Permit Application Status

PRCOM20172692


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20172692
Building Permit - Commercial
Certificate of Occupancy
CP DEER BROOK PLAZA LLC
CHANGE OF TENANT
TENANT FINISH FOR MASSAGE AND FACIAL BUSINESS **Drawing is in plan review file
08/04/2017
09/01/2017
02/04/2018
10/20/2017
Locations
Contacts
MONUMENT EXTERIOR DESIGNS INC, Address:3808 N 99TH ST, Phone:(816) 914-3917  
G.J. ELECTRIC, Address:1511 DOC HENRY RD, Phone:(816) 537-3094  
CORNERSTONE ARCHITECT LLC, Address:8117 ROBERTS RD, Phone:(816) 838-3472  
CP DEER BROOK PLAZA LLC, Address:3400 COLLEGE BLVD STE 195  
KMZC PLUMBING, Address:301 W WEA, Phone:(913) 238-2583  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/18/2017 09/01/2017
Development Center
LC - General Contractor
Resolved
09/01/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
09/01/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 08/25/2017 08/23/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
08/18/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) have the fire alarm system contractor provide shop drawings of any modifications to be done to the fire alarm system.
Address numbers required
Corrective Action Required
08/18/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Post the address on the exterior of the front and rear doors. Address shall be readable from the roadway.
Construction documents - Fire protection systems
Corrective Action Required
08/18/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modfications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
08/18/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Acceptance testing shall be required for fire alarm system modifications prior to the final occupancy inspection. Contact the fire department for testing 816-969-1300.
Portable fire extinguishers - general
Corrective Action Required
08/18/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher. Fire extinguisher to be mounted close to an exit.
Misc
Corrective Action Required
08/18/2017

Door operation ACTION REQUIRED: No keyed locks on the egress side of an exit. [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Building Plan Review Approved with Conditions 08/25/2017 08/21/2017
Joe Frogge
License Tax Application
Corrective Action Required
08/18/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Code analysis required
Resolved
08/21/2017

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Modify code analysis to reflect correct building type with is VB.
Fire Plan Review Approved with Conditions 08/16/2017 08/08/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
08/08/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) have the fire alarm system contractor provide shop drawings of any modifications to be done to the fire alarm system.
Address numbers required
Corrective Action Required
08/08/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Post the address on the exterior of the front and rear doors. Address shall be readable from the roadway.
Construction documents - Fire protection systems
Corrective Action Required
08/08/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modfications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
08/08/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Acceptance testing shall be required for fire alarm system modifications prior to the final occupancy inspection. Contact the fire department for testing 816-969-1300.
Portable fire extinguishers - general
Corrective Action Required
08/08/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher. Fire extinguisher to be mounted close to an exit.
Misc
Corrective Action Required
08/08/2017

Door operation ACTION REQUIRED: No keyed locks on the egress side of an exit. [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Building Plan Review Rejected 08/16/2017 08/07/2017
Joe Frogge
License Tax Application
Corrective Action Required
08/07/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Code analysis required
Corrective Action Required
08/07/2017

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Modify code analysis to reflect correct building type with is VB.
Misc
Resolved
08/17/2017

Lee's Summit Code of Ordinances Section 28-63 - Massage facility business license requirements (C) (3) No massage facility business license shall be approved by the Director of Finance unless the facility complies with each of these minimum requirements: a. - The walls shall be clean and painted with washable, mold-resistant paint in all rooms where massage is provided. Floors shall be free from any accumulation of dust, dirt or refuse. All equipment used in the business operation shall be maintained in a clean and sanitary condition. Towels, linens and items for personal use of massage therapists, employees and patrons shall be in sufficient quantity so that none is used for more than one (1) person. Heavy, white paper may be substituted for sheets if such paper is changed for each patron. No cubicle, room, booth or any area within the facility where service is to be provided patrons shall be fitted with a door capable of being locked. b. - Toilet facilities shall be provided in convenient locations. When the facility is designed to accommodate any combination of five (5) or more massage therapists, employees and patrons of different sexes on the premises at the same time, separate toilet facilities shall be provided. A single water closet per sex shall be provided for any combination of twenty (20) or more massage therapists, employees or patrons that the establishment is designed to accommodate on the premises at any one time. Urinals may be substituted for water closets after one (1) water closet has been provided. Toilets shall be designated as to the sex accommodated therein. c. - Lavatories or wash basins provided with both hot and cold running water shall be installed in either the toilet room or vestibule. Lavatories or wash basins shall be provided with soap in a dispenser and with sanitary towels. Action required: Modify documents to demonstrate compliance. Additional (accessible) restroom is required. 8/17/17- approved via cmr
Licensed Contractors Rejected 08/04/2017 08/07/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
08/07/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/07/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $49.02 $49.02 Paid 09/01/2017
8331507-Sewer Connection Fee $30.00 $30.00 Paid 09/01/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 9/12/2017 09/12/2017
Misc
Corrective Action Required
09/12/2017
CORRECTION REQUIRED: COMPLETE REMOVAL OF ELECTRICAL RACEWAY IN RESTROOM AND INSTALL FRAME HEADER **NOTE: INSTALL FIRE SPRINKLER FOR EACH SPACE; REMOVE DEAD BOLT LOCK REAR EXIT DOOR; WILL NEED AN ABOVE CEILING INSPECTION. HAVE LADDER AVAILABLE
In-wall Inspection Passed 9/15/2017 9/15/2017 09/15/2017
Misc
Resolved
09/15/2017
CORRECTION REQUIRED: COMPLETE REMOVAL OF ELECTRICAL RACEWAY IN RESTROOM AND INSTALL FRAME HEADER **NOTE: INSTALL FIRE SPRINKLER FOR EACH SPACE; REMOVE DEAD BOLT LOCK REAR EXIT DOOR; WILL NEED AN ABOVE CEILING INSPECTION. HAVE LADDER AVAILABLE
Above Ceiling Inspection Failed 10/10/2017 10/10/2017 at 10:45 AM 10/10/2017
Misc
Corrective Action Required
10/10/2017
-PATCH HOLES IN TENANT SEPARATION WALL -SUPPORT ELECTRICAL BOX
Occupancy Inspection - Codes Commercial Temporary C of O 10/17/2017 10/17/2017 at 8:55 AM 10/17/2017
Misc
Corrective Action Required
10/17/2017
-OBTAIN FIRE DEPT APPROVAL -INSTALL GFCI RECEPTACLE WITHIN SIX FT OF THE SINK -INSTALL DAMPER FOR DRYER EXHAUST TERMINAL
Above Ceiling Inspection Passed 10/17/2017
Misc
Resolved
10/17/2017
-PATCH HOLES IN TENANT SEPARATION WALL -SUPPORT ELECTRICAL BOX
Occupancy Inspection - Fire Temporary C of O 10/17/2017 10/17/2017
Occupancy Inspection - Codes Commercial Full C of O 10/20/2017 10/20/2017 at 10:50 AM 10/20/2017
Misc
Resolved
10/20/2017
-OBTAIN FIRE DEPT APPROVAL -INSTALL GFCI RECEPTACLE WITHIN SIX FT OF THE SINK -INSTALL DAMPER FOR DRYER EXHAUST TERMINAL
Occupancy Inspection - Fire Passed 10/20/2017 10/20/2017
Documents & Images
Date Uploaded File Type Document Name
08/08/2017 Letter Fire Building Plan Review
08/08/2017 Letter Codes P/R Corrections Document
08/17/2017 CMR
08/23/2017 Letter Fire Building Plan Review
09/01/2017 Receipt Receipt for transaction: 2017-006169
09/01/2017 Letter Codes Building Permit
09/12/2017 Letter Inspection Summary
09/15/2017 Letter Inspection Summary
10/10/2017 Letter Inspection Summary
10/17/2017 Letter Codes Temporary Certificate of Occupancy
10/20/2017 Letter Field Certificate of Occupancy
10/23/2017 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home