Summary
PRCOM20160556
Building Permit - Commercial
Final Completion
LEES SUMMIT SCHOOL DIST R 7
ALTERATION COMMERCIAL
SCIENCE AND MUSIC CLASS RENOVATIONS
03/18/2016
05/03/2016
01/05/2017
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
MID-STATES HEATING & COOLING, Address:4011 MAIN ST, Phone:(816) 765-7886  
FACILITY SOLUTIONS GROUP INC, Address:17880 W 99TH ST, Phone:(913) 422-8400  
QUESTEC MECHANICAL INC, Address:1390 E BOONE INDUSTRIAL DR, SUITE 260, Phone:(573) 875-0260  
HTK ARCHITECTS, Address:9300 W 110TH ST, STE 150, Phone:(913) 663-5373  
LEES SUMMIT SCHOOL DIST R 7, Address:600 MILLER  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 12/31/2016
Joe Dir
Alarm Plan Review Released for Construction 12/31/2016
Joe Dir
Licensed Contractors Approved 03/30/2016 04/28/2016
Joe Frogge
LC - General Contractor
Resolved
04/28/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fire Plan Review Approved 03/30/2016 04/28/2016
Joe Dir
04/28/2016

04/28/2016

04/28/2016

Misc
Corrective Action Required
04/28/2016

ALL PREVIOUS CONDITIONS WERE ACKNOWLEDGED IN RESUB LETTER AND PLANS
Building Plan Review Approved 03/30/2016 04/04/2016
Joe Frogge
Misc
Resolved
04/04/2016

1015.2.1 Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. Exceptions: 1. Where interior exit stairways are interconnected by a 1-hour fire-resistance-rated corridor conforming to the requirements of Section 1018, the required exit separation shall be measured along the shortest direct line of travel within the corridor. 2. Where a building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or 903.3.1.2, the separation distance of the exit doors or exit access doorways shall not be less than one-third of the length of the maximum overall diagonal dimension of the area served. Action required: Occupant loads in Instrument Room C30 and Vocal Room C32 exceed 50. Exit doors must be spaced no closer than half the diagonal distance of each room. 4/4/16 - coordinated with FD and given that this is an existing condition with no practical method to comply we decided to allow exits as shown via allowing for large instrument storage, designated walking paths, etc. to reduce square footage in calculating occupancy.
Fire Plan Review Approved with Conditions 03/30/2016 04/04/2016
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
04/03/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required: Provide shop drawings for review and approval.
Portable fire extinguishers - general
Corrective Action Required
04/03/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required: Provide fire extinguishers in the science rooms.erified at inspection.
Misc
Corrective Action Required
04/03/2016

Indicate the location of the NG shut switch in each of the science classrooms.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $3,299.00 $3,299.00 Paid 04/29/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 6/16/2016 06/16/2016
Misc
Partial Correction
06/16/2016
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN PIPING AT: 3" PVC AT A153 FROM SCIENCE RM A154 TO ~33LF EAST**; 4" PVC AT 156 CONNECTED TO EXSTG 6" @ N END; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM. **NOTE LESS LENGTH THAN SHOWN ON APPROVED DRAWINGS.
Underslab Plumbing Inspection - Commercial Partial 6/22/2016 6/22/2016 06/22/2016
Misc
Partial Correction
06/16/2016
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN PIPING AT: 3" PVC AT A153 FROM SCIENCE RM A154 TO ~33LF EAST**; 4" PVC AT 156 CONNECTED TO EXSTG 6" @ N END; ROOMS A154; A115; A119; A118; A121 APPROVED TO COVER NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM. **NOTE LESS LENGTH THAN SHOWN ON APPROVED DRAWINGS.
Rough Mechanical Inspection - Commercial Not Ready 7/1/2016 7/1/2016 07/01/2016
Misc
Corrective Action Required
07/01/2016
PLUMBING IN WALLS IN COMPLETE AT TIME OF INSPECTION. SCHEDULE WHEN READY.
Rough Electrical Inspection - Commercial Partial 7/5/2016 7/5/2016 07/05/2016
Misc
Corrective Action Required
07/05/2016
ROOMS- C30-EAST & WEST WALL C32-WEST & WEST WALL ELECTRCIAL AT CORNERS WILL TERMINATE ON FACE OF WALL.
In-wall Inspection Failed 7/15/2016 7/15/2016 07/15/2016
Misc
Corrective Action Required
07/15/2016
SPACES A118 & A121: - COMPLETE DRAIN PIPING AT A121 W WALL - REPAIR/REINFORCE DAMAGED STUDS @ A121 E - INSTALL BOCA PLATES TO PROTECT PVC PIPE - SOME ELECTRCIAL BOX STAND-OFFS TOO SHORT - PROTECT COPPER DRAIN PIPE @ A121 W WITH SHIELD PLATES
In-wall Inspection Partial 7/18/2016 7/18/2016 07/18/2016
Misc
Partial Correction
07/18/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: SPACES A118 & A121;
Gas Piping Inspection - Commercial Partial 7/18/2016 07/18/2016
Misc
Partial Correction
07/18/2016
GAS PIPING PRESSURE TEST HELD STEADY AT >= 10 PSI FOR >=10 MINUTES AT SPACES: A118; A121;
Gas Piping Inspection - Commercial Partial 7/18/2016 07/18/2016
Misc
Partial Correction
07/18/2016
GAS PIPING PRESSURE TEST AT A118; A121 OK EXCEPT HIGH GAUGE IN A118 TO BE RE-TESTED BY P.C. TO ENSURE NO LEAKS.
In-wall Inspection Partial 7/21/2016 7/21/2016 07/21/2016
Misc
Partial Correction
07/18/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: SPACES A118 & A121; A115; A119;
In-wall Inspection Partial 7/27/2016 7/27/2016 07/27/2016
Misc
Partial Correction
07/21/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: SPACES A118 & A121; A115; A119; A126; A154;
Above Ceiling Inspection Partial 8/8/2016 8/8/2016 08/08/2016
Misc
Partial Correction
08/08/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A115; A118; A119; A121; CORRIDOR 153 CENTER WHERE REMOVED FOR PIPE INSTALLATION; A154; CORRIDOR 154 CENTER WHERE REMOVED FOR PIPE INSTALLATION*; * CONDITION OF EXISTING SYSTEMS AND WORK BY OTHERS TO BE DISCUSSED WITH R-7 FACILITIES MANAGER
Above Ceiling Inspection Partial 8/9/2016 08/09/2016
Misc
Partial Correction
08/08/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A115; A118; A119; A121; CORRIDOR 153 CENTER WHERE REMOVED FOR PIPE INSTALLATION; A154; CORRIDOR 154 CENTER WHERE REMOVED FOR PIPE INSTALLATION*; C30; C32; * CONDITION OF EXISTING SYSTEMS AND WORK BY OTHERS TO BE DISCUSSED WITH R-7 FACILITIES MANAGER
Alarm Test Failed 8/12/2016 08/12/2016
Final Inspection - Commercial Partial 8/12/2016 8/12/2016 08/12/2016
Misc
Corrective Action Required
08/12/2016
GLAZING, WHEN INSTALLED, MUST BE SAFETY GLAZING.
Misc
Corrective Action Required
08/12/2016
USE/OCCUPANCY STATUS: OK FOR USE PENDING INSPECTION OF GLAZING WHEN INSTALLED.
Above Ceiling Inspection Passed 8/9/2016 08/12/2016
Misc
Resolved
08/12/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A115; A118; A119; A121; CORRIDOR 153 CENTER WHERE REMOVED FOR PIPE INSTALLATION; A154; CORRIDOR 154 CENTER WHERE REMOVED FOR PIPE INSTALLATION*; C30; C32; * CONDITION OF EXISTING SYSTEMS AND WORK BY OTHERS TO BE DISCUSSED WITH R-7 FACILITIES MANAGER
In-wall Inspection Passed 7/27/2016 08/12/2016
Misc
Resolved
08/12/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: SPACES A118 & A121; A115; A119; A126; A154;
Rough Electrical Inspection - Commercial Passed 7/5/2016 08/12/2016
Rough Mechanical Inspection - Commercial Passed 7/1/2016 08/12/2016
Misc
Resolved
08/12/2016
PLUMBING IN WALLS IN COMPLETE AT TIME OF INSPECTION. SCHEDULE WHEN READY.
Gas Piping Inspection - Commercial Passed 7/18/2016 08/12/2016
Misc
Resolved
08/12/2016
GAS PIPING PRESSURE TEST AT A118; A121 OK EXCEPT HIGH GAUGE IN A118 TO BE RE-TESTED BY P.C. TO ENSURE NO LEAKS.
Underslab Plumbing Inspection - Commercial Passed 6/22/2016 08/12/2016
Misc
Resolved
08/12/2016
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN PIPING AT: 3" PVC AT A153 FROM SCIENCE RM A154 TO ~33LF EAST**; 4" PVC AT 156 CONNECTED TO EXSTG 6" @ N END; ROOMS A154; A115; A119; A118; A121 APPROVED TO COVER NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM. **NOTE LESS LENGTH THAN SHOWN ON APPROVED DRAWINGS.
Occupancy Inspection - Fire Passed 8/16/2016 08/16/2016
Alarm Test Passed 8/16/2016 08/16/2016
Final Inspection - Commercial Passed 1/3/2017 1/3/2017 01/03/2017
Misc
Resolved
01/03/2017
GLAZING, WHEN INSTALLED, MUST BE SAFETY GLAZING.
Misc
Resolved
01/03/2017
USE/OCCUPANCY STATUS: OK FOR USE PENDING INSPECTION OF GLAZING WHEN INSTALLED.
Documents & Images
Date Uploaded File Type Document Name
04/04/2016 Letter Codes P/R Corrections Document
04/28/2016 Letter Fire Building Plan Review
04/28/2016 Letter Codes Plan Review Conditions
04/29/2016 Receipt Receipt for transaction: 2016-001423
05/03/2016 Letter Codes Building Permit
06/16/2016 Letter Inspection Summary
06/22/2016 Letter Inspection Summary
07/01/2016 Letter Inspection Summary
07/05/2016 Letter Inspection Summary
07/15/2016 Letter Inspection Summary
07/18/2016 Letter Inspection Summary
07/18/2016 Letter Inspection Summary
07/21/2016 Letter Inspection Summary
07/27/2016 Letter Inspection Summary
08/08/2016 Letter Inspection Summary
08/09/2016 Letter Inspection Summary
08/12/2016 Letter Inspection Summary
01/03/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home