Permit Application Status

PRCOM20160710


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20160710
Building Permit - Commercial
Certificate of Occupancy
LBP III LLC
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS
04/05/2016
04/20/2016
10/11/2016
05/13/2016
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
BLUE SPRINGS ELECTRICAL SERVICE, Address:3402 LAKE SHORE DR, Phone:(816) 224-9911  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
LBP III LLC, Address:3215 NE CARNEGIE DR STE 200  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 04/15/2016 04/19/2016
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
04/14/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR ANY ALTERATIONS TO THE ALARM SYSTEM.
Address numbers required
Corrective Action Required
04/14/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 2724 ON THE EXTERIOR OF THE FRONT AND REAR DOORS LEADING INTO THE BUSINESS.
Construction documents - Fire protection systems
Corrective Action Required
04/14/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRATOR PROVIDE SHOP DRAWINGS FOR ANY ALTERATIONS OF THE FIRE SPRINKLER SYSTEM
Installation acceptance testing
Corrective Action Required
04/14/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR THE ALARM SYSTEM PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT @ 816-969-1300
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
04/14/2016

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. THE FIRE SPRINKLER SYSTEM WILL BE CURRENT ON THE REQUIRED ANNUAL MAINTENANCE, AND HAVE A CURRENT SERVICE TAG ON THE RISER. VERIFIED AT INSPECTION.
Portable fire extinguishers - general
Corrective Action Required
04/14/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE A MINIMUM OF TWO 2A-10BC RATED FIRE EXTINGUISHERS.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/14/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS ON A NORMAL PATH OF TRAVEL CLOSE TO AN EXIT WITH A MAXIMUM TRAVEL DISTANCE OF 75' FROM ANYWHERE IN THE BUILDING.
Building Plan Review Approved with Conditions 04/26/2016 04/19/2016
Joe Frogge
License Tax Application
Corrective Action Required
04/19/2016

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Gen - Submittal documents 7-137
Resolved
04/19/2016

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Submit all mezzanine information including intended use. Information must demonstrate compliance with all aspects of 2012 IBC Section 505 4/14/16 - mezzanine to be under separate permit
Misc
Resolved
04/19/2016

2012 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2012 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2012 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule for water, DWV and NG.
Licensed Contractors Approved 04/19/2016 04/19/2016
Joe Frogge
Building Plan Review Rejected 04/15/2016 04/14/2016
Joe Frogge
License Tax Application
Corrective Action Required
04/14/2016

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Gen - Submittal documents 7-137
Corrective Action Required
04/19/2016

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Submit all mezzanine information including intended use. Information must demonstrate compliance with all aspects of 2012 IBC Section 505 4/14/16 - mezzanine to be under separate permit
Misc
Corrective Action Required
04/19/2016

2012 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2012 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2012 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule for water, DWV and NG.
Fire Plan Review Rejected 04/15/2016 04/06/2016
Joe Dir
Misc
Corrective Action Required
04/06/2016

NO INFORMATION ABOUT WHAT IS BEING STORED AND WHAT TYPE OF STORAGE TO BE USED ON MEZZANINE AND IN THE WAREHOUSE.
Construction documents for fire alarm systems
Corrective Action Required
04/06/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR ANY ALTERATIONS TO THE ALARM SYSTEM.
Address numbers required
Corrective Action Required
04/06/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 2724 ON THE EXTERIOR OF THE FRONT AND REAR DOORS LEADING INTO THE BUSINESS.
Construction documents - Fire protection systems
Corrective Action Required
04/06/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRATOR PROVIDE SHOP DRAWINGS FOR ANY ALTERATIONS OF THE FIRE SPRINKLER SYSTEM
Installation acceptance testing
Corrective Action Required
04/06/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR THE ALARM SYSTEM PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT @ 816-969-1300
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
04/06/2016

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. THE FIRE SPRINKLER SYSTEM WILL BE CURRENT ON THE REQUIRED ANNUAL MAINTENANCE, AND HAVE A CURRENT SERVICE TAG ON THE RISER. VERIFIED AT INSPECTION.
Portable fire extinguishers - general
Corrective Action Required
04/06/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE A MINIMUM OF TWO 2A-10BC RATED FIRE EXTINGUISHERS.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/06/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS ON A NORMAL PATH OF TRAVEL CLOSE TO AN EXIT WITH A MAXIMUM TRAVEL DISTANCE OF 75' FROM ANYWHERE IN THE BUILDING.
Licensed Contractors Approved 04/15/2016 04/05/2016
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $162.58 $162.58 Paid 04/20/2016
8331507-Sewer Connection Fee $30.00 $30.00 Paid 04/20/2016
8331506-EFHB Maybrook, Full $42.61 $42.61 Paid 04/20/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 4/21/2016 (8:00 to 5:00) 4/21/2016 04/21/2016
Electrical Service Inspection Passed 4/21/2016 04/21/2016
In-wall Inspection Passed 4/28/2016 04/28/2016
Gas Service Inspection - Commercial Not Ready 5/10/2016 5/10/2016 05/10/2016
Occupancy Inspection - Codes Commercial Temporary C of O 5/12/2016 5/12/2016 05/12/2016
Misc
Corrective Action Required
05/12/2016
ESTABLISH GAS SERVICE
Alarm Test Passed 5/12/2016 05/12/2016
Occupancy Inspection - Fire Passed 5/12/2016 05/12/2016
Gas Service Inspection - Commercial Passed 5/13/2016 05/13/2016
Occupancy Inspection - Codes Commercial Full C of O 5/13/2016 05/13/2016
Misc
Corrective Action Required
05/12/2016
ESTABLISH GAS SERVICE
Documents & Images
Date Uploaded File Type Document Name
04/06/2016 Letter Fire Building Plan Review
04/14/2016 Letter Codes P/R Corrections Document
04/20/2016 Letter Codes Plan Review Conditions
04/20/2016 Receipt Receipt for transaction: 2016-001231
04/20/2016 Letter Codes Building Permit
04/21/2016 Letter Inspection Summary
04/28/2016 Letter Inspection Summary
05/10/2016 Letter Inspection Summary
05/12/2016 Letter Codes Temporary Certificate of Occupancy
05/13/2016 Letter Field Certificate of Occupancy
05/16/2016 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home