Permit Application Status

PRCOM20160557


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20160557
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DIST NO 7
NEW COMMERCIAL
NEW CONCESSION BUILDING WITH RESTROOMS
03/18/2016
05/03/2016
10/01/2016
01/03/2017
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
MID-STATES HEATING & COOLING, Address:4011 MAIN ST, Phone:(816) 765-7886  
FACILITY SOLUTIONS GROUP INC, Address:17880 W 99TH ST, Phone:(913) 422-8400  
QUESTEC MECHANICAL INC, Address:1390 E BOONE INDUSTRIAL DR, SUITE 260, Phone:(573) 875-0260  
HTK ARCHITECTS, Address:9300 W 110TH ST, STE 150, Phone:(913) 663-5373  
REORGANIZED SCHOOL DIST NO 7, Address:301 NE Tudor Rd, Phone:(816) 986-1000  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/25/2016 04/28/2016
Joe Frogge
LC - General Contractor
Resolved
04/28/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Building Plan Review Approved with Conditions 05/02/2016 04/28/2016
Joe Frogge
Accessibility - Water closet location 604.2
Resolved
04/28/2016

ICC A117.1-2009 604.2 – Location. The water closet shall be located with a wall or partition to the rear and to one side. The centerline of the water closet shall be 16 inches minimum and 18 inches maximum from the side wall or partition. Water closets located in ambulatory accessible compartments specified in Section 604.10 shall have the centerline of the water closet 17 inches minimum and 19 inches maximum from the side wall or partition. Action required: Relocate and re-dimension accessible water closets.
Health Dept Inspection
Resolved
04/28/2016

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 4/28/16 - Jxn Cty not required to be involved. Only packaged foods/drinks being sold. No dishes to wash and no soda fountain.
Health Dept Review
Resolved
04/28/2016

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 4/28/16 - Jxn Cty not required to be involved. Only packaged foods/drinks being sold. No dishes to wash and no soda fountain.
Misc
Corrective Action Required
04/25/2016

2012 IBC 1804.3 Site grading. The ground immediately adjacent to the foundation shall be sloped away from the building at a slope of not less than one unit vertical in 20 units horizontal (5-percent slope) for a minimum distance of 10 feet (3048 mm) measured perpendicular to the face of the wall. If physical obstructions or lot lines prohibit 10 feet (3048 mm) of horizontal distance, a 5-percent slope shall be provided to an approved alternative method of diverting water away from the foundation. Swales used for this purpose shall be sloped a minimum of 2 percent where located within 10 feet (3048 mm) of the building foundation. Impervious surfaces within 10 feet (3048 mm) of the building foundation shall be sloped a minimum of 2 percent away from the building. Exception: Where climatic or soil conditions warrant, the slope of the ground away from the building foundation shall be permitted to be reduced to not less than one unit vertical in 48 units horizontal (2-percent slope). The procedure used to establish the final ground level adjacent to the foundation shall account for additional settlement of the backfill. Action required: Provide verification that site can/will be properly drained away from foundation. 4/28/16 - acknowledged in letter - to be field verified.
Fire Plan Review Approved 05/02/2016 04/28/2016
Joe Dir
04/28/2016

04/28/2016

Misc
Corrective Action Required
04/28/2016

ALL PREVIOUS CONDITIONS WERE ACKNOWLEDGED IN RESUB LETTER AND PLANS
Fire Plan Review Approved with Conditions 03/30/2016 04/01/2016
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
04/01/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required: Provide a minimum of one, 2A:10B:C.
Misc
Corrective Action Required
04/01/2016

2012 IFC 3311.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. Action required: A temporary exiting plan shall be provided for review.
Building Plan Review Rejected 03/30/2016 03/25/2016
Joe Frogge
Accessibility - Water closet location 604.2
Corrective Action Required
03/25/2016

ICC A117.1-2009 604.2 – Location. The water closet shall be located with a wall or partition to the rear and to one side. The centerline of the water closet shall be 16 inches minimum and 18 inches maximum from the side wall or partition. Water closets located in ambulatory accessible compartments specified in Section 604.10 shall have the centerline of the water closet 17 inches minimum and 19 inches maximum from the side wall or partition. Action required: Relocate and re-dimension accessible water closets.
Health Dept Inspection
Corrective Action Required
03/25/2016

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
03/25/2016

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
03/30/2016

2012 IBC 1804.3 Site grading. The ground immediately adjacent to the foundation shall be sloped away from the building at a slope of not less than one unit vertical in 20 units horizontal (5-percent slope) for a minimum distance of 10 feet (3048 mm) measured perpendicular to the face of the wall. If physical obstructions or lot lines prohibit 10 feet (3048 mm) of horizontal distance, a 5-percent slope shall be provided to an approved alternative method of diverting water away from the foundation. Swales used for this purpose shall be sloped a minimum of 2 percent where located within 10 feet (3048 mm) of the building foundation. Impervious surfaces within 10 feet (3048 mm) of the building foundation shall be sloped a minimum of 2 percent away from the building. Exception: Where climatic or soil conditions warrant, the slope of the ground away from the building foundation shall be permitted to be reduced to not less than one unit vertical in 48 units horizontal (2-percent slope). The procedure used to establish the final ground level adjacent to the foundation shall account for additional settlement of the backfill. Action required: Provide verification that site can/will be properly drained away from foundation.
Licensed Contractors Rejected 03/30/2016 03/25/2016
Joe Frogge
LC - General Contractor
Corrective Action Required
03/25/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $1,732.80 $1,732.80 Paid 04/29/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 7/5/2016 (1:00) 7/5/2016 07/05/2016
Misc
Corrective Action Required
07/05/2016
pending special inspections report
Underground Electrical Inspection - Commercial Partial 7/11/2016 7/11/2016 07/11/2016
Underground Plumbing Inspection - Commercial Passed 7/15/2016 7/15/2016 07/15/2016
Underslab Electrical Inspection - Commercial Passed 7/20/2016 7/20/2016 07/20/2016
Electrical Service Inspection Partial 8/23/2016 8/23/2016 08/23/2016
Misc
Corrective Action Required
08/23/2016
MDP- service and grounds in place. need to check electrcical to scoreboard. and transformer set up.
Electrical Service Inspection Partial 8/25/2016 8/25/2016 08/24/2016
Misc
Corrective Action Required
08/23/2016
MDP- ok to release to KCPL. check score board feeders later date.
Above Ceiling Inspection Partial 10/4/2016 10/4/2016 10/04/2016
Misc
Corrective Action Required
10/04/2016
BEND CLIPS OUT ON 3 LIGHTS
Sewer Service Inspection Passed 11/9/2016 (8:00) 11/9/2016 at 7:45 AM 11/09/2016
Water Service Inspection Passed 11/10/2016 (2:00) 11/10/2016 11/10/2016
Occupancy Inspection - Fire Passed 1/3/2017 01/03/2017
Occupancy Inspection - Codes Commercial Full C of O 1/3/2017 1/3/2017 01/03/2017
Documents & Images
Date Uploaded File Type Document Name
04/04/2016 Letter Codes P/R Corrections Document
04/28/2016 Letter Fire Building Plan Review
04/28/2016 Letter Codes Plan Review Conditions
04/29/2016 Receipt Receipt for transaction: 2016-001423
05/03/2016 Letter Codes Building Permit
07/05/2016 Letter Inspection Summary
07/11/2016 Letter Inspection Summary
07/15/2016 Letter Inspection Summary
07/20/2016 Letter Inspection Summary
08/23/2016 Letter Inspection Summary
08/24/2016 Letter Inspection Summary
10/04/2016 Letter Inspection Summary
11/09/2016 Letter Inspection Summary
11/10/2016 Letter Inspection Summary
01/03/2017 Letter Codes Final Certificate of Occupancy
01/04/2017 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home