Summary
PRCOM20172517
Building Permit - Commercial
Certificate of Occupancy
PARROT PROPERTIES INC
NEW MULTI-FAMILY
BUILDING #8 NEW 2 STORY APARTMENT BUILDING WITH PARKING GARAGE BENEATH FOUNDATION PERMIT - PRCOM20181903
07/24/2017
01/07/2019
10/30/2020
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 08/07/2017 01/07/2019
Joe Frogge
Licensed Contractors Approved 07/25/2018 06/19/2018
Joe Frogge
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Building Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Special Inspections Review Approved 08/24/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $6,468.03 $6,468.03 Paid 01/07/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 01/07/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 12/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 3/22/2019 03/22/2019
Misc
Corrective Action Required
03/22/2019
lower center footing west wall
Foundation Inspection - Commercial Passed 3/26/2019 03/26/2019
Footing Inspection - Commercial Partial 3/27/2019 (3:00) 3/28/2019 03/28/2019
Misc
Corrective Action Required
03/28/2019
lower east footing , except center portion for access.
Underslab Plumbing Inspection - Commercial Partial 4/17/2019 4/17/2019 04/17/2019
Misc
Corrective Action Required
04/17/2019
lower level
Sewer Service Inspection Passed 4/26/2019 4/26/2019 04/26/2019
Misc
Informational
04/26/2019
INSPECTION PASSED PHOTOS ATTACHED
Footing Inspection - Commercial Passed 6/13/2019 (2:00) 6/13/2019 06/13/2019
Misc
Corrective Action Required
03/28/2019
lower east footing , except center portion for access.
All Rough Inspection - Commercial Partial 11/13/2019 11/13/2019 11/13/2019
SECOND FLOOR
Corrective Action Required
11/13/2019
--SEAL ALL PRE ROCK AREAS FROM ATTIC. --INSTALL HURRICANE TIES AND TRUSS HANGERS. --PUDDY PADS NEED TO BE CORRECTED. --JOIST HANGER CEILING JOIST IN CORRIDOR --REMOVE BONDING SCREWS FROM NEUTRAL SIDE OF PANELS.
FIRST FLOOR
Corrective Action Required
11/13/2019
LOWER LEVEL
Corrective Action Required
11/13/2019
All Rough Inspection - Commercial Failed 11/14/2019 11/14/2019
SECOND FLOOR
Corrective Action Required
11/13/2019
--SEAL ALL PRE ROCK AREAS FROM ATTIC. --INSTALL HURRICANE TIES AND TRUSS HANGERS. --PUDDY PADS NEED TO BE CORRECTED. --JOIST HANGER CEILING JOIST IN CORRIDOR --REMOVE BONDING SCREWS FROM NEUTRAL SIDE OF PANELS.
FIRST FLOOR
Corrective Action Required
11/13/2019
--seal pre-rock locations in shower areas from ceiling. --north east unit nail off corner stud at pre-rock and seal at ceiling. --draft stop all corridor penetrations at 1000sq ft. --instal joist hanges on truss joist at south stair area in corridor. ----laundry drain needs 4" between trap and drain south east unit
LOWER LEVEL
Corrective Action Required
11/13/2019
--over bored studs in corridor wall for laundry drain. --laundry drain needs 4" between trap and drain -- install protection plates where required for electrcial. -- north units install nail plates for electrical. --nail stud at sub panel and install protection plates at top plate. --electrical room incomplete no panel set at this inspection.
All Rough Inspection - Commercial Passed 11/19/2019 11/19/2019 11/19/2019
SECOND FLOOR
Resolved
11/19/2019
--SEAL ALL PRE ROCK AREAS FROM ATTIC. --INSTALL HURRICANE TIES AND TRUSS HANGERS. --PUDDY PADS NEED TO BE CORRECTED. --JOIST HANGER CEILING JOIST IN CORRIDOR --REMOVE BONDING SCREWS FROM NEUTRAL SIDE OF PANELS.
FIRST FLOOR
Resolved
11/19/2019
--seal pre-rock locations in shower areas from ceiling. --north east unit nail off corner stud at pre-rock and seal at ceiling. --draft stop all corridor penetrations at 1000sq ft. --instal joist hanges on truss joist at south stair area in corridor. ----laundry drain needs 4" between trap and drain south east unit
LOWER LEVEL
Resolved
11/19/2019
--over bored studs in corridor wall for laundry drain. --laundry drain needs 4" between trap and drain -- install protection plates where required for electrcial. -- north units install nail plates for electrical. --nail stud at sub panel and install protection plates at top plate. --electrical room incomplete no panel set at this inspection.
Rated Assembly Inspection Partial 11/19/2019 12/04/2019
LOWER LEVEL
Corrective Action Required
11/19/2019
PRE-ROCK OK RC-ok
FIRST FLOOR
Corrective Action Required
11/19/2019
PRE-ROCK OK RC-ok
SECOND FLOOR
Corrective Action Required
11/19/2019
PRE-ROCK 301,302,303 NEEDS ADDRESSED FOR HOLE AND GAPS still open gaps fee required. RC- ok
Rated Assembly Inspection Not Ready 12/4/2019 12/04/2019
LOWER LEVEL
Corrective Action Required
12/04/2019
PRE-ROCK OK RC-ok
FIRST FLOOR
Corrective Action Required
12/04/2019
PRE-ROCK OK RC-ok
SECOND FLOOR
Corrective Action Required
12/04/2019
PRE-ROCK 301,302,303 NEEDS ADDRESSED FOR HOLE AND GAPS still open gaps fee required. RC- ok
Rated Assembly Inspection Partial 12/5/2019 12/5/2019 12/05/2019
LOWER LEVEL
Corrective Action Required
12/04/2019
PRE-ROCK OK RC-ok
FIRST FLOOR
Corrective Action Required
12/04/2019
PRE-ROCK OK RC-ok
SECOND FLOOR
Corrective Action Required
12/04/2019
PRE-ROCK RC- ok
Rated Assembly Inspection Partial 12/31/2019 12/31/2019 12/31/2019
LOWER LEVEL
Corrective Action Required
12/05/2019
PRE-ROCK OK RC-ok Fail unit 106 laundry Fail unit 108 ceiling wall at meter bank
FIRST FLOOR
Corrective Action Required
12/05/2019
PRE-ROCK OK RC-ok Fail unit 202 replace type X on ceiling with type C
SECOND FLOOR
Corrective Action Required
12/05/2019
PRE-ROCK RC- ok 1 layer 5/8 type X walls type C ceiling -ok
Rated Assembly Inspection Partial 1/6/2020 1/6/2020 01/06/2020
LOWER LEVEL
Corrective Action Required
12/31/2019
PRE-ROCK OK RC-ok Units 102,104,106 - OK Fail unit 108 ceiling wall at meter bank
FIRST FLOOR
Resolved
01/06/2020
PRE-ROCK OK RC-ok Ceiling & walls of units OK
SECOND FLOOR
Resolved
01/06/2020
PRE-ROCK RC- ok 1 layer 5/8 type X walls type C ceiling -OK
Electrical Service Inspection Passed 1/6/2020 1/6/2020 01/06/2020
Rated Assembly Inspection Passed 1/10/2020 1/10/2020 01/10/2020
LOWER LEVEL
Resolved
01/10/2020
PRE-ROCK OK RC-ok Units 102,104,106 - OK
Water Service Inspection Passed 01/24/2020
Sewer Service Inspection Passed 01/24/2020
Rated Assembly Inspection Partial 1/24/2020 1/24/2020 01/24/2020
Misc
Informational
01/24/2020
BLDG # 8 GARAGES
Sprinkler - Hydrostatic Test Failed 4/1/2020 04/01/2020
Sprinkler - Hydrostatic Test Passed 4/7/2020 04/07/2020
Piers/Caissons Inspection - Commercial Partial 4/17/2020 (8:00) 4/17/2020 04/17/2020
Misc
Informational
04/17/2020
- LIGHT POLE BASES, DRIVEN GROUND ROD IN PLACE, 1 EAST END OF BLDG, 3 IN PARKING LOT BETWEEN BLDG 7 & 8 -
Alarm Test Passed 4/28/2020 04/28/2020
Sprinkler - Flow Test Passed 4/28/2020 04/28/2020
Occupancy Inspection - Fire Failed 5/20/2020 05/20/2020
Occupancy Inspection - Fire Passed 5/20/2020 05/20/2020
Rated Assembly Inspection Passed 5/20/2020 05/20/2020
Misc
Informational
01/24/2020
BLDG # 8 GARAGES
Occupancy Inspection - Codes Commercial Failed 5/20/2020 5/20/2020 05/20/2020
Misc
Corrective Action Required
05/20/2020
- PROVIDE TAMPER PROFF CAPS A/C CONDENSORS - - OK FOR TCO WHEN OTHER DEPTS PASS - Michael Harkins 05/20/2020 3:18 PM
Rough Plumbing Inspection - Commercial Passed 5/22/2020 05/22/2020
Rough Mechanical Inspection - Commercial Passed 5/22/2020 05/22/2020
Rough Electrical Inspection - Commercial Passed 5/22/2020 05/22/2020
Piers/Caissons Inspection - Commercial Passed 5/22/2020 05/22/2020
Occupancy Inspection - Engineering Passed 05/22/2020
Occupancy Inspection - Codes Commercial Temporary C of O 5/22/2020 05/22/2020
Misc
Corrective Action Required
05/20/2020
- PROVIDE TAMPER PROFF CAPS A/C CONDENSORS - - OK FOR TCO WHEN OTHER DEPTS PASS - Michael Harkins 05/20/2020 3:18 PM
Occupancy Inspection - Planning Passed 10/30/2020
Occupancy Inspection - Planning Passed 10/30/2020
Occupancy Inspection - Codes Commercial Full C of O 10/30/2020
Misc
Resolved
10/30/2020
- PROVIDE TAMPER PROFF CAPS A/C CONDENSORS - - OK FOR TCO WHEN OTHER DEPTS PASS - Michael Harkins 05/20/2020 3:18 PM
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
01/07/2019 Letter Codes Building Permit
01/07/2019 Receipt Receipt for transaction: 2019-000072
03/22/2019 Letter INSPECTION SUMMARY
04/26/2019 image
04/26/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
11/13/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
12/04/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/31/2019 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/10/2020 Letter INSPECTION SUMMARY
01/24/2020 Letter INSPECTION SUMMARY
04/17/2020 Letter INSPECTION SUMMARY
05/20/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter Codes Temporary Certificate of Occupancy
10/30/2020 Letter Field Certificate of Occupancy
10/30/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home