Permit Application Status

PRCOM20173395


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20173395
Building Permit - Commercial
Certificate of Occupancy
ROCKY TOP HOLDINGS LLC
CHANGE OF TENANT
TENANT FINISH FOR JUVENILE PHYSICAL THERAPY
10/11/2017
10/25/2017
04/14/2018
02/23/2018
Locations
Contacts
PHOENIX CONSTRUCTION INC, Address:1305 HOLLY CT, Phone:(816) 716-8208  
4SIGHT GROUP LLC, Address:7920 WARD PKWY, Phone:(816) 802-8400  
DAN STAGGS ELECTRIC, Address:P O BOX 1410, Phone:(816) 898-2947  
MAYES PLUMBING INC, Address:501 S MCCLEARY RD STE A, Phone:(816) 792-5400  
SCHARHAG ARCHITECTS, Address:310 ARMOR RD, #22, Phone:(816) 221-9297  
ROCKY TOP HOLDINGS LLC, Address:244 W MILL ST STE 101  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
BD ELECTRIC, Address:5919 S BUCKNER TARSNEY RD, Phone:(816) 305-2055  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/23/2017 10/25/2017
Development Center
LC - General Contractor
Resolved
10/25/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
10/25/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/30/2017 10/24/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
10/23/2017

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for any modification to be done to the fire alarm system. Contact the fire department to schedule testing.(816)969-1300
Construction documents - Fire protection systems
Corrective Action Required
10/23/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler contractor provide shop drawings for any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
10/23/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) If any of the fire alarm system devices are disconnected, relocated,or newly installed an acceptance test will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300,
Misc
Resolved
10/24/2017

Door operation ACTION REQUIRED: No keyed locks on the egress side of an exitl. [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Building Plan Review Approved with Conditions 10/30/2017 10/23/2017
Joe Frogge
License Tax Application
Corrective Action Required
10/23/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/23/17 - acknowledged in letter
Suite address
Resolved
10/23/2017

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Update address references to show correct suite number which is 134.
Misc
Resolved
10/23/2017

2012 IBC 2902.3.1 Access. The route to the public toilet facilities required by Section 2902.3 shall not pass through kitchens, storage rooms or closets. Access to the required facilities shall be from within the building or from the exterior of the building. All routes shall comply with the accessibility requirements of this code. The public shall have access to the required toilet facilities at all times that the building is occupied. Action required: Modify design to comply.
Plumb - Minimum number of fixtures 403.1
Resolved
10/23/2017

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide drinking fountain or approved alternate. 10/23/17 - per letter from tenant, bottled water to be provided.
Fire Plan Review Approved with Conditions 10/23/2017 10/16/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
10/16/2017

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for any modification to be done to the fire alarm system. Contact the fire department to schedule testing.(816)969-1300
Construction documents - Fire protection systems
Corrective Action Required
10/16/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler contractor provide shop drawings for any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
10/16/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) If any of the fire alarm system devices are disconnected, relocated,or newly installed an acceptance test will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300,
Misc
Corrective Action Required
10/16/2017

Door operation ACTION REQUIRED: No keyed locks on the egress side of an exitl. [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Building Plan Review Rejected 10/23/2017 10/13/2017
Joe Frogge
License Tax Application
Corrective Action Required
10/13/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Suite address
Corrective Action Required
10/13/2017

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Update address references to show correct suite number which is 134.
Misc
Corrective Action Required
10/13/2017

2012 IBC 2902.3.1 Access. The route to the public toilet facilities required by Section 2902.3 shall not pass through kitchens, storage rooms or closets. Access to the required facilities shall be from within the building or from the exterior of the building. All routes shall comply with the accessibility requirements of this code. The public shall have access to the required toilet facilities at all times that the building is occupied. Action required: Modify design to comply.
Plumb - Minimum number of fixtures 403.1
Corrective Action Required
10/13/2017

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide drinking fountain or approved alternate.
Licensed Contractors Rejected 10/11/2017 10/13/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
10/13/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
10/13/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $87.83 $87.83 Paid 10/25/2017
8331506-EFHB Maybrook, Full $85.22 $85.22 Paid 10/25/2017
8331507-Sewer Connection Fee $60.00 $60.00 Paid 10/25/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Failed 11/8/2017 at 11:10 AM 11/08/2017
Misc
Corrective Action Required
11/08/2017
A LOW-HEEL INLET SHALL NOT BE USED AS WET-VENTED CONNECTION. FYI: YOU CAN USE A SIDE-HEEL INLET FITTING. REF IPC 706.4
Underslab Plumbing Inspection - Commercial Passed 11/10/2017 11/10/2017 at 9:25 AM 11/10/2017
Misc
Resolved
11/10/2017
A LOW-HEEL INLET SHALL NOT BE USED AS WET-VENTED CONNECTION. FYI: YOU CAN USE A SIDE-HEEL INLET FITTING. REF IPC 706.4
Electrical Service Inspection Passed 11/27/2017 11/27/2017 at 9:45 AM 11/27/2017
In-wall Inspection Partial 12/7/2017 12/7/2017 at 9:35 AM 12/07/2017
Misc
Corrective Action Required
12/07/2017
IN RESTROOMS-PROTECT THE PLUMBING AND ADD BLOCKINGS FOR GRAB BARS
In-wall Inspection Passed 01/25/2018
Misc
Resolved
01/25/2018
IN RESTROOMS-PROTECT THE PLUMBING AND ADD BLOCKINGS FOR GRAB BARS
Occupancy Inspection - Codes Commercial Failed 1/25/2018 1/25/2018 at 9:05 AM 01/25/2018
Misc
Corrective Action Required
01/25/2018
-FIRE DEPT. APPROVAL REQUIRED -FRONT UL SIGNAGE NOT INSTALLED -INSTALL NO SMOKING SIGNAGE AT FRONT -INSTALL RESTROOM SIGNAGE -ABOVE-CEILING MC CABLES CANNOT BE SECURED TO THE CEILING GRID SUPPORT WIRE. INSTALL AN INDEPENDANT SUPPORT WIRE WITH COLOR-ID.
Occupancy Inspection - Codes Commercial Temporary C of O 1/30/2018 1/30/2018 at 3:10 PM 01/30/2018
Misc
Corrective Action Required
01/25/2018
-FRONT UL SIGNAGE NOT INSTALLED
Occupancy Inspection - Fire Passed 1/30/2018 01/30/2018
Occupancy Inspection - Codes Commercial Failed 2/16/2018 at 2:55 PM 02/16/2018
Misc
Corrective Action Required
01/30/2018
TERMINATE UNUSED SIGN CIRCUIT INSIDE A BOX. CAULK&SEAL
Occupancy Inspection - Codes Commercial Full C of O 02/23/2018
Misc
Resolved
02/23/2018
TERMINATE UNUSED SIGN CIRCUIT INSIDE A BOX. CAULK&SEAL
Documents & Images
Date Uploaded File Type Document Name
10/13/2017 address verif
10/16/2017 Letter Final Plan Review Conditions
10/16/2017 Letter Codes P/R Corrections Document
10/24/2017 Letter Fire Building Plan Review
10/25/2017 Receipt Receipt for transaction: 2017-006970
10/25/2017 Letter Codes Plan Review Conditions
10/25/2017 Letter Codes Building Permit
11/08/2017 Letter Inspection Summary
11/10/2017 Letter Inspection Summary
11/27/2017 Letter Inspection Summary
12/07/2017 Letter Inspection Summary
01/25/2018 Letter Inspection Summary
01/30/2018 Letter Codes Temporary Certificate of Occupancy
02/16/2018 Letter Inspection Summary
02/23/2018 Letter Field Certificate of Occupancy
02/27/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home