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/23/2020 Letter Codes Temporary Certificate of Occupancy
03/30/2020 Email PRCOM20191770 2861 NE INDEPENDENCE
04/07/2020 Letter Codes Final Certificate of Occupancy
04/07/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home