Permit Application Status

PRCOM20170788


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170788
Building Permit - Commercial
Certificate of Occupancy
LBP V LLC
NEW SHELL BUILDING
NEW SHELL BUILDING FOR FUTURE WAREHOUSE
03/21/2017
05/16/2017
09/26/2017
02/13/2020
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
BLUE SPRINGS ELECTRICAL SERVICE, Address:3402 LAKE SHORE DR, Phone:(816) 224-9911  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
LBP V LLC, Address:3215 NE CARNEGIE DR STE 200, Phone:(816) 795-8100  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 04/04/2017 05/24/2017
Joe Dir
Installation acceptance testing
Corrective Action Required
09/25/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field test and acceptance testing of the system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Building Plan Review Approved 04/11/2017 05/18/2017
Joe Frogge
Final Development Plan
Resolved
05/18/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 4/10/17 - acknowledged
Misc
Resolved
04/10/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
04/10/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of door A116.
Misc
Resolved
04/10/2017

2012 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Revise parapet details to show compliant materials.
Misc
Resolved
04/10/2017

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Revise roof hatch details to show minimum 30" side rail extender.
Final Development Plan Review Approved 04/04/2017 05/16/2017
Development Center
Licensed Contractors Approved 04/04/2017 04/27/2017
Joe Frogge
LC - MEP Subs
Resolved
04/27/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Special Inspections Review Approved 04/10/2017
Joe Frogge
Fire Plan Review Approved with Conditions 04/11/2017 04/07/2017
Joe Dir
04/07/2017

ACTION REQUIRED: Provide civil plans showing the location of fire hydrants and the FDC. 903.3.7 Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Stortz type fitting and located within 100 feet of a fire hydrant.
04/07/2017

ACTION REQUIRED: NO KEYED LOCKS ON THE EGRESS SIDE OF AN EXIT [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate.
Construction documents for fire alarm systems
Corrective Action Required
04/04/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: Have the fire alarm system contractor provide engineered shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
04/04/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: Post the numeric and or the alphbetic suite designations on the Building and on the exterior of each door leading into each suite. the address shall be of a contrasting color to the background where posted. Building address shall be readable from the roadway. (verified at inspection)
Knox box required
Corrective Action Required
04/04/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED: A knox box can be obtained online at knoxbox.com The knox box shall be mounted on the exterior of the building above the fire department connection approximately 5-6 feet above finsih grade. (verified at inspection)
Construction documents - Fire protection systems
Corrective Action Required
04/04/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: Have the fire sprinkler system contractor provide engineered shop drawings of the fire sprinkler system to be installed. (information purposes)
Installation acceptance testing
Corrective Action Required
04/04/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field tests and acceptance testing of the fire alarm and fire sprinkler systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at 816-969-1300.
Portable fire extinguishers - general
Corrective Action Required
04/04/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: Provide and mount fire extinguishers according to plan sheet A2.1. The minimum size of the fire extinguishers shall be 2A-10BC (5 pound) (verified at inspection)
Building Plan Review Rejected 04/04/2017 03/30/2017
Joe Frogge
Final Development Plan
Corrective Action Required
03/30/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
03/30/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
03/30/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of door A116.
Misc
Corrective Action Required
03/30/2017

2012 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Revise parapet details to show compliant materials.
Misc
Corrective Action Required
03/30/2017

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Revise roof hatch details to show minimum 30" side rail extender.
Licensed Contractors Rejected 03/21/2017 03/30/2017
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/30/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 04/04/2017 03/29/2017
Joe Dir
Misc
Corrective Action Required
03/29/2017

ACTION REQUIRED: Provide civil plans showing the location of fire hydrants and the FDC. 903.3.7 Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Stortz type fitting and located within 100 feet of a fire hydrant.
Construction documents for fire alarm systems
Corrective Action Required
03/29/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: Have the fire alarm system contractor provide engineered shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
03/29/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: Post the numeric and or the alphbetic suite designations on the Building and on the exterior of each door leading into each suite. the address shall be of a contrasting color to the background where posted. Building address shall be readable from the roadway. (verified at inspection)
Knox box required
Corrective Action Required
03/29/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED: A knox box can be obtained online at knoxbox.com The knox box shall be mounted on the exterior of the building above the fire department connection approximately 5-6 feet above finsih grade. (verified at inspection)
Construction documents - Fire protection systems
Corrective Action Required
03/29/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: Have the fire sprinkler system contractor provide engineered shop drawings of the fire sprinkler system to be installed. (information purposes)
Installation acceptance testing
Corrective Action Required
03/29/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field tests and acceptance testing of the fire alarm and fire sprinkler systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at 816-969-1300.
Portable fire extinguishers - general
Corrective Action Required
03/29/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: Provide and mount fire extinguishers according to plan sheet A2.1. The minimum size of the fire extinguishers shall be 2A-10BC (5 pound) (verified at inspection)
Misc
Corrective Action Required
03/29/2017

ACTION REQUIRED: NO KEYED LOCKS ON THE EGRESS SIDE OF AN EXIT [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Shell Building $7,347.90 $7,347.90 Paid 05/11/2017
8331401-Water Tap Fee $22,067.00 $22,067.00 Paid 05/11/2017
8350015-Water Meter Fee $2,604.75 $2,604.75 Paid 05/11/2017
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 05/11/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 5/16/2017 5/16/2017 05/16/2017
Misc
Partial Correction
05/16/2017
-GRADE BEAM AND INTEGRATED COLUMN PADS OK BELOW: FROM EXISTING BUILDING LINE 6.1 TO LINE A.1/1.5, EXCEPT AT THE JUMP
Footing Inspection - Commercial Partial 5/18/2017 5/18/2017 05/18/2017
Misc
Partial Correction
05/16/2017
-EXTERIOR GRADE BEAM AND INTEGRATED COLUMN PADS OK -INTERIOR COLUMN PADS OK
Underslab Plumbing Inspection - Commercial Passed 6/5/2017 6/5/2017 06/05/2017
Electrical Service Inspection Failed 1/11/2018 1/11/2018 at 10:05 AM 01/11/2018
Misc
Corrective Action Required
01/11/2018
NO ACCESS TO EQUIPMENT ENCLOSURE INTERIOR
Electrical Service Inspection Passed 1/16/2018 1/16/2018 at 2:35 PM 01/16/2018
Misc
Resolved
01/16/2018
NO ACCESS TO EQUIPMENT ENCLOSURE INTERIOR
Electrical Service Inspection Passed 1/16/2018 2/8/2018 02/08/2018
Misc
Resolved
01/16/2018
NO ACCESS TO EQUIPMENT ENCLOSURE INTERIOR
Underground Electrical Inspection - Commercial Partial 5/22/2018 5/22/2018 at 1:35 PM 05/22/2018
Misc
Partial Correction
05/22/2018
LIGHT POLE PIERS: 2 LP PIERS AT BORTH SIDE AND 2 ON THE EAST SIDE
Underground Electrical Inspection - Commercial Partial 5/24/2018 5/24/2018 at 1:30 PM 05/24/2018
Misc
Partial Correction
05/22/2018
LIGHT POLE PIERS: 2 LP PIERS AT BORTH SIDE, 2 ON THE EAST SIDE, AND 2 ON THE WEST SIDE
Sprinkler - Hydrostatic Test Passed 6/20/2018 06/20/2018
Alarm Test Passed 8/30/2018 08/30/2018
Sprinkler - Flow Test Passed 8/30/2018 08/30/2018
Footing Inspection - Commercial Passed 08/30/2018
Misc
Resolved
08/30/2018
-EXTERIOR GRADE BEAM AND INTEGRATED COLUMN PADS OK -INTERIOR COLUMN PADS OK
Underground Electrical Inspection - Commercial Passed 08/30/2018
Misc
Resolved
08/30/2018
LIGHT POLE PIERS: 2 LP PIERS AT BORTH SIDE, 2 ON THE EAST SIDE, AND 2 ON THE WEST SIDE
Occupancy Inspection - Codes Commercial Temporary C of O 8/30/2018 8/30/2018 at 1:10 PM 08/30/2018
Misc
Corrective Action Required
08/30/2018
APPROVAL REQUIRED FROM: PLANNING, FIRE, WATER, FIELD SERVICE ENGINEER -SUBMIT FINAL SPECIAL INSPECTION LETTER -GROUND ALL LIGHT POLE BASES -INSTALL BONDING JUMPER AROUND DEVICES (BACKFLOW, ETC) AT WATER SERVICE WITH SAME SIZE GROUNDING ELECTRODE CONDUCTOR -GAS TEST NOT HOLDING PRESSURE FOER THE TWO SMALLER PIPES -PAINT ROOFTOP GAS PIPING -SEAL ROOF PENETRATIONS -PROTECT GROUNDING CONNECTION TO ROD. -POST AVAILABLE FAULT CURRENT PER 110.24 AND ARC-FLASH HAZARD WARNING PER 110.16
Occupancy Inspection - Fire Temporary C of O 8/30/2018 08/30/2018
Occupancy Inspection - Codes Commercial Failed 8/31/2018 at 2:55 PM 08/31/2018
Misc
Corrective Action Required
08/30/2018
APPROVAL REQUIRED FROM: PLANNING, FIRE, WATER, FIELD SERVICE ENGINEER -SUBMIT FINAL SPECIAL INSPECTION LETTER -GROUND ALL LIGHT POLE BASES -INSTALL BONDING JUMPER AROUND DEVICES (BACKFLOW, ETC) AT WATER SERVICE WITH SAME SIZE GROUNDING ELECTRODE CONDUCTOR -PAINT ROOFTOP GAS PIPING -SEAL ROOF PENETRATIONS -PROTECT GROUNDING CONNECTION TO ROD. -POST AVAILABLE FAULT CURRENT PER 110.24 AND ARC-FLASH HAZARD WARNING PER 110.16 -PROTECT THE SERVICE EQUIPMENTS
Occupancy Inspection - Water Utilities Passed 09/05/2018
Occupancy Inspection - Codes Commercial Failed 12/30/2019 12/30/2019
Misc
Corrective Action Required
08/31/2018
-APPROVAL REQUIRED FROM: PLANNING, FIRE, FIELD SERVICE -SUBMIT FINAL SPECIAL INSPECTION LETTER -PROTECT GROUNDING CONNECTION TO ROD. -PROTECT THE SERVICE EQUIPMENTS AND GAS -FLOOR DRAIN NOT INSTALLED IN MECHANICAL RM -POST AVAILABLE FAULT CURRENT PER 110.24 AND ARC-FLASH HAZARD WARNING PER 110.16
Occupancy Inspection - Engineering Passed 02/05/2020
Occupancy Inspection - Fire Passed 02/05/2020
Occupancy Inspection - Codes Commercial Full C of O 02/13/2020
Misc
Resolved
02/13/2020
Documents & Images
Date Uploaded File Type Document Name
03/29/2017 Letter Fire Building Plan Review
03/30/2017 Letter Codes P/R Corrections Document
04/07/2017 Letter Fire Building Plan Review
04/10/2017 Spec Insp
05/11/2017 Receipt Receipt for transaction: 2017-002279
05/16/2017 Letter Codes Building Permit
05/16/2017 Letter Codes Plan Review Conditions
05/16/2017 Letter Inspection Summary
05/18/2017 Letter Inspection Summary
06/05/2017 Letter Inspection Summary
09/25/2017 Letter Fire (Sprinkler) Plan Review
01/11/2018 Letter Inspection Summary
01/16/2018 Letter Inspection Summary
02/08/2018 Letter Inspection Summary
05/22/2018 Letter Inspection Summary
05/24/2018 Letter Inspection Summary
08/30/2018 Letter Codes Temporary Certificate of Occupancy
08/31/2018 Letter Inspection Summary
04/04/2019 Letter Codes 10 Day Letter
12/30/2019 Letter INSPECTION SUMMARY
12/31/2019 Engineer Report/Study 03532506 LBP V-A Lee's Summit
02/13/2020 Letter Field Certificate of Occupancy
03/17/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home