Permit Application Status

PRCOM20170207


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170207
Building Permit - Commercial
Certificate of Occupancy
GALE COMMUNITIES INC
CHANGE OF TENANT
INTERIOR ALTERATIONS FOR NEW TENANT *drawings are in plan review file
01/31/2017
02/03/2017
02/10/2017
Locations
Contacts
MID-AMERICA CONTRACTORS INC, Address:1400 IRON, Phone:(816) 221-4516  
H & S ELECTRIC, Address:4901 ANTIOCH RD, Phone:(913) 206-1486  
SCHARHAG ARCHITECTS, Address:310 ARMOR RD, #22, Phone:(816) 221-9297  
GALE COMMUNITIES INC, Address:400 SW LONGVIEW BLVD STE 105  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Licensed Contractors Approved 01/31/2017 02/03/2017
Joe Frogge
LC - MEP Subs
Resolved
02/03/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed electrical contractor.
Building Plan Review Approved with Conditions 02/10/2017 02/02/2017
Joe Frogge
License Tax Application
Resolved
02/03/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
02/02/2017

Incorrect construction type noted in code analysis. Action required: Comment is for informational purposes. I have changed from IIB to VB by hand.
Misc
Corrective Action Required
02/02/2017

Unable to locate permit for existing tenant at suite 200. Action required: Verify suite numbers.
Fire Plan Review Approved with Conditions 02/10/2017 02/01/2017
Joe Dir
Misc
Corrective Action Required
02/01/2017

Egress Doors: [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. (VERIFIED AT INSPECTION)
Construction documents for fire alarm systems
Corrective Action Required
02/01/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE FIRE ALARM SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS FOR ANY MODIFICATIONS TO BE DONE TO THE FIRE ALARM SYSTEM. (INFORMATION PURPOSES)
Address numbers required
Corrective Action Required
02/01/2017

2012IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE SUITE DESIGNATION ON THE ENTRY DOORS TO THE SUITES IN A CONTRAST COLOR TO THE BACKGROUND. (VERIFIED AT INSPECTION)
Construction documents - Fire protection systems
Corrective Action Required
02/01/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE FIRE SPRINKLER SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS FOR ANY MODIFICATION TO BE DONE TO THE FIRE SPRINKLER SYSTEM. (INFORMATION PURPOSES)
Portable fire extinguishers - general
Corrective Action Required
02/01/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE ONE 2A-10BC FIRE EXTINGUISHER FOR EACH SUITE. (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
02/01/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS ON A NORMAL PATH OF TRAVEL CLOSE TO AN EXIT. (VERIFIED AT INSPECTION)
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
02/01/2017

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. THE EXISTING FIRE SPRINKLER SYSTEM RISER SHALL BE CURRENT WITH ALL REQUIRED SERVICE AND MAINTENANCE. A CURRENT SERVICE TAG SHALL BE POSTED ON THE SYSTEMS RISER. (VERIFIED AT INSPECTION)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $30.00 $30.00 Paid 02/03/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Passed 2/8/2017 2/8/2017 02/08/2017
Above Ceiling Inspection Passed 02/08/2017
In-wall Inspection Passed 02/08/2017
Occupancy Inspection - Codes Commercial Passed 02/08/2017
Documents & Images
Date Uploaded File Type Document Name
02/01/2017 Letter Fire Building Plan Review
02/03/2017 Letter Codes Plan Review Conditions
02/03/2017 Receipt Receipt for transaction: 2017-000343
02/03/2017 Letter Codes Building Permit
02/08/2017 Letter Inspection Summary
02/10/2017 Letter Codes Final Certificate of Occupancy
02/14/2017 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home