Permit Application Status

PRCOM20172778


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20172778
Building Permit - Commercial
Final Completion
GIDDY UP LLC
ALTERATION COMMERCIAL
PARKING LOT LIGHTING
08/15/2017
09/05/2017
12/04/2017
Locations
Contacts
ELECTRICAL ASSOCIATES LLC, Address:308 W ELM ST, Phone:(913) 825-2537  
GIDDY UP LLC, Address:2151 NE INDEPENDENCE AVE  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 08/29/2017 08/23/2017
Joe Frogge
Building Plan Review Approved 08/29/2017 08/23/2017
Joe Frogge
Licensed Contractors Approved 08/15/2017 08/23/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $201.70 $201.70 Paid 09/05/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 9/7/2017 9/7/2017 09/07/2017
Misc
Partial Correction
09/07/2017
UNDERGROUND RACEWAYS TO LIGHT POLES-OK
Underground Electrical Inspection - Commercial Partial 9/8/2017 9/8/2017 09/08/2017
Misc
Partial Correction
09/07/2017
UNDERGROUND RACEWAYS TO LIGHT POLES-OK ALL PIERS OK TO POUR EXCEPT THE SHORT PIER AT EAST SIDE OF PARKING LOT AND THE SW LP PIER THAT NEEDS A GROUND ROD
Underground Electrical Inspection - Commercial Partial 9/8/2017 9/8/2017 09/08/2017
Misc
Partial Correction
09/08/2017
UNDERGROUND RACEWAYS TO LIGHT POLES-OK LP PIERS-OK
Underground Electrical Inspection - Commercial Passed 10/03/2017
Misc
Resolved
10/03/2017
UNDERGROUND RACEWAYS TO LIGHT POLES-OK LP PIERS-OK
Final Electrical Inspection - Commercial Failed 10/3/2017 10/3/2017 at 10:00 AM 10/03/2017
Misc
Corrective Action Required
10/03/2017
-APPROVAL REQUIRED FROM: DEV. ENGINEERING, PLANNING -COMPLETE ELECTRICAL FOR LIGHT POLES -POWER PANEL: SHALL GROUND PANEL PER CODE; INSTALL BUSHING AT PANEL ENTRANCE FOR CONDUCTORS > #4; COMPLETE THE REST OF THE ELECTRICAL INSTALLATION
Final Inspection - Commercial Partial 10/9/2017 10/9/2017 at 2:25 PM 10/09/2017
Misc
Corrective Action Required
10/03/2017
-APPROVAL REQUIRED FROM: DEV. ENGINEERING, PLANNING **INSTALL SOD OR SEEDINGS FOR DISTURBED AREA
Occupancy Inspection - Planning Passed 12/01/2017
Final Inspection - Commercial Passed 12/4/2017 at 9:40 AM 12/04/2017
Misc
Resolved
12/04/2017
-APPROVAL REQUIRED FROM: PLANNING **INSTALL SOD OR SEEDINGS FOR DISTURBED AREA
Documents & Images
Date Uploaded File Type Document Name
08/23/2017 JCC 8.03.17 Instant Auto Parking Lot Addition Approved
09/05/2017 Receipt Receipt for transaction: 2017-006186
09/05/2017 Letter Codes Plan Review Conditions
09/05/2017 Letter Codes Building Permit
09/07/2017 Letter Inspection Summary
09/08/2017 Letter Inspection Summary
09/08/2017 Letter Inspection Summary
10/03/2017 Letter Inspection Summary
10/09/2017 Letter Inspection Summary
12/04/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home