Permit Application Status

PRCOM20170501


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170501
Building Permit - Commercial
Certificate of Occupancy
PREMIERLIFE REAL ESTATE HOLDING
NEW TENANT FINISH
COMMERCIAL TENANT FINISH
02/24/2017
03/22/2017
09/03/2017
04/27/2017
Locations
Contacts
PREMIERLIFE REAL ESTATE HOLDING, Address:400 NW MURRAY RD  
DIAMOND CONTRACTORS INC, Address:4224 NE PORT DR, Phone:(816) 650-9200  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
SCHOELLER PLUMBING INC, Address:PO BOX 1268, Phone:(816) 628-3848  
EVANS JACK O & BRENDA G, Address:3109 SW ROBERTS DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 04/17/2017
Joe Dir
Installation acceptance testing
Corrective Action Required
04/17/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Acceptance testing of the alarm systems activation and notification devices will be required prior to the final occupancy inspecion. To schedule a test contact the fire department at 816-969-1300
Misc
Corrective Action Required
04/17/2017

ACTION REQUIRED:(verified at inspection) A smoke detectior needs to be installed above the new NAC panel.
Building Plan Review Approved 03/16/2017 03/09/2017
Joe Frogge
Misc
Resolved
03/09/2017

Assembly use listed on permit application. Action required: Provide business plan or other explanation of how/when/where lectures will be performed. this space is currently approved for up to 30 occupants. Increases can be approved with further information. 3/9/17 - per architect, lectures are for occupants already in the space so are covered by the 1/100 occ load
Bldg - Toilet room wall finish 1210.2.2
Resolved
03/09/2017

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant restroom finishes. (if paint is used, it must be epoxy based)
Misc
Resolved
03/09/2017

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Modify drawings to demonstrate compliance at Coat Hooks, Break Room Counter/Sink, Coffee Area, and Reception desk.
Misc
Resolved
03/09/2017

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. (at break room)
Fire Plan Review Approved with Conditions 03/16/2017 03/09/2017
Joe Frogge
Misc
Corrective Action Required
03/09/2017

NO KEYED LOCKS ON THE EGRESS SIDE ON A MARKED EXIT. (VERIFIED AT INSPECTION)
Construction documents for fire alarm systems
Corrective Action Required
03/09/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE THE FIRE ALARM SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS FOR ANY MODIFICATIONS TO BE DONE TO THE FIRE ALARM SYSTEM. (INFORMATION PURPOSES)
Address numbers required
Corrective Action Required
03/09/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 413 ON THE EXTERIOR OF THE FRONT AND REAR DOORS. THE ADDRESS SHALL BE IN A CONTRASTING COLOR TO THE BACKGROUND. ADDRESS SHALL BE READBLE FROM THE ROADWAY. (VERIFIED AT INSPECTION)
Portable fire extinguishers - general
Corrective Action Required
03/09/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE A MINIMUM OF ONE 2A-10BC FIRE EXTINGUISHER. (5 POUND) ONE FOR EVERY 3,000 SQ FT OF BUSINESS SPACE. (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
03/09/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHER TO HAVE A MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANYWHERE WITHIN THE BUSINESS AREA.
Construction documents - Fire protection systems
Corrective Action Required
03/09/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE FIRE SPRINKLER CONTRACTOR PROVIDE SHOP DRAWINGS OF ANY MODIFICATIONS TO BE DONE TO THE FIRE SPRINKLER SYSTEM. (INFORMATION PURPOSES)
Installation acceptance testing
Corrective Action Required
03/09/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ANY MODIFICATION DONE TO THE FIRE ALARM SYSTEM SHALL BE TESTED PRIOR TO THE FINAL OCCUPANCY INSPECTION. (INFORMATION PURPOSES)
Licensed Contractors Approved 03/09/2017 03/09/2017
Joe Frogge
LC - MEP Subs
Resolved
03/09/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 03/08/2017 03/07/2017
Joe Frogge
Misc
Corrective Action Required
03/07/2017

Assembly use listed on permit application. Action required: Provide business plan or other explanation of how/when/where lectures will be performed. this space is currently approved for up to 30 occupants. Increases can be approved with further information.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
03/07/2017

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant restroom finishes. (if paint is used, it must be epoxy based)
Misc
Corrective Action Required
03/07/2017

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Modify drawings to demonstrate compliance at Coat Hooks, Break Room Counter/Sink, Coffee Area, and Reception desk.
Misc
Corrective Action Required
03/07/2017

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. (at break room)
Licensed Contractors Rejected 03/08/2017 03/07/2017
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/07/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 03/08/2017 02/27/2017
Joe Dir
Misc
Corrective Action Required
02/27/2017

NO KEYED LOCKS ON THE EGRESS SIDE ON A MARKED EXIT. (VERIFIED AT INSPECTION)
Construction documents for fire alarm systems
Corrective Action Required
02/27/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE THE FIRE ALARM SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS FOR ANY MODIFICATIONS TO BE DONE TO THE FIRE ALARM SYSTEM. (INFORMATION PURPOSES)
Address numbers required
Corrective Action Required
02/27/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 413 ON THE EXTERIOR OF THE FRONT AND REAR DOORS. THE ADDRESS SHALL BE IN A CONTRASTING COLOR TO THE BACKGROUND. ADDRESS SHALL BE READBLE FROM THE ROADWAY. (VERIFIED AT INSPECTION)
Portable fire extinguishers - general
Corrective Action Required
02/27/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE A MINIMUM OF ONE 2A-10BC FIRE EXTINGUISHER. (5 POUND) ONE FOR EVERY 3,000 SQ FT OF BUSINESS SPACE. (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
02/27/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHER TO HAVE A MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANYWHERE WITHIN THE BUSINESS AREA.
Construction documents - Fire protection systems
Corrective Action Required
02/27/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE FIRE SPRINKLER CONTRACTOR PROVIDE SHOP DRAWINGS OF ANY MODIFICATIONS TO BE DONE TO THE FIRE SPRINKLER SYSTEM. (INFORMATION PURPOSES)
Installation acceptance testing
Corrective Action Required
02/27/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ANY MODIFICATION DONE TO THE FIRE ALARM SYSTEM SHALL BE TESTED PRIOR TO THE FINAL OCCUPANCY INSPECTION. (INFORMATION PURPOSES)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $142.98 $142.98 Paid 03/09/2017
8331507-Sewer Connection Fee $30.00 $30.00 Paid 03/09/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 3/27/2017 3/27/2017 03/27/2017
Misc
Partial Correction
03/27/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: ALL WALLS EXCEPT PLAY/COFFEE AND EAST RESTROOM
Misc
Corrective Action Required
03/27/2017
IPC 305.8; IRC P2603: SHIELD PLATES REQUIRED AT BASE PLATES / BOTTOM TRACKS AND TOP PLATES / TRACKS SHALL EXTEND A MINIMUM OF 2" ABOVE BASE PLATES / BOTTOM TRACKS AND BELOW TOP PLATES / TRACKS.
Misc
Corrective Action Required
03/27/2017
PERMANENT CAP ABANDONED DWV PIPES.
Underslab Plumbing Inspection - Commercial Passed 3/27/2017 03/27/2017
In-wall Inspection Passed 3/29/2017 03/29/2017
Misc
Resolved
03/29/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: ALL WALLS EXCEPT PLAY/COFFEE AND EAST RESTROOM
In-wall Inspection Passed 3/29/2017 03/29/2017
Misc
Partial Correction
03/27/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: ALL WALLS EXCEPT PLAY/COFFEE AND EAST RESTROOM
Misc
Resolved
03/29/2017
IPC 305.8; IRC P2603: SHIELD PLATES REQUIRED AT BASE PLATES / BOTTOM TRACKS AND TOP PLATES / TRACKS SHALL EXTEND A MINIMUM OF 2" ABOVE BASE PLATES / BOTTOM TRACKS AND BELOW TOP PLATES / TRACKS.
Misc
Resolved
03/29/2017
PERMANENT CAP ABANDONED DWV PIPES.
Above Ceiling Inspection Passed 4/17/2017 4/17/2017 04/17/2017
Occupancy Inspection - Codes Commercial Full C of O 4/27/2017 4/27/2017 04/27/2017
Occupancy Inspection - Fire Passed 4/27/2017 04/27/2017
Documents & Images
Date Uploaded File Type Document Name
02/27/2017 Letter Fire Building Plan Review
03/07/2017 Letter Codes P/R Corrections Document
03/09/2017 Letter Codes Plan Review Conditions
03/09/2017 Receipt Receipt for transaction: 2017-000823
03/22/2017 Letter Codes Building Permit
03/27/2017 Letter Inspection Summary
03/29/2017 Letter Inspection Summary
04/17/2017 Letter Inspection Summary
04/17/2017 Letter Fire (Alarm) Plan Review Notice
04/27/2017 Letter Field Certificate of Occupancy
04/28/2017 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home