Permit Application Status

PRCOM20191552


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191552
Building Permit - Commercial
Certificate of Occupancy
MCPROPERTIES LLC
CHANGE OF TENANT
TENANT FINISH FOR OFFICE SPACE
06/14/2019
07/11/2019
12/17/2019
08/19/2019
Locations
Contacts
MCPROPERTIES LLC, Address:221 W LEXINGTON 400  
RL PHILLIPS CONSTRUCTION INC, Address:16109 KENTUCKY RD, Phone:(816) 322-6461  
BCI MECHANICAL INC, Address:P O BOX 441, Phone:(913) 856-6747  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
MIKE COX PLUMBING INC, Address:PO BOX 650, Phone:(816) 773-0749  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 07/18/2019 07/11/2019
Joe Frogge
License Tax Application
Resolved
07/11/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
07/11/2019

ICC A117.1-2017 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" clearance at latch side of door into restroom #107.
Licensed Contractors Approved 07/11/2019 07/11/2019
Joe Frogge
Fire Plan Review Approved with Conditions 07/18/2019 07/11/2019
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
07/11/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of stamped shop drawings if any modifications are made.
Tenant identification
Corrective Action Required
07/11/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
07/11/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of stamped shop drawings for any modifications.
Installation acceptance testing
Corrective Action Required
07/11/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Action Required) Call (816)969-1300 if testing needs to be scheduled
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/11/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC extinguisher
Door operations
Corrective Action Required
07/11/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.(Informational Purposes)
Building Plan Review Rejected 06/26/2019 06/20/2019
Joe Frogge
License Tax Application
Corrective Action Required
06/20/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
06/20/2019

ICC A117.1-2017 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" clearance at latch side of door into restroom #107.
Fire Plan Review Approved with Conditions 06/26/2019 06/18/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/18/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of stamped shop drawings if any modifications are made.
Tenant identification
Corrective Action Required
06/18/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
06/18/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of stamped shop drawings for any modifications.
Installation acceptance testing
Corrective Action Required
06/18/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Action Required) Call (816)969-1300 if testing needs to be scheduled
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/18/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC extinguisher
Door operations
Corrective Action Required
06/18/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.(Informational Purposes)
Licensed Contractors Approved 06/26/2019 06/14/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $140.00 $140.00 Paid 07/11/2019
7232302-Commercial License Tax Fee $3,375.00 $3,375.00 Paid 06/14/2019
$3,375.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 7/22/2019 at 8:20 AM 07/22/2019
Above Ceiling Inspection Partial 7/22/2019 at 8:50 AM 07/22/2019
Misc
Partial Correction
07/22/2019
OK TO RE-INSTALL CEILING TILE WHEN READY EXCEPT AT [101] WHERE ELECTRICAL WORK IS NOT READY.
Above Ceiling Inspection Passed 8/9/2019 8/9/2019 at 10:50 AM 08/09/2019
Misc
Resolved
08/09/2019
OK TO RE-INSTALL CEILING TILE WHEN READY EXCEPT AT [101] WHERE ELECTRICAL WORK IS NOT READY.
Occupancy Inspection - Codes Commercial Failed 8/15/2019 8/9/2019 at 11:10 AM 08/09/2019
Misc
Corrective Action Required
08/09/2019
TEMPORARY PLEXIGLASS AT ENTRY DOOR TO BE REPLACED WITH TEMPERED GLAZING
Misc
Corrective Action Required
08/09/2019
CHECK ALL ELECTRICAL RECEPTACLES TO ENSURE ALL ARE MOUNTED SOLID TO BOX -- NONE "SOFT" OR LOOSE SIDE-TO-SIDE. USE YOKE SPACERS OR BOX EXTENDERS WHERE NEEDED.
Misc
Corrective Action Required
08/09/2019
OBTAIN FIRE DEPT APPROVAL
Occupancy Inspection - Fire Passed 8/15/2019 08/15/2019
Occupancy Inspection - Codes Commercial Full C of O 8/15/2019 8/16/2019 08/19/2019
Misc
Resolved
08/15/2019
TEMPORARY PLEXIGLASS AT ENTRY DOOR TO BE REPLACED WITH TEMPERED GLAZING
Misc
Resolved
08/15/2019
CHECK ALL ELECTRICAL RECEPTACLES TO ENSURE ALL ARE MOUNTED SOLID TO BOX -- NONE "SOFT" OR LOOSE SIDE-TO-SIDE. USE YOKE SPACERS OR BOX EXTENDERS WHERE NEEDED.
Misc
Resolved
08/15/2019
OBTAIN FIRE DEPT APPROVAL
Documents & Images
Date Uploaded File Type Document Name
06/14/2019 Letter License Tax Bill
06/18/2019 Letter Fire Building Plan Review
06/20/2019 Letter DS P/R Corrections Document
07/11/2019 Letter Codes Plan Review Conditions
07/11/2019 Receipt Receipt for transaction: 2019-004700
07/11/2019 Letter DS Building Permit
07/22/2019 Letter INSPECTION SUMMARY
07/22/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter Field Certificate of Occupancy
08/26/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home