Summary
PRCOM20190276
Building Permit - Commercial
Final Completion
LSMOB OWNER LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB PLUMBING FOR NEW BUILDING FOR OUTPATIENT SURGICAL, SPORTS TRAINING, AND SPORTS REHAB RE:PRCOM20190274 FOR FULL PERMIT
02/08/2019
03/14/2019
08/11/2019
01/29/2020
Locations
Contacts
EXCEL CONSTRUCTORS, INC, Address:8041 W 47TH ST, Phone:(913) 261-1000  
VAUGHAN MECHANICAL INC, Address:4220 NE 34TH , Phone:(816) 453-3400  
LSMOB OWNER LLC, Address:11715 ADMINISTRATION DR STE 200  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 03/14/2019 03/13/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
03/13/2019

This review is for the foundation and underslab plumbing portion of a future project. Complete set of documents have not been reviewed and will not be commented on until after receipt of hvac and electrical designs. Action required: Comment is for informational purposes only.
Special Inspections Review Approved 03/13/2019
Joe Frogge
Licensed Contractors Approved 03/14/2019 03/13/2019
Joe Frogge
Fire Plan Review Rejected 02/12/2019
Joe Dir
Misc
Corrective Action Required
03/12/2019

Not able to complete review ACTION REQUIRED: Submit a complete set of plans for review.
Building Plan Review Rejected 02/21/2019 02/11/2019
Joe Frogge
Miscellaneous Correction
Resolved
03/13/2019

This review is for the foundation and underslab plumbing portion of a future project. Complete set of documents have not been reviewed and will not be commented on until after receipt of hvac and electrical designs. Action required: Comment is for informational purposes only.
Code analysis required
Resolved
03/13/2019

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Square footage information in question. 1st and 2nd levels have very similar areas but that doesn't seem consistent with parts of upper floor plan that are open to below. Clarify.
Bldg - Premises identification/address 501.2
Resolved
03/13/2019

Project cost
Resolved
03/13/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide project cost for foundation and under slab plumbing.
Miscellaneous Correction
Resolved
03/13/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Licensed Contractors Approved 02/08/2019 02/08/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,078.84 $1,078.84 Paid 03/14/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 4/24/2019 4/24/2019 at 3:30 PM 04/24/2019
Misc
Corrective Action Required
04/24/2019
-4" AND 6" SANITARY BUILDING DRAIN AND COLUMN STUB-OUTS-OK
Underslab Plumbing Inspection - Commercial Partial 4/26/2019 4/26/2019 at 1:40 PM 04/26/2019
Misc
Corrective Action Required
04/24/2019
-4" AND 6" SANITARY BUILDING DRAIN AND COLUMN STUB-OUTS-OK -STORM DRAIN-OK
Underslab Plumbing Inspection - Commercial Partial 5/10/2019 5/10/2019 at 2:10 PM 05/10/2019
Misc
Corrective Action Required
04/26/2019
UNDERSLAB PLUMBING OK: -4" AND 6" SANITARY BUILDING DRAIN AND COLUMN STUB-OUTS; RESTROOM; STORM DRAIN
Underslab Plumbing Inspection - Commercial Partial 5/15/2019 5/15/2019 at 2:50 PM 05/15/2019
Misc
Corrective Action Required
05/10/2019
UNDERSLAB PLUMBING OK: -4" AND 6" SANITARY BUILDING DRAIN AND COLUMN STUB-OUTS; RESTROOM; STORM DRAIN; MOP SINKS AND SERVICE RM
Underslab Electrical Inspection - Commercial Failed 5/23/2019 5/23/2019 at 10:10 AM 05/23/2019
Misc
Corrective Action Required
05/23/2019
NOT READY
Underslab Electrical Inspection - Commercial Partial 5/24/2019 5/24/2019 at 10:25 AM 05/24/2019
Misc
Corrective Action Required
05/23/2019
UNDERSLAB ELECTRICAL OK; HOWEVER THE GROUNDING CONNECTION TO UFER REBAR IS NON-COMPLIANT. FOOTING CONCRETE MUST BE REMOVED TO GET TO THE EMBEDDED FOOTING REBAR FOR GROUNDING. WILL CHECK LATER
Underground Electrical Inspection - Commercial Partial 6/13/2019 6/13/2019 at 1:55 PM 06/13/2019
Misc
Partial Correction
06/13/2019
LIGHT POLE PIERS ONLY: 11 LP PIERS OK. THE ONE AT SW CORNER NOT READY
Underground Electrical Inspection - Commercial Partial 6/28/2019 6/28/2019 at 1:15 PM 06/28/2019
Misc
Partial Correction
06/13/2019
LIGHT POLE PIERS ONLY: 11 LP PIERS OK. THE ONE AT SW CORNER NOT READY 6/28/19: POLE BASE AT SE CORNER HAS BEEN POURED WITHOUT INSPECTION
Misc
Partial Correction
06/28/2019
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT: ALL EXCEPT NORTHEAST CORNER
Miscellaneous Inspection Partial 7/24/2019 7/24/2019 at 9:20 AM 07/24/2019
Informational
07/23/2019
-OBSERVED 2ND FLOOR REINFORCEMENT PRIOR TO POUR. NOT FULLY COMPLETED AT THIS TIME. GUYS STILL LAYING REINFORCEMENT MATS. OK TO POUR UPON APPROVAL FROM SPECIAL INSPECTION
Corrective Action Required
07/24/2019
Underground Electrical Inspection - Commercial Partial 9/11/2019 9/11/2019 at 10:45 AM 09/11/2019
Misc
Resolved
09/11/2019
LIGHT POLE PIERS ONLY: LP PIERS OK.
Misc
Partial Correction
06/28/2019
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT: CONDUITS TO ALL LP PIERS OK; CONDUITS FOR GENERATOR, TRANSFORMER PRIMARY AND SECONDARY CONDUITS
Underslab Plumbing Inspection - Commercial Partial 9/11/2019 9/11/2019 09/11/2019
Misc
Corrective Action Required
05/15/2019
UNDERSLAB PLUMBING OK: -UNDERSLAB PLUMBING OK FROM LINE 1-5
Underground Electrical Inspection - Commercial Partial 9/12/2019 9/12/2019 at 1:45 PM 09/12/2019
Misc
Partial Correction
09/11/2019
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT: PIERS AND CONDUITS TO ALL LP PIERS OK; CONDUITS FOR GENERATOR, TRANSFORMER PRIMARY AND SECONDARY CONDUITS **GROUNDING OF LP LIGHTS NOT DONE YET.
Underslab Plumbing Inspection - Commercial Passed 9/13/2019 9/13/2019 at 1:50 PM 09/13/2019
Misc
Resolved
09/13/2019
UNDERSLAB PLUMBING OK: -UNDERSLAB PLUMBING OK FROM LINE 1-5
Rough Plumbing Inspection - Commercial Partial 9/17/2019 at 1:35 PM 09/17/2019
Misc
Partial Correction
09/17/2019
ROOF DRAIN TESTED OK: -WEST 6" DRAINS, SE 8" PRIMARY
Rough Plumbing Inspection - Commercial Partial 9/18/2019 at 12:45 PM 09/18/2019
Misc
Partial Correction
09/17/2019
ROOF DRAIN TESTED OK: -WEST 6" DRAINS, SE 8" PRIMARY&OVERFLOW, NE 8" OVERFLOW, SOUTH 4"&6" PRIMARY&OVERFLOW
Rough Plumbing Inspection - Commercial Partial 9/20/2019 at 2:25 PM 09/20/2019
Misc
Partial Correction
09/18/2019
-ROOF DRAIN-TESTED OK
Rough Plumbing Inspection - Commercial Partial 9/26/2019 at 1:30 PM 09/26/2019
Misc
Partial Correction
09/20/2019
ROUGH-PLUMBING OK: -ROOF DRAIN -ROUGH PLUMBING FOR RESTROOMS AT SW CORNER ON BOTH FLOORS -4" WASTE AND VENT STACKS
Miscellaneous Inspection Passed 8/29/2019 8/29/2019 01/06/2020
Underslab Electrical Inspection - Commercial Passed 01/22/2020
Misc
Resolved
01/22/2020
UNDERSLAB ELECTRICAL OK; HOWEVER THE GROUNDING CONNECTION TO UFER REBAR IS NON-COMPLIANT. FOOTING CONCRETE MUST BE REMOVED TO GET TO THE EMBEDDED FOOTING REBAR FOR GROUNDING. WILL CHECK LATER
Rough Plumbing Inspection - Commercial Passed 01/22/2020
Misc
Resolved
01/22/2020
ROUGH-PLUMBING OK: -ROOF DRAIN -ROUGH PLUMBING FOR RESTROOMS AT SW CORNER ON BOTH FLOORS -4" WASTE AND VENT STACKS
Underground Electrical Inspection - Commercial Passed 01/29/2020
Misc
Informational
01/22/2020
**GROUNDING OF LP LIGHTS NOT DONE YET.
Final Inspection - Commercial Passed 01/29/2020
Informational
01/29/2020
FOUNDATION INSPECTED AND APPROVED BY 3RD PARTY SPECIAL INSEPCTION. ENGINEER APPROVAL FORM FILED UNDER FULL SHELL BUILDING PERMIT
Documents & Images
Date Uploaded File Type Document Name
02/11/2019 Letter Codes P/R Corrections Document
03/13/2019 Letter DS P/R Corrections Document
03/14/2019 Receipt Receipt for transaction: 2019-000861
03/14/2019 Letter Codes Building Permit
04/24/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/15/2019 Letter INSPECTION SUMMARY
05/23/2019 Letter INSPECTION SUMMARY
05/24/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
07/23/2019 Letter INSPECTION SUMMARY
07/24/2019 Letter INSPECTION SUMMARY
09/11/2019 Letter INSPECTION SUMMARY
09/11/2019 Letter INSPECTION SUMMARY
09/12/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/17/2019 Letter INSPECTION SUMMARY
09/18/2019 Letter INSPECTION SUMMARY
09/20/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.