Permit Application Status

PRCOM20160277


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20160277
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DISTRICT NO 7
NEW COMMERCIAL
HIGH SCHOOL AND COLLEGE TECHNOLOGY CAMPUS FOUNDATION PERMIT PRCOM20160069
02/23/2016
05/03/2016
09/05/2016
10/26/2017
Locations
Contacts
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
KANSAS CITY MECHANICAL INC, Address:6822 KANSAS AVE, Phone:(913) 334-1101  
MARK ONE ELECTRIC CO INC, Address:1414 GENESSEE ST, Phone:(816) 842-7023  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
DLR GROUP, Address:7290 W 133RD ST, Phone:(913) 897-7811  
REORGANIZED SCHOOL DISTRICT NO 7, Address:301 NE TUDOR RD  
KRUGER TECHNOLOGIES INC, Address:8271 MELROSE DR, Phone:(913) 498-1114  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 04/07/2016 01/13/2017
Joe Dir
Installation acceptance testing
Corrective Action Required
01/13/2017

2012 IFC 901.5 Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. 901.5.1 Occupancy. It shall be unlawful to occupy any portion of a building or structure until the required fire detection, alarm and suppression systems have been tested and approved. Action required: Call (816) 969-1300 to schedule alarm and fire sprinkler testing. All systems have to be operable before scheduling temporary or final occupancy inspections. For information only.
Sprinkler Plan Review Released for Construction 11/01/2016
Joe Dir
Misc
Corrective Action Required
11/01/2016

ITEMS BELOW WERE DISCUSSED WITH THE PE OF THE PROJECT AND CORRECTIONS ARE BEING MADE TO THE PLANS.
Installation acceptance testing
Corrective Action Required
11/01/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD TESTS AND ACCEPTANCE TESTING OF THE SYSTEM WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Misc
Corrective Action Required
11/01/2016

REPLACE THE ELECTRIC BELL MENTIONED IN THE PLANS WITH A WEATHER PROOF OUTSIDE HORN/STROBE FOR THE WATER FLOW NOTIFICATION DEVICE.
Misc
Corrective Action Required
11/01/2016

INSTALL A CHECK VALVE AT THE BASE OF THE RISER.
Misc
Corrective Action Required
11/01/2016

EXTEND SPRINKLER COVERAGE TO BE UNDER THE STAIRWAYS THROUGHOUT.
Misc
Corrective Action Required
11/01/2016

IFC 2012 903.4 FIRE DEPARTMENT CONNECTION: CONNECTIONS SHALL BE A 4 INCH STORZ TYPE FITTING, INCLUDE A 30 DEGREE ELBOW. LOCATED WITHIN 100 FEET OF A FIRE HYDRANT.
Alarm Plan Review Released for Construction 08/22/2016
Joe Dir
Misc
Corrective Action Required
08/22/2016

THE OUTSIDE HORN/STROBE SHALL BE PROGRAMED TO ACTIVATE ON A WATER FLOW SIGNAL ONLY. (CONFIRMED ON TESTING)
Installation acceptance testing
Corrective Action Required
08/22/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACCEPTANCE TESTING WILL BE REQUIRED FOR THE SYSTEM PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Misc
Corrective Action Required
08/22/2016

BOTH AUDIBLE AND STROBE DEVICES SHALL BE PROGRAMED TO TERMIANTE ON A SILENCE COMMAND FROM THE FACP OR FANN. (CONFIRMED AT TESTING)
Misc
Corrective Action Required
08/22/2016

DUCT DETECTION SHALL BE A SUPERVISORY SIGNAL AT THE FACP/FANN WITH HVAC SHUT DOWN. NO ACTIVATION OF NOTIFICATION DEVICES. (CONFIRMED AT TESTING)
Special Inspections Review Approved 04/13/2016
Mike Weisenborn
Licensed Contractors Approved 03/31/2016 04/13/2016
Mike Weisenborn
LC - General Contractor
Resolved
04/13/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/6/16 - acknowleded in letter
LC - MEP Subs
Resolved
04/13/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/6/16 - acknowleded in letter
Building Plan Review Approved with Conditions 04/07/2016 04/08/2016
Joe Frogge
Final Development Plan
Resolved
04/06/2016

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
03/31/2016

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 4/6/16 - acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
03/31/2016

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 4/6/16 - acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
03/31/2016

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 4/6/16 - acknowledged in letter.
Misc
Resolved
04/13/2016

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 4/6/16 - not yet received
Misc
Resolved
04/06/2016

2012 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Alter all sections, details, and notes that refer to use of plywood and studs to show approved, non-combustible materials or clarify as to which exceptions apply. 4/6/16 - note added specifying that these will be fire retardant treated.
Bldg - Illumination required 1006.1
Resolved
04/08/2016

2012 IBC 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. Action required: Provide emergency lighting at exterior side of all exits. 4/6/16 - Provide at all exterior exits including at east and west sides.
Misc
Resolved
04/06/2016

2011 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: At Elect. Rm 3-161, Level 1, Area C - provide panic hardware on doors 3-161.2 & 3-161.3. Also modify door 3-161.2 to swing outward. 4/6/16 - drawings modified to comply
Misc
Resolved
04/06/2016

1013.4 Opening limitations. Required guards shall not have openings which allow passage of a sphere 4 inches (102 mm) in diameter from the walking surface to the required guard height. Exceptions: 1. From a height of 36 inches (914 mm) to 42 inches (1067 mm), guards shall not have openings which allow passage of a sphere 43/8 inches (111 mm) in diameter. 2. The triangular openings at the open sides of a stair, formed by the riser, tread and bottom rail shall not allow passage of a sphere 6 inches (152 mm) in diameter. 3. At elevated walking surfaces for access to and use of electrical, mechanical or plumbing systems or equipment, guards shall not have openings which allow passage of a sphere 21 inches (533 mm) in diameter. 4. In areas that are not open to the public within occupancies in Group I-3, F, H or S, and for alternating tread devices and ship ladders, guards shall not have openings which allow passage of a sphere 21 inches (533 mm) in diameter. 5. In assembly seating areas, guards at the end of aisles where they terminate at a fascia of boxes, balconies and galleries shall not have openings which allow passage of a sphere 4 inches in diameter (102 mm) up to a height of 26 inches (660 mm). From a height of 26 inches (660 mm) to 42 inches (1067 mm) above the adjacent walking surfaces, guards shall not have openings which allow passage of a sphere 8 inches (203 mm) in diameter. 6. Within individual dwelling units and sleeping units in Group R-2 and R-3 occupancies, guards on the open sides of stairs shall not have openings which allow passage of a sphere 43/8 (111 mm) inches in diameter. Action required: Modify stair guard details, sections, and notes to show compliance with Item #2 above as concerns triangular openings. 4/6/16 - drawings modified to comply
Misc
Resolved
04/06/2016

3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. Exceptions: 1. The emergency sign shall not be required for elevators that are part of an accessible means of egress complying with Section 1007.4.2. The emergency sign shall not be required for elevators that are used for occupant self-evacuation in accordance with Section 3008. Action required: Provide signage at both levels of elevator entrance as noted. 4/6/16 - drawings modified to comply
Plumb - Cleanouts - Building sewer 708.3.2
Resolved
04/06/2016

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Provide additional cleanouts in yard to comply. Coordinate drawing changes with Final Development Plan drawings. 4/6/16 - drawings modified to comply
Misc
Resolved
04/06/2016

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: Provide detail(s) that show how to maintain 2hr fire rating at recessed mechanical equipment. Ref: UH-1 on sheet M1.11 and UH-2 on sheet M1.13. 4/6/16 - drawings modified to comply. One unit moved to non-rated wall. other unit installed in new furred wall.
Bldg - Exits and exit access doorways 1015.1
Resolved
04/08/2016

2012 IBC 1015.1 – Exits or exit access doorways from spaces. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds one of the values in Table 1015.1. 2. The common path of egress travel exceeds one of the limitations of Section 1014.3. 3. Where required by Section 1015.3, 1015.4, 1015.5 or 1015.6. Where a building contains mixed occupancies, each individual occupancy shall comply with the applicable requirements for that occupancy. Where applicable, cumulative occupant loads from adjacent occupancies shall be considered in accordance with the provisions of Section 1004.1. Action required: Provide 2 compliant exits out of Observation Room 1-211 to serve combined load of Testing rooms. Exits shall also comply to 2012 IBC 1015.2.1 (separation), 1011.1 (exit lights), and 1006.3 (emergency lighting). 4/6/16 - provide exit lighting at doors 1-210.1 and 1-210.2. provide emergency lighting in Reception 1-210 and Observation 1-211.
Misc
Resolved
04/08/2016

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: - Provide exit lights at 2nd floor stairs. - Provide exit lights at man doors through movable partitions (multiple locations) - Provide additional directional exit light(s) at lower portion of Nursing Bed Lab areas to make clear that there are two paths. - Door 1-160 out of corridor. (also, this door must swing outwards) - 2 exit lights required out of Control Room 1-155 - Exit light required to lead occupants out of Studio Live Room 1-153. - Exit lights required at both ends of Corridor 4-155 - Exit and emergency lighting required at Shared Reception 1-101.
Misc
Resolved
04/06/2016

Additional information necessary to complete review. Provide the following: - Clarify use of Training rooms 1-224 & 1-219. Depending on how these are used, the occ load may exceed 49. - WON door specifications that include how they will operate during emergency situations without building power. 4/6/16 - clarified and provided
Miscellaneous Correction
Resolved
04/08/2016

2012 IBC 1008.1 Doors. Means of egress doors shall meet the requirements of this section. Doors serving a means of egress system shall meet the requirements of this section and Section 1020.2. Doors provided for egress purposes in numbers greater than required by this code shall meet the requirements of this section. Means of egress doors shall be readily distinguishable from the adjacent construction and finishes such that the doors are easily recognizable as doors. Mirrors or similar reflecting materials shall not be used on means of egress doors. Means of egress doors shall not be concealed by curtains, drapes, decorations or similar materials. Action required: Provide usable and appropriately sized man-doors to be available when WON doors shut. 4/8/16 - WON doors have battery backup with egress buttons
Miscellaneous Correction
Resolved
04/06/2016

2012 IFGC 409.6 Shutoff valve for laboratories. Where provided with two or more fuel gas outlets, including table-, bench- and hood-mounted outlets, each laboratory space in educational, research, commercial and industrial occupancies shall be provided with a single dedicated shutoff valve through which all such gas outlets shall be supplied. The dedicated shutoff valve shall be readily accessible, located within the laboratory space served, located adjacent to the egress door from the space and shall be identified by approved signage stating "Gas Shutoff.” Action required: Provide compliant emergency valves at both lab areas that contain NG piping. 4/6/16 - locations and compliance clarified in letter
Fire Plan Review Approved with Conditions 04/07/2016 04/07/2016
Jim Eden
Misc
Resolved
04/07/2016

[M] 606.1 Scope. Refrigeration systems shall be installed in accordance with the International Mechanical Code. 606.7 Emergency signs. Refrigeration units or systems having a refrigerant circuit containing more than 220 pounds (100 kg) of Group A1 or 30 pounds (14 kg) of any other group refrigerant shall be provided with approved emergency signs, charts and labels in accordance with NFPA 704. Hazard signs shall be in accordance with the International Mechanical Code for the classification of refrigerants listed therein. 606.8 Refrigerant detector. Machinery rooms shall contain a refrigerant detector with an audible and visual alarm. The detector, or a sampling tube that draws air to the detector, shall be located in an area where refrigerant from a leak will concentrate. The alarm shall be actuated at a value not greater than the corresponding TLV-TWA values shown in the International Mechanical Code for the refrigerant classification. Detectors and alarms shall be placed in approved locations. The detector shall transmit a signal to an approved location. 606.9 Remote controls. Where flammable refrigerants are used and compliance with Section 1106 of the International Mechanical Code is required, remote control of the mechanical equipment and appliances located in the machinery room as required by Sections 606.9.1 and 606.9.2 shall be provided at an approved location immediately outside the machinery room and adjacent to its principal entrance. Action required: Provide the quantity of refrigerant on site and SDS .Provide appropriate hazard signage and signage for emergency controls. Show the location of the emergency shut off. Indicate how the refrigerant detection system will interface with the buildings fire alarm system.
Hazardous material identification
Resolved
04/07/2016

407.3 Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 5003.5. For information only. Verified at inspection.
Address numbers required
Resolved
04/07/2016

2012IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required: Verified at inspection.
Knox box required
Resolved
04/07/2016

2012 IFC 506.1 Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. Action required: A Knox box and elevator key box are required. Both items may be ordered online at Knoxbox.com. The knox shall be mounted 6'AFF over the FDC.
Fire protection equipment identification
Resolved
04/07/2016

2012 IFC 509.1 Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location shall be constructed of durable materials, permanently installed and readily visible. 509.1.1 Utility identification. Where required by the fire code official, gas shutoff valves, electric meters, service switches and other utility equipment shall be clearly and legibly marked to identify the unit or space that it serves. Identification shall be made in an approved manner, readily visible and shall be maintained. 509.2 Equipment access. Approved access shall be provided and maintained for all fire protection equipment to permit immediate safe operation and maintenance of such equipment. Storage, trash and other materials or objects shall not be placed or kept in such a manner that would prevent such equipment from being readily accessible. Action required: All rooms containing mechanical and fire protection equipment shall be marked, including stairways to roof mechanical equipment.
Fire-resistant-rated construction - Maintenance
Resolved
04/07/2016

2012 IFC 703.1 Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be visually inspected by the owner annually and properly repaired, restored or replaced when damaged, altered, breached or penetrated. Where concealed, such elements shall not be required to be visually inspected by the owner unless the concealed space is accessible by the removal or movement of a panel, access door, ceiling tile or similar movable entry to the space. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. Verified at inspection
Installation acceptance testing
Corrective Action Required
04/07/2016

2012 IFC 901.5 Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. 901.5.1 Occupancy. It shall be unlawful to occupy any portion of a building or structure until the required fire detection, alarm and suppression systems have been tested and approved. Action required: Call (816) 969-1300 to schedule alarm and fire sprinkler testing. All systems have to be operable before scheduling temporary or final occupancy inspections. For information only.
Portable fire extinguishers - general
Resolved
04/07/2016

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required: Show the locations of extinguishers and extinguisher cabinets.
Misc
Resolved
04/07/2016

2012 IFC 901.2 Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. 901.2.1 Statement of compliance. Before requesting final approval of the installation, where required by the fire code official, the installing contractor shall furnish a written statement to the fire code official that the subject fire protection system has been installed in accordance with approved plans and has been tested in accordance with the manufacturer’s specifications and the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be attached to the written statement. Action required: Provide shop drawings for review and approval.
Misc
Resolved
04/07/2016

2012 IFC 907.1.1 Construction documents. Construction documents for fire alarm systems shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code, the International Building Code, and relevant laws, ordinances, rules and regulations, as determined by the fire code official. Action required: Provide alarm shop drawings. 907.1.2 Fire alarm shop drawings. Shop drawings for fire alarm systems shall be submitted for review and approval prior to system installation, and shall include, but not be limited to, all of the following: 1. A floor plan that indicates the use of all rooms. 2. Locations of alarm-initiating devices. 3. Locations of alarm notification appliances, including candela ratings for visible alarm notification appliances. 4. Location of fire alarm control unit, transponders and notification power supplies. 5. Annunciators. 6. Power connection. 7. Battery calculations. 8. Conductor type and sizes. 9. Voltage drop calculations. 10. Manufacturers’ data sheets indicating model numbers and listing information for equipment, devices and materials. 11. Details of ceiling height and construction. 12. The interface of fire safety control functions. 13. Classification of the supervising station. Action required: Provide alarm shop drawings and specifications for review and approval.
Misc
Resolved
04/07/2016

Clarify the use of the Training Room (1-224). It calculated at 100sqft/person. If used as a classroom room it should be 20sqft./person. or 15sqft/person for tables and chairs. Action required: Recalculate and adjust exiting as needed.
Misc
Resolved
04/07/2016

Clarify if the the use of the Mock Wiring/Storage areas 4-258 and 4-264. Is this a vocational use? Action required: Adjust occupant load based on use.
Misc
Resolved
04/07/2016

Where a building contains mixed occupancies, each individual occupancy shall comply with the applicable requirements for that occupancy. Where applicable, cumulative occupant loads from adjacent occupancies shall be considered in accordance with the provisions of Section 1004.1. Action required: Provide 2 exits out of Observation Room 1-211 to serve combined load of Testing rooms 1-214 and 1-215. Exits shall also comply to 2012 IFC 1015.2.1 (separation), 1011.1 (exit lights), and 1006.3 (emergency lighting).
Misc
Resolved
04/07/2016

2012 IFC [B] 1006.3 Emergency power for illumination.The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604. Action required: Provide emergency lighting at exterior side of all exits.
Misc
Resolved
04/07/2016

2012 IFC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: - Provide exit lights at 2nd floor stairs. - Provide exit lights at man doors through movable partitions (multiple locations). - Provide additional intermediate directional exit light(s) at lower portion of Nursing Bed Lab areas to make clear that there are two paths 3-225 and 3-219. - Door 1-160 out of the corridor. - Two exit lights required out of Control Room 1-155 (Flip the light to the other side of the door between rooms 1-155 and 1-104). - Exit light required to lead occupants out of Studio Live Room 1-153. - Exit lights required at both ends of Corridor 4-155 - Exit and emergency lighting required at Shared Reception 1-101. - Provide an exit sign from 2-205. - Provide exit signage from rooms 1-250 and 1-251. - Provide exit lights in Second Floor of Area A. - Provide intermediate exit signage in corridor 3- 251. - Provide an exit light over the SW door from Engineering Design and Dev. 4-152
Miscellaneous Correction
Resolved
04/07/2016

Provide a NG shut off solenoid valve in room 3-102 in compliance with the IFGC.
Miscellaneous Correction
Resolved
04/07/2016

Provide a specification sheet and ooperation description for the WON doors. Operation of the doors needs to allow some method of opening for egress, or provide a means of egress adjacent to the WON doors.
Misc 12
Resolved
04/07/2016

2012 IFC (Amended) 905.3.1 Height. Class I standpipe systems shall be installed throughout buildings where the floor level of the highest story is located more than two stories above the lowest level of the fire department vehicle access, or where the floor level of the lowest story is located more than two stories below the highest level of fire department vehicle access. Exceptions: 1. Class I standpipes are allowed in buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or 903.3.1.2. 2. Class I manual standpipes are allowed in open parking garages where the highest floor is located not more than 150 feet (45 720 mm) above the lowest level of fire department vehicle access. 3. Class I manual dry standpipes are allowed in open parking garages that are subject to freezing temperatures, provided that the hose connections are located as required for Class II standpipes in accordance with Section 905.5. 4. Class I standpipes are allowed in basements equipped throughout with an automatic sprinkler system. 5. In determining the lowest level of fire department vehicle access, it shall not be required to consider: 5.1. Recessed loading docks for four vehicles or less, and 5.2. Conditions where topography makes access from the fire department vehicle to the building impractical or impossible. 905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations: 1.In every required stairway, a hose connection shall be provided for each floor level above or below grade. Hose connections shall be located at an intermediate floor level landing between floors, unless otherwise approved by the fire code official. 2.On each side of the wall adjacent to the exit opening of a horizontal exit. Exception: Where floor areas adjacent to a horizontal exit are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the horizontal exit. 3.In every exit passageway, at the entrance from the exit passageway to other areas of a building. Exception: Where floor areas adjacent to an exit passageway are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the entrance from the exit passageway to other areas of the building. 4.In covered mall buildings, adjacent to each exterior public entrance to the mall and adjacent to each entrance from an exit passageway or exit corridor to the mall. In open mall buildings, adjacent to each public entrance to the mall at the perimeter line and adjacent to each entrance from an exit passageway or exit corridor to the mall. 5. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3-percent slope), a hose connection shall be located to serve the roof or at the highest landing of a stairway with stair access to the roof provided in accordance with Section 1009.16. 6.Where the most remote portion of a nonsprinklered floor or story is more than 150 feet (45 720 mm) from a hose connection or the most remote portion of a sprinklered floor or story is more than 200 feet (60 960 mm) from a hose connection, the fire code official is authorized to require that additional hose connections be provided in approved locations. Action required: Due to the distance of interior portions of the building from fire access lanes and the addition of a third story for mechanical equipment, Class 1 standpipes (hose valves) shall be provided.
Misc 13
Resolved
04/07/2016

[B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604. Action required: Provide emergency lighting in the following areas: - Emergency lighting in all starways. - Emergency lighting in corridor 1-160. - Emergency lighting in 1-153. - Emergency lighting in chiller room. - Emergency lighting in ththe book store 1-159. - Emergency lighting in 1-165. - Emergency lighting in workshop 4-153. - Emergency lighting in Area A of the second floor.
Misc 14
Resolved
04/07/2016

5001.5.2 Hazardous Materials Inventory Statement (HMIS). Where required by the fire code official , an application for a permit shall include an HMIS, such as Superfund Amendments and Reauthorization Act of 1986 (SARA) Title III, Tier II Report or other approved statement. The HMIS shall include the following information: 1. Product name. 2. Component. 3. Chemical Abstract Service (CAS) number. 4. Location where stored or used. 5. Container size. 6. Hazard classification. 7. Amount in storage. 8. Amount in use-closed systems. 9. Amount in use-open systems. Action required: Provide a Hazardous Materials Inventory Statement for materials to be used in the facility.
Misc 15
Resolved
04/07/2016

2012 IFC [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. Exception: A main exit of a Group A occupancy in compliance with Section 1008.1.9.3, Item 2. Electrical rooms with equipment rated 1,200 amperes or more and over 6 feet (1829 mm) wide that contain overcurrent devices, switching devices or control devices with exit or exit access doors shall be equipped with panic hardware or fire exit hardware. The doors shall swing in the direction of egress travel. Action required: Doors from electrical rooms that exceed 1,200 amperes shall meet this requirement.
Misc 17
Resolved
04/07/2016

2012 IFC [B] 1008.1.9.8  Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public. Action required; For information only. Verified at inspection.
Final Development Plan Review Approved 03/31/2016
Joe Frogge
Fire Plan Review Rejected 03/08/2016 03/08/2016
Jim Eden
Miscellaneous Correction
Corrective Action Required
03/07/2016

Provide a specification sheet and ooperation description for the WON doors. Operation of the doors needs to allow some method of opening for egress, or provide a means of egress adjacent to the WON doors.
Miscellaneous Correction
Corrective Action Required
03/07/2016

Provide a NG shut off solenoid valve in room 3-102 in compliance with the IFGC.
Misc
Corrective Action Required
03/07/2016

2012 IFC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: - Provide exit lights at 2nd floor stairs. - Provide exit lights at man doors through movable partitions (multiple locations). - Provide additional intermediate directional exit light(s) at lower portion of Nursing Bed Lab areas to make clear that there are two paths 3-225 and 3-219. - Door 1-160 out of the corridor. - Two exit lights required out of Control Room 1-155 (Flip the light to the other side of the door between rooms 1-155 and 1-104). - Exit light required to lead occupants out of Studio Live Room 1-153. - Exit lights required at both ends of Corridor 4-155 - Exit and emergency lighting required at Shared Reception 1-101. - Provide an exit sign from 2-205. - Provide exit signage from rooms 1-250 and 1-251. - Provide exit lights in Second Floor of Area A. - Provide intermediate exit signage in corridor 3- 251. - Provide an exit light over the SW door from Engineering Design and Dev. 4-152
Misc
Corrective Action Required
03/07/2016

2012 IFC [B] 1006.3 Emergency power for illumination.The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604. Action required: Provide emergency lighting at exterior side of all exits.
Misc
Corrective Action Required
03/07/2016

Where a building contains mixed occupancies, each individual occupancy shall comply with the applicable requirements for that occupancy. Where applicable, cumulative occupant loads from adjacent occupancies shall be considered in accordance with the provisions of Section 1004.1. Action required: Provide 2 exits out of Observation Room 1-211 to serve combined load of Testing rooms 1-214 and 1-215. Exits shall also comply to 2012 IFC 1015.2.1 (separation), 1011.1 (exit lights), and 1006.3 (emergency lighting).
Misc
Corrective Action Required
03/07/2016

Clarify if the the use of the Mock Wiring/Storage areas 4-258 and 4-264. Is this a vocational use? Action required: Adjust occupant load based on use.
Misc
Corrective Action Required
03/07/2016

Clarify the use of the Training Room (1-224). It calculated at 100sqft/person. If used as a classroom room it should be 20sqft./person. or 15sqft/person for tables and chairs. Action required: Recalculate and adjust exiting as needed.
Misc
Corrective Action Required
03/07/2016

2012 IFC 907.1.1 Construction documents. Construction documents for fire alarm systems shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code, the International Building Code, and relevant laws, ordinances, rules and regulations, as determined by the fire code official. Action required: Provide alarm shop drawings. 907.1.2 Fire alarm shop drawings. Shop drawings for fire alarm systems shall be submitted for review and approval prior to system installation, and shall include, but not be limited to, all of the following: 1. A floor plan that indicates the use of all rooms. 2. Locations of alarm-initiating devices. 3. Locations of alarm notification appliances, including candela ratings for visible alarm notification appliances. 4. Location of fire alarm control unit, transponders and notification power supplies. 5. Annunciators. 6. Power connection. 7. Battery calculations. 8. Conductor type and sizes. 9. Voltage drop calculations. 10. Manufacturers’ data sheets indicating model numbers and listing information for equipment, devices and materials. 11. Details of ceiling height and construction. 12. The interface of fire safety control functions. 13. Classification of the supervising station. Action required: Provide alarm shop drawings and specifications for review and approval.
Misc
Corrective Action Required
03/07/2016

2012 IFC 901.2 Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. 901.2.1 Statement of compliance. Before requesting final approval of the installation, where required by the fire code official, the installing contractor shall furnish a written statement to the fire code official that the subject fire protection system has been installed in accordance with approved plans and has been tested in accordance with the manufacturer’s specifications and the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be attached to the written statement. Action required: Provide shop drawings for review and approval.
Portable fire extinguishers - general
Corrective Action Required
03/07/2016

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required: Show the locations of extinguishers and extinguisher cabinets.
Installation acceptance testing
Corrective Action Required
03/07/2016

2012 IFC 901.5 Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. 901.5.1 Occupancy. It shall be unlawful to occupy any portion of a building or structure until the required fire detection, alarm and suppression systems have been tested and approved. Action required: Call (816) 969-1300 to schedule alarm and fire sprinkler testing. All systems have to be operable before scheduling temporary or final occupancy inspections.
Fire-resistant-rated construction - Maintenance
Corrective Action Required
03/07/2016

2012 IFC 703.1 Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be visually inspected by the owner annually and properly repaired, restored or replaced when damaged, altered, breached or penetrated. Where concealed, such elements shall not be required to be visually inspected by the owner unless the concealed space is accessible by the removal or movement of a panel, access door, ceiling tile or similar movable entry to the space. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. Verified at inspection
Fire protection equipment identification
Corrective Action Required
03/07/2016

2012 IFC 509.1 Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location shall be constructed of durable materials, permanently installed and readily visible. 509.1.1 Utility identification. Where required by the fire code official, gas shutoff valves, electric meters, service switches and other utility equipment shall be clearly and legibly marked to identify the unit or space that it serves. Identification shall be made in an approved manner, readily visible and shall be maintained. 509.2 Equipment access. Approved access shall be provided and maintained for all fire protection equipment to permit immediate safe operation and maintenance of such equipment. Storage, trash and other materials or objects shall not be placed or kept in such a manner that would prevent such equipment from being readily accessible. Action required: All rooms containing mechanical and fire protection equipment shall be marked, including stairways to roof mechanical equipment.
Knox box required
Corrective Action Required
03/07/2016

2012 IFC 506.1 Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. Action required: A Knox box and elevator key box are required. Both items may be ordered online at Knoxbox.com. The knox shall be mounted 6'AFF over the FDC.
Address numbers required
Corrective Action Required
03/07/2016

2012IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required: Verified at inspection.
Hazardous material identification
Corrective Action Required
03/07/2016

407.3 Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 5003.5. For information only. Verified at inspection.
Misc
Corrective Action Required
03/07/2016

[M] 606.1 Scope. Refrigeration systems shall be installed in accordance with the International Mechanical Code. 606.7 Emergency signs. Refrigeration units or systems having a refrigerant circuit containing more than 220 pounds (100 kg) of Group A1 or 30 pounds (14 kg) of any other group refrigerant shall be provided with approved emergency signs, charts and labels in accordance with NFPA 704. Hazard signs shall be in accordance with the International Mechanical Code for the classification of refrigerants listed therein. 606.8 Refrigerant detector. Machinery rooms shall contain a refrigerant detector with an audible and visual alarm. The detector, or a sampling tube that draws air to the detector, shall be located in an area where refrigerant from a leak will concentrate. The alarm shall be actuated at a value not greater than the corresponding TLV-TWA values shown in the International Mechanical Code for the refrigerant classification. Detectors and alarms shall be placed in approved locations. The detector shall transmit a signal to an approved location. 606.9 Remote controls. Where flammable refrigerants are used and compliance with Section 1106 of the International Mechanical Code is required, remote control of the mechanical equipment and appliances located in the machinery room as required by Sections 606.9.1 and 606.9.2 shall be provided at an approved location immediately outside the machinery room and adjacent to its principal entrance. Action required: Provide the quantity of refrigerant on site and SDS .Provide appropriate hazard signage and signage for emergency controls. Show the location of the emergency shut off. Indicate how the refrigerant detection system will interface with the buildings fire alarm system.
Misc 12
Corrective Action Required
03/08/2016

2012 IFC (Amended) 905.3.1 Height. Class I standpipe systems shall be installed throughout buildings where the floor level of the highest story is located more than two stories above the lowest level of the fire department vehicle access, or where the floor level of the lowest story is located more than two stories below the highest level of fire department vehicle access. Exceptions: 1. Class I standpipes are allowed in buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or 903.3.1.2. 2. Class I manual standpipes are allowed in open parking garages where the highest floor is located not more than 150 feet (45 720 mm) above the lowest level of fire department vehicle access. 3. Class I manual dry standpipes are allowed in open parking garages that are subject to freezing temperatures, provided that the hose connections are located as required for Class II standpipes in accordance with Section 905.5. 4. Class I standpipes are allowed in basements equipped throughout with an automatic sprinkler system. 5. In determining the lowest level of fire department vehicle access, it shall not be required to consider: 5.1. Recessed loading docks for four vehicles or less, and 5.2. Conditions where topography makes access from the fire department vehicle to the building impractical or impossible. 905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations: 1.In every required stairway, a hose connection shall be provided for each floor level above or below grade. Hose connections shall be located at an intermediate floor level landing between floors, unless otherwise approved by the fire code official. 2.On each side of the wall adjacent to the exit opening of a horizontal exit. Exception: Where floor areas adjacent to a horizontal exit are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the horizontal exit. 3.In every exit passageway, at the entrance from the exit passageway to other areas of a building. Exception: Where floor areas adjacent to an exit passageway are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the entrance from the exit passageway to other areas of the building. 4.In covered mall buildings, adjacent to each exterior public entrance to the mall and adjacent to each entrance from an exit passageway or exit corridor to the mall. In open mall buildings, adjacent to each public entrance to the mall at the perimeter line and adjacent to each entrance from an exit passageway or exit corridor to the mall. 5. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3-percent slope), a hose connection shall be located to serve the roof or at the highest landing of a stairway with stair access to the roof provided in accordance with Section 1009.16. 6.Where the most remote portion of a nonsprinklered floor or story is more than 150 feet (45 720 mm) from a hose connection or the most remote portion of a sprinklered floor or story is more than 200 feet (60 960 mm) from a hose connection, the fire code official is authorized to require that additional hose connections be provided in approved locations. Action required: Due to the distance of interior portions of the building from fire access lanes and the addition of a third story for mechanical equipment, Class 1 standpipes (hose valves) shall be provided.
Misc 13
Corrective Action Required
03/08/2016

[B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604. Action required: Provide emergency lighting in the following areas: - Emergency lighting in all starways. - Emergency lighting in corridor 1-160. - Emergency lighting in 1-153. - Emergency lighting in chiller room. - Emergency lighting in ththe book store 1-159. - Emergency lighting in 1-165. - Emergency lighting in workshop 4-153. - Emergency lighting in Area A of the second floor.
Misc 14
Corrective Action Required
03/08/2016

5001.5.2 Hazardous Materials Inventory Statement (HMIS). Where required by the fire code official , an application for a permit shall include an HMIS, such as Superfund Amendments and Reauthorization Act of 1986 (SARA) Title III, Tier II Report or other approved statement. The HMIS shall include the following information: 1. Product name. 2. Component. 3. Chemical Abstract Service (CAS) number. 4. Location where stored or used. 5. Container size. 6. Hazard classification. 7. Amount in storage. 8. Amount in use-closed systems. 9. Amount in use-open systems. Action required: Provide a Hazardous Materials Inventory Statement for materials to be used in the facility.
Misc 15
Corrective Action Required
03/08/2016

2012 IFC [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. Exception: A main exit of a Group A occupancy in compliance with Section 1008.1.9.3, Item 2. Electrical rooms with equipment rated 1,200 amperes or more and over 6 feet (1829 mm) wide that contain overcurrent devices, switching devices or control devices with exit or exit access doors shall be equipped with panic hardware or fire exit hardware. The doors shall swing in the direction of egress travel. Action required: Doors from electrical rooms that exceed 1,200 amperes shall meet this requirement.
Misc 17
Corrective Action Required
03/08/2016

2012 IFC [B] 1008.1.9.8  Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public. Action required; For information only. Verified at inspection.
Building Plan Review Rejected 03/08/2016 03/01/2016
Joe Frogge
Final Development Plan
Corrective Action Required
03/02/2016

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
03/02/2016

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
03/02/2016

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
03/02/2016

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
03/02/2016

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
03/02/2016

2012 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Alter all sections, details, and notes that refer to use of plywood and studs to show approved, non-combustible materials or clarify as to which exceptions apply.
Bldg - Illumination required 1006.1
Corrective Action Required
03/02/2016

2012 IBC 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. Action required: Provide emergency lighting at exterior side of all exits.
Misc
Corrective Action Required
03/02/2016

2011 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: At Elect. Rm 3-161, Level 1, Area C - provide panic hardware on doors 3-161.2 & 3-161.3. Also modify door 3-161.2 to swing outward.
Misc
Corrective Action Required
03/02/2016

1013.4 Opening limitations. Required guards shall not have openings which allow passage of a sphere 4 inches (102 mm) in diameter from the walking surface to the required guard height. Exceptions: 1. From a height of 36 inches (914 mm) to 42 inches (1067 mm), guards shall not have openings which allow passage of a sphere 43/8 inches (111 mm) in diameter. 2. The triangular openings at the open sides of a stair, formed by the riser, tread and bottom rail shall not allow passage of a sphere 6 inches (152 mm) in diameter. 3. At elevated walking surfaces for access to and use of electrical, mechanical or plumbing systems or equipment, guards shall not have openings which allow passage of a sphere 21 inches (533 mm) in diameter. 4. In areas that are not open to the public within occupancies in Group I-3, F, H or S, and for alternating tread devices and ship ladders, guards shall not have openings which allow passage of a sphere 21 inches (533 mm) in diameter. 5. In assembly seating areas, guards at the end of aisles where they terminate at a fascia of boxes, balconies and galleries shall not have openings which allow passage of a sphere 4 inches in diameter (102 mm) up to a height of 26 inches (660 mm). From a height of 26 inches (660 mm) to 42 inches (1067 mm) above the adjacent walking surfaces, guards shall not have openings which allow passage of a sphere 8 inches (203 mm) in diameter. 6. Within individual dwelling units and sleeping units in Group R-2 and R-3 occupancies, guards on the open sides of stairs shall not have openings which allow passage of a sphere 43/8 (111 mm) inches in diameter. Action required: Modify stair guard details, sections, and notes to show compliance with Item #2 above as concerns triangular openings.
Misc
Corrective Action Required
03/02/2016

3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. Exceptions: 1. The emergency sign shall not be required for elevators that are part of an accessible means of egress complying with Section 1007.4.2. The emergency sign shall not be required for elevators that are used for occupant self-evacuation in accordance with Section 3008. Action required: Provide signage at both levels of elevator entrance as noted.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
03/02/2016

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Provide additional cleanouts in yard to comply. Coordinate drawing changes with Final Development Plan drawings.
Misc
Corrective Action Required
03/02/2016

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: Provide detail(s) that show how to maintain 2hr fire rating at recessed mechanical equipment. Ref: UH-1 on sheet M1.11 and UH-2 on sheet M1.13.
Bldg - Exits and exit access doorways 1015.1
Corrective Action Required
03/02/2016

2012 IBC 1015.1 – Exits or exit access doorways from spaces. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds one of the values in Table 1015.1. 2. The common path of egress travel exceeds one of the limitations of Section 1014.3. 3. Where required by Section 1015.3, 1015.4, 1015.5 or 1015.6. Where a building contains mixed occupancies, each individual occupancy shall comply with the applicable requirements for that occupancy. Where applicable, cumulative occupant loads from adjacent occupancies shall be considered in accordance with the provisions of Section 1004.1. Action required: Provide 2 compliant exits out of Observation Room 1-211 to serve combined load of Testing rooms. Exits shall also comply to 2012 IBC 1015.2.1 (separation), 1011.1 (exit lights), and 1006.3 (emergency lighting).
Misc
Corrective Action Required
03/02/2016

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: - Provide exit lights at 2nd floor stairs. - Provide exit lights at man doors through movable partitions (multiple locations) - Provide additional directional exit light(s) at lower portion of Nursing Bed Lab areas to make clear that there are two paths. - Door 1-160 out of corridor. (also, this door must swing outwards) - 2 exit lights required out of Control Room 1-155 - Exit light required to lead occupants out of Studio Live Room 1-153. - Exit lights required at both ends of Corridor 4-155 - Exit and emergency lighting required at Shared Reception 1-101.
Misc
Corrective Action Required
03/02/2016

Additional information necessary to complete review. Provide the following: - Clarify use of Training rooms 1-224 & 1-219. Depending on how these are used, the occ load may exceed 49. - WON door specifications that include how they will operate during emergency situations without building power.
Miscellaneous Correction
Corrective Action Required
03/07/2016

2012 IBC 1008.1 Doors. Means of egress doors shall meet the requirements of this section. Doors serving a means of egress system shall meet the requirements of this section and Section 1020.2. Doors provided for egress purposes in numbers greater than required by this code shall meet the requirements of this section. Means of egress doors shall be readily distinguishable from the adjacent construction and finishes such that the doors are easily recognizable as doors. Mirrors or similar reflecting materials shall not be used on means of egress doors. Means of egress doors shall not be concealed by curtains, drapes, decorations or similar materials. Action required: Provide usable and appropriately sized man-doors to be available when WON doors shut.
Miscellaneous Correction
Corrective Action Required
03/07/2016

2012 IFGC 409.6 Shutoff valve for laboratories. Where provided with two or more fuel gas outlets, including table-, bench- and hood-mounted outlets, each laboratory space in educational, research, commercial and industrial occupancies shall be provided with a single dedicated shutoff valve through which all such gas outlets shall be supplied. The dedicated shutoff valve shall be readily accessible, located within the laboratory space served, located adjacent to the egress door from the space and shall be identified by approved signage stating "Gas Shutoff.” Action required: Provide compliant emergency valves at both lab areas that contain NG piping.
Licensed Contractors Rejected 03/08/2016 03/01/2016
Joe Frogge
LC - General Contractor
Corrective Action Required
03/01/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
03/01/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $73,046.65 $73,046.65 Paid 04/29/2016
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 04/29/2016
Water Tap Fee $21,427.00 $21,427.00 Paid 04/29/2016
Water Meter Fee $2,816.73 $2,816.73 Paid 04/29/2016
Right of Way Permit Fee $75.00 $75.00 Paid 04/29/2016
Water Meter Fee $622.02 $622.02 Paid 06/01/2016
$3,438.75
Water Tap Fee $12,856.00 $12,856.00 Paid 06/01/2016
$34,283.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 6/27/2016 06/27/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/27/2016
*STORM SEWER AT THE FOLLOWING LOCATIONS* 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE. TRANSITION TO 8" LINE TO AA LINE.
Underslab Plumbing Inspection - Commercial Partial 7/5/2016 7/5/2016 07/05/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/27/2016
*STORM SEWER AT THE FOLLOWING LOCATIONS* 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE. TRANSITION TO 8" LINE TO AA LINE.
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/05/2016
AREA C: SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP
Underslab Electrical Inspection - Commercial Partial 7/15/2016 07/15/2016
Misc
Partial Correction
07/15/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH;
Underslab Electrical Inspection - Commercial Partial 7/18/2016 07/18/2016
Misc
Partial Correction
07/18/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM;
Underslab Electrical Inspection - Commercial Partial 7/19/2016 7/19/2016 07/19/2016
Misc
Partial Correction
07/15/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH AT SERVER ROOM; TWO 2" PVC CONDUITS FROM PANEL LOCATION IN MECH 1-166 NORTH 50' TO W/I 20' OF (K);
Underslab Plumbing Inspection - Commercial Partial 7/20/2016 7/20/2016 07/20/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/19/2016
*STORM SEWER AT THE FOLLOWING LOCATIONS* 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE. TRANSITION TO 8" LINE TO AA LINE.
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/19/2016
AREA C: SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES;
Underslab Electrical Inspection - Commercial Partial 7/20/2016 7/20/2016 07/20/2016
Misc
Partial Correction
07/19/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25;
Underslab Electrical Inspection - Commercial Partial 7/21/2016 7/21/2016 07/21/2016
Misc
Partial Correction
07/20/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM;
Underslab Plumbing Inspection - Commercial Partial 7/21/2016 07/21/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/20/2016
*STORM SEWER AT THE FOLLOWING LOCATIONS* 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE. TRANSITION TO 8" LINE TO AA LINE.
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/20/2016
AREA C: SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES;
Misc
Partial Correction
07/21/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES IN PROGRESS AT: AREA "A"; AREA "C" SE;
Underslab Electrical Inspection - Commercial Partial 7/22/2016 07/22/2016
Misc
Partial Correction
07/21/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75;
Underslab Plumbing Inspection - Commercial Partial 7/22/2016 07/22/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/21/2016
*STORM SEWER AT THE FOLLOWING LOCATIONS* 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE. TRANSITION TO 8" LINE TO AA LINE.
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/21/2016
AREA C: SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES;
Misc
Partial Correction
07/21/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" IN PROGRESS;
Underslab Electrical Inspection - Commercial Partial 7/26/2016 07/26/2016
Misc
Partial Correction
07/22/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75, THEN WEST BETWEEN (P) & (Q) TO ((5.6);
Underslab Plumbing Inspection - Commercial Partial 7/26/2016 07/26/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/22/2016
*STORM SEWER AT THE FOLLOWING LOCATIONS* 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE. TRANSITION TO 8" LINE TO AA LINE.
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/22/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2;
Misc
Partial Correction
07/22/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" IN PROGRESS S OF (K);
Underslab Electrical Inspection - Commercial Partial 7/28/2016 7/28/2016 07/28/2016
Misc
Partial Correction
07/26/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75, THEN WEST BETWEEN (O) & (Q) TO (5.6); THEN CONTINUING WEST TO (3);
Underslab Plumbing Inspection - Commercial Partial 7/28/2016 07/28/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/26/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM XX/XX TO XX/XX; 10" PVC FROM XX/XX TO XX/XX;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/26/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2;
Misc
Partial Correction
07/26/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" IN PROGRESS S OF (K);
Underslab Electrical Inspection - Commercial Partial 7/29/2016 07/29/2016
Misc
Partial Correction
07/29/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75, THEN WEST BETWEEN (O) & (Q) TO (5.6); SIX 4" THEN CONTINUING WEST TO (3.5); TWO 3" STUBBED UP AT SPACE 2-153A; TWO 3" SWINGING NORTH AT (3.5); TWO 2" TO ABOVE GRADE AT Q/5;
Underslab Plumbing Inspection - Commercial Partial 7/29/2016 07/29/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/28/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/28/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (11.2); 3" PVC ON (11.4) FROM (E.5) TO CONNECTION W/ 4" AT (K.8); 2" PVC BRANCH OFF 3" PVC @ (E.5);
Misc
Partial Correction
07/28/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" IN PROGRESS S OF (K);
Underslab Plumbing Inspection - Commercial Partial 8/3/2016 8/3/2016 08/03/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/29/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/29/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3);
Misc
Partial Correction
07/29/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" COMPLETE N OF (K);
Underslab Plumbing Inspection - Commercial Partial 8/5/2016 8/5/2016 08/05/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/03/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/03/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3);
Misc
Partial Correction
08/03/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" COMPLETE N OF (K);
Underground Electrical Inspection - Commercial Partial 8/8/2016 8/8/2016 08/08/2016
Misc
Partial Correction
08/08/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY;
Underslab Plumbing Inspection - Commercial Partial 8/9/2016 8/8/2016 08/08/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/05/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/05/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3);
Misc
Partial Correction
08/05/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" COMPLETE N OF (K);
Underslab Electrical Inspection - Commercial Partial 8/10/2016 08/10/2016
Misc
Partial Correction
07/29/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75, THEN WEST BETWEEN (O) & (Q) TO (5.6); SIX 4" THEN CONTINUING WEST TO (3.5); TWO 3" STUBBED UP AT SPACE 2-153A; TWO 3" SWINGING NORTH AT (3.5); TWO 2" TO ABOVE GRADE AT Q/5; TWO 3" CONTINUING NW FROM (O/3.5) TO THRU GRADE BEAM AT (2/H.5);
Underslab Electrical Inspection - Commercial Partial 8/12/2016 8/12/2016 08/12/2016
Misc
Partial Correction
08/10/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75, THEN WEST BETWEEN (O) & (Q) TO (5.6); SIX 4" THEN CONTINUING WEST TO (3.5); TWO 3" STUBBED UP AT SPACE 2-153A; TWO 3" SWINGING NORTH AT (3.5); TWO 2" TO ABOVE GRADE AT Q/5; TWO 3" CONTINUING NW FROM (O/3.5) TO THRU GRADE BEAM AT (2/H.5); SIX 4" BETWEEN (O) & (Q) EXTENDING WEST FROM (3.5)THROUGH GRADE BEAM AT (2); FOUR 2" ON (H.6) FROM (11.6) TO (10.3);
Underslab Plumbing Inspection - Commercial Not Ready 8/12/2016 8/12/2016 08/12/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/08/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/08/2016
SANITARY WASTE AND VENT 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3);
Misc
Partial Correction
08/08/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" COMPLETE N OF (K);
Misc
Corrective Action Required
08/12/2016
LOCATION UNKNOWN
Underslab Plumbing Inspection - Commercial Partial 8/15/2016 8/15/2016 08/15/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/12/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/12/2016
OK TO COVER WHEN READY SANITARY WASTE AND VENT: AREA "A" COMPLETE; 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3); 2" THEN 4" PVC FROM F/9.5 TO K.8/9.3 TO K.8/10.3; 2" THEN 3" THEN 4" PVC FROM Y.5/3.7 TO T.5/3.9 TO T.5/6.5;
Misc
Resolved
08/15/2016
OK TO COVER WHEN READY UNDER-SLAB DRAIN LINES AT: AREA "A" COMPLETE; AREA "C" COMPLETE N OF (K);
Underground Electrical Inspection - Commercial Partial 8/16/2016 8/16/2016 08/16/2016
Misc
Partial Correction
08/08/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2);
Underground Electrical Inspection - Commercial Partial 8/17/2016 8/17/2016 08/17/2016
Misc
Partial Correction
08/16/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2); THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Underground Electrical Inspection - Commercial Partial 8/18/2016 08/18/2016
Misc
Partial Correction
08/17/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2); THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
08/18/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3 TO;
Underslab Plumbing Inspection - Commercial Partial 8/19/2016 8/19/2016 08/19/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/15/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/15/2016
OK TO COVER WHEN READY PVC DWV PIPING: AREA "A" COMPLETE; 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3); 2" THEN 4" PVC FROM F/9.5 TO K.8/9.3 TO K.8/10.3; 2" THEN 3" THEN 4" PVC FROM Y.5/3.7 TO T.5/3.9 TO T.5/6.5; 4" FROM F.2/9.6 TO F.2/2.8 + 2" BRANCH FROM F/9.1 TO F.2/9.1 + 2" BRANCH FROM B/6.8 TO F.2/6.8 + 4" W.C. BRANCH @ F.2/6.8;
Underground Electrical Inspection - Commercial Not Ready 8/23/2016 8/23/2016 08/23/2016
Misc
Partial Correction
08/18/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2); THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
08/18/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3 TO;
Underslab Electrical Inspection - Commercial Partial 8/23/2016 8/23/2016 08/23/2016
Misc
Partial Correction
08/12/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: THREE 4" PVC CONDUITS UNDER GRADE BEAM AT DD/13.2 TO 80' NORTH; THREE 4" + TWO 1-1/2" PVC CONDUITS EXTENDED N TO SERVER RM; SIX 3" + ONE 1-1/4" FROM SERVER RM SW TO ~T/11, THEN TWO 3" S TO Z/10.25; THREE 1-1/2" PVC FROM SERVER RM TO WALL PENETRATIONS AT K/13.5; TWO 2" PVC FROM WALL PENETRATIONS AT K/13.5 TO SW -- SWEEPING TO WEST N OF SERVER RM; ALL CONDUITS IN VICINITY OF M/13.5 IN PLACE AND INSPECTED INCLUDING CONNECTIONS AT WALL PENETRATIONS AT K/13.5 OK TO COVER WHEN READY; TWO 2" CONTINUING + SIX 4" & FOUR 3" PVC FROM SERVER RM WEST TO O.1/10.75, THEN WEST BETWEEN (O) & (Q) TO (5.6); SIX 4" THEN CONTINUING WEST TO (3.5); TWO 3" STUBBED UP AT SPACE 2-153A; TWO 3" SWINGING NORTH AT (3.5); TWO 2" TO ABOVE GRADE AT Q/5; TWO 3" CONTINUING NW FROM (O/3.5) TO THRU GRADE BEAM AT (2/H.5); SIX 4" BETWEEN (O) & (Q) EXTENDING WEST FROM (3.5)THROUGH GRADE BEAM AT (2); FOUR 2" ON (H.6) FROM (11.6) TO (10.3), (10.3) to (4.9); ONE 2", ONE 1", ONE 3/4" PVC FROM BB/3.3 TO U/2.3;
Underslab Plumbing Inspection - Commercial Partial 8/24/2016 8/24/2016 08/24/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/19/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/19/2016
OK TO COVER WHEN READY PVC DWV PIPING: AREA "A" COMPLETE; 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3); 2" THEN 4" PVC FROM F/9.5 TO K.8/9.3 TO K.8/10.3; 2" THEN 3" THEN 4" PVC FROM Y.5/3.7 TO T.5/3.9 TO T.5/6.5; 4" FROM F.2/9.6 TO F.2/2.8 + 2" BRANCH FROM F/9.1 TO F.2/9.1 + 2" BRANCH FROM B/6.8 TO F.2/6.8 + 4" W.C. BRANCH @ F.2/6.8;
Misc
Partial Correction
08/24/2016
UNDER-DRAIN PIPING OK TO COVER AT: AREA "A", "C"; "B" & "D" IN PROGRESS;
Underslab Electrical Inspection - Commercial Partial 8/25/2016 8/25/2016 08/25/2016
Misc
Partial Correction
08/23/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP THROUGHOUT EXCEPT TWO 3" YET TO BE COMPLETED AT AREA "B" NEAR (Q)
Underslab Plumbing Inspection - Commercial Partial 8/25/2016 08/25/2016
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/24/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/24/2016
OK TO COVER WHEN READY PVC DWV PIPING: AREA "A" COMPLETE; 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3); 2" THEN 4" PVC FROM F/9.5 TO K.8/9.3 TO K.8/10.3; 2" THEN 3" THEN 4" PVC FROM Y.5/3.7 TO T.5/3.9 TO T.5/6.5; 4" FROM F.2/9.6 TO F.2/2.8 + 2" BRANCH FROM F/9.1 TO F.2/9.1 + 2" BRANCH FROM B/6.8 TO F.2/6.8 + 4" W.C. BRANCH @ F.2/6.8;
Misc
Partial Correction
08/24/2016
UNDER-DRAIN PIPING OK TO COVER AT: AREA "A", "C"; "B" & "D" IN PROGRESS;
Underslab Electrical Inspection - Commercial Partial 8/26/2016 08/26/2016
Misc
Partial Correction
08/26/2016
NO ISSUES FOUND ON TRENCHED UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP THROUGHOUT INCLUDING TWO 3" NOW COMPLETED AT AREA "B" CENTER NEAR (BB)
Underslab Plumbing Inspection - Commercial Passed 8/30/2016 8/30/2016 08/30/2016
THE FOLLOWING AREAS ARE APPROVED
Resolved
08/30/2016
STORM SEWER AT THE FOLLOWING LOCATIONS: 12" STORM LINE AT 15 LINE SLOPING EAST BETWEEN O AND R TO 10.5 LINE; TRANSITION TO 8" LINE TO AA LINE; 8" PVC LINE FROM E.2/11.5 TO E.2/9.3; 10" PVC FROM E.2/9.3 TO K.2/9.3; 10" & 8" PVC FROM W.8/4 TO W.8/3.4 TO X.1/3.4 TO RISER @ X.1/2; 8" PVC FROM 4.8/B.8 4.8/H.2; 6" PVC FROM H.2/5.2 TO 4.7/H.2; 10" PVC FROM H.2/4.7 TO {TWO 4" C.O.s} H.2/2.6 TO 2.6/L TO UNDER G.B. TO 5' O/S B/L @ L/2; 6" PVC FROM G/6 & J/6 CONVERGING @ H.2/5.6 AND CONNECTING TO PREVIOUS RUN AT H.2/5.2;
THE FOLLOWING AREAS ARE APPROVED
Resolved
08/30/2016
OK TO COVER WHEN READY PVC DWV PIPING: AREA "A" COMPLETE; 2 INCH TO 4 INCH AT W LINE TO 10 LINE WITH BATH GROUP; 6" PVC ON (K.8) FROM (11.6) TO (14) + FIVE BRANCHES; 4" PVC FROM T.5/9.2 TO T.5/5.6 TO N.2/5.6 TO N.2/4.2; 6" PVC ON (K.8) FROM (11.6) TO (10.3) + 4" BRANCH SOUTH AT (10.3); 2" THEN 4" PVC FROM F/9.5 TO K.8/9.3 TO K.8/10.3; 2" THEN 3" THEN 4" PVC FROM Y.5/3.7 TO T.5/3.9 TO T.5/6.5; 4" FROM F.2/9.6 TO F.2/2.8 + 2" BRANCH FROM F/9.1 TO F.2/9.1 + 2" BRANCH FROM B/6.8 TO F.2/6.8 + 4" W.C. BRANCH @ F.2/6.8;
Misc
Resolved
08/30/2016
UNDER-DRAIN PIPING OK TO COVER AT: AREA "A", "C"; "B" & "D" IN PROGRESS;
Underground Electrical Inspection - Commercial Partial 8/30/2016 8/30/2016 08/30/2016
Misc
Partial Correction
08/23/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
08/23/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3 TO;
Underground Electrical Inspection - Commercial Partial 9/6/2016 9/6/2016 09/06/2016
Misc
Partial Correction
08/30/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
08/30/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3 TO;
Misc
Partial Correction
09/06/2016
6 FOUR INCH CONDUIT FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT. MIKE COPELAND 09/06/2016 1:42 PM
Underground Electrical Inspection - Commercial Partial 9/12/2016 9/12/2016 09/12/2016
Misc
Partial Correction
09/06/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
09/06/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3 TO;
Misc
Partial Correction
09/06/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Underground Electrical Inspection - Commercial Partial 9/15/2016 9/15/2016 09/15/2016
Misc
Partial Correction
09/12/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
09/12/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6;
Misc
Partial Correction
09/12/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Underground Electrical Inspection - Commercial Partial 9/23/2016 9/23/2016 09/23/2016
Misc
Partial Correction
09/15/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200';
Misc
Partial Correction
09/15/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10;
Misc
Partial Correction
09/15/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Electrical Service Inspection Partial 9/29/2016 9/29/2016 09/29/2016
Misc
Partial Correction
09/29/2016
NO DRAWING REFERENCE FOUND FOR GROUND RING AT TRANSFORMER PAD. IF COVER, AT RISK.
Underground Electrical Inspection - Commercial Partial 9/30/2016 9/30/2016 09/30/2016
Misc
Partial Correction
09/23/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER;
Misc
Partial Correction
09/23/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10;
Misc
Partial Correction
09/23/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
09/30/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Suspended Slab Inspection Partial 10/4/2016 10/04/2016
Underground Electrical Inspection - Commercial Partial 10/7/2016 10/7/2016 10/07/2016
Misc
Partial Correction
09/30/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TO #11;
Misc
Partial Correction
09/30/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
09/30/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER;
Misc
Partial Correction
09/30/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/11/2016 10/11/2016 10/11/2016
Misc
Partial Correction
10/07/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12;
Misc
Partial Correction
10/07/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/07/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER;
Misc
Partial Correction
10/07/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/14/2016 10/14/2016 10/14/2016
Misc
Partial Correction
10/11/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14;
Misc
Partial Correction
10/11/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/11/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER;
Misc
Partial Correction
10/11/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/17/2016 10/17/2016 10/17/2016
Misc
Partial Correction
10/14/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14;
Misc
Partial Correction
10/14/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/14/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3;
Misc
Partial Correction
10/14/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/18/2016 10/18/2016 10/18/2016
Misc
Partial Correction
10/17/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14;
Misc
Partial Correction
10/17/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/17/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Partial Correction
10/17/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/19/2016 10/19/2016 10/19/2016
Misc
Partial Correction
10/18/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7;
Misc
Partial Correction
10/18/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/18/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Partial Correction
10/18/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/20/2016 10/20/2016 10/20/2016
Misc
Partial Correction
10/19/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15;
Misc
Partial Correction
10/19/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/19/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Partial Correction
10/19/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/25/2016 10/25/2016 10/25/2016
Misc
Partial Correction
10/20/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22 APPROVED
Misc
Partial Correction
10/20/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/20/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Partial Correction
10/20/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 10/28/2016 10/28/2016 10/28/2016
Misc
Partial Correction
10/25/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
10/25/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/25/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Partial Correction
10/25/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 11/1/2016 11/1/2016 11/01/2016
Misc
Partial Correction
10/28/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
10/28/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
10/28/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; ADDITIONAL 120' EXTENDED TO SOUTH TOWARD BOX NEAR NEW RAILROAD BRIDGE; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Partial Correction
10/28/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
Underground Electrical Inspection - Commercial Partial 11/2/2016 11/2/2016 11/02/2016
Misc
Partial Correction
11/01/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Resolved
11/02/2016
6 FOUR-INCH CONDUITS FOR 50' WEST OF DRIVE TO ABOUT 10 FEET FROM VAULT; 6 FOUR-INCH CONDUITS EXTENDED WEST TO ENTRY TO QUAZITE VAULT NEAR INNOVATION PKWY
Misc
Partial Correction
11/01/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM LOCATION OF QUAZITE BOX ES3 TO SOUTH 200'; ADDITIONAL 120' EXTENDED TO SOUTH TOWARD BOX NEAR NEW RAILROAD BRIDGE; ADDITIONAL 120' EXTENDED TO SOUTH; QUAZITE BOX ES3 SET IN PLACE + THREE 4" PVC CONDUITS FROM BOX 10' SOUTH CONNECTED TO CONDUITS TO SOUTH BURIED EARLIER; QUAZITE BOX ES3; THREE 4" + ONE 1-1/2" PVC CONDUIT FROM GRADE BEAM @ DD/13.2 TO 40' SOUTH TOWARD QUAZITE BOX ES3; SAME THREE 4" CONDUITS EXTENDED SOUTH TO ES3; SAME 1-1/2" CONDUIT + ONE 1" CONDUIT EXTENDED TO 8' FROM ES3 WHERE SMALLER QUAZITE BOX IS TO BE INSTALLED;
Misc
Resolved
11/02/2016
GROUND RING INSTALLED IN TRENCH AROUND TRANSFORMER PAD NOT SHOWN ON DRAWINGS. NO MATERIAL OR WORKMANSHIP ISSUES FOUND.
In-wall Inspection Partial 11/4/2016 11/4/2016 11/04/2016
Misc
Partial Correction
11/04/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: EAST WALL OF ELECT 3-161;
Electrical Service Inspection Passed 11/17/2016 11/17/2016 11/17/2016
Misc
Partial Correction
09/29/2016
Underground Electrical Inspection - Commercial Partial 11/17/2016 11/17/2016 11/17/2016
Misc
Partial Correction
11/02/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
11/02/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
In-wall Inspection Partial 11/30/2016 11/30/2016 11/30/2016
Misc
Partial Correction
11/04/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: EAST WALL OF ELECT 3-161;
Suspended Slab Inspection Passed 12/1/2016 12/01/2016
Underground Electrical Inspection - Commercial Partial 12/2/2016 12/2/2016 12/02/2016
Misc
Partial Correction
11/17/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
11/17/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/02/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #15; #16; #20;
Underground Electrical Inspection - Commercial Partial 12/5/2016 12/5/2016 12/05/2016
Misc
Partial Correction
12/02/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
12/02/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/02/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #15; #16; #21; #17 thru #20; #22;
Underground Electrical Inspection - Commercial Partial 12/6/2016 12/6/2016 12/06/2016
Misc
Partial Correction
12/05/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
12/05/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/05/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #15; #16; #21; #17 thru #20; #22; #26;
Underground Electrical Inspection - Commercial Partial 12/7/2016 12/7/2016 12/07/2016
Misc
Partial Correction
12/06/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
12/06/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/06/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #15; #16; #21; #17 thru #20; #22; #26; #1; #2; #3; #4; #5; #7;
Underground Electrical Inspection - Commercial Partial 12/13/2016 12/13/2016 12/13/2016
Misc
Partial Correction
12/07/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
12/07/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/07/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #15; #16; #21; #17 thru #20; #22; #26; #1; #2; #3; #4; #5; #7; #10; #25;
Underground Electrical Inspection - Commercial Partial 12/13/2016 12/13/2016
Misc
Partial Correction
12/13/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Misc
Partial Correction
12/13/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/13/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #15; #16; #21; #17 thru #20; #22; #26; #1; #2; #3; #4; #5; #7; #10; #25; #6; #8; #9;#11;
Underground Electrical Inspection - Commercial Partial 12/15/2016 12/15/2016 12/15/2016
Misc
Resolved
12/15/2016
OK TO COVER WHEN READY: TWELVE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; SIX 4" PVC BETWEEN (O) & (Q) EXTENDING 20' WEST FROM GRADE BEAM AT (2) + ADDITIONAL 40' WEST; THREE 4" PVC FROM QUAZITE BOX ES3 SOUTH COMPLETE TO QUAZITE BOX NEAR NEW BRIDGE OVER RAILROAD TRACKS
Misc
Partial Correction
12/13/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1; #2; #3; #4; #5; #6; #7; #8; #9; #10; #12; #15; #16; #17 thru #20; #21; #22; #25; #26; [#11; #13; #14; #24;
Misc
Partial Correction
12/13/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Underground Electrical Inspection - Commercial Partial 12/20/2016 12/20/2016 12/20/2016
Misc
Partial Correction
12/15/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1; #2; #3; #4; #5; #6; #7; #8; #9; #10; #11; #12; #13; #14; #15; #16; #17 thru #20; #21; #22; #24; #25; #26;
Misc
Resolved
12/20/2016
OK TO COVER WHEN READY INSTALLATION OF BURIED SITE LIGHTING ELECTRICAL CONDUIT FOLLOWING SEGMENTS: FROM LOCATION OF LP BASE #1 TO #2 TO #3; #5 TO #6; #3 TO #4 TO #5; #6 TO #10; #10 TOWARD #11; COMPLETE TO #11 TO #12; #12 TO #13 TO #14; #1 TO [ES3] TO #27 TO 12" x 20" QUAZITE BOX & TO #26 TO #9 TO #8 TO #7; #14 TO #15; #15 THROUGH #22; #22 TO #23 TO #24 TO #25;
Underground Electrical Inspection - Commercial Partial 12/20/2016 12/20/2016
Misc
Partial Correction
12/20/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1; #2; #3; #4; #5; #6; #7; #8; #9; #10; #11; #12; #13; #14; #15; #16; #17 thru #20; #21; #22; #24; #25; #26; GROUND RODS DRIVEN AND G.E.C.s BEING TERMINATED; WHEREVER RODS ARE DRIVEN TO REFUSAL OK TO LAY RODS OVER HORIZONTAL WITH MINIMUM 24" FINISH COVER
Gas Piping Inspection - Commercial Partial 12/29/2016 12/29/2016
Misc
Partial Correction
12/29/2016
NO ISSUES FOUND ON VISUAL INSPECTION OF 3" GAS PIPE FROM BUILDING ENTRY TO MEZZANINE. P.C. HAS PRESSURE TEST IN PROGRESS ON 3" LINE ONLY.
Rough Framing Inspection - Commercial Partial 12/30/2016 1/3/2017 01/03/2017
Misc
Partial Correction
01/03/2017
INSPECTION OF EXTERIOR WALL FRAMING IN PROGRESS
In-wall Inspection Not Ready 1/4/2017 1/4/2017 01/04/2017
Misc
Partial Correction
11/30/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS AT RISK; BOCA PLATES NOT IN USE TO PROTECT PVC & COPPER PIPE AT BOTTOM TRACKS; INSPECTION SUSPENDED AWAITING CORRECTIONS
In-wall Inspection Partial 1/10/2017 1/10/2017 01/10/2017
Misc
Partial Correction
01/04/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" SOUTH OF MAIN STAIRS;
Rough Framing Inspection - Commercial Partial 1/11/2017 1/11/2017 01/11/2017
Misc
Partial Correction
01/03/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION;
Rough Framing Inspection - Commercial Partial 1/26/2017 1/26/2017 01/26/2017
Misc
Partial Correction
01/11/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION;
Misc
Partial Correction
01/26/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE OK TO COVER WHEN READY EXCEPT A/E CLARIFICATION REQUIRED RE DEFLECTION CLIP SCREWS AT LOCATIONS WITH NON-STRUCTURAL HEADERS BELOW
Footing Inspection - Commercial Passed 1/31/2017 (8:00) 1/31/2017 01/31/2017
Rough Framing Inspection - Commercial Partial 2/1/2017 2/1/2017 02/01/2017
Misc
Partial Correction
01/26/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION; EAST ELEVATION
Misc
Partial Correction
01/26/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE -- DEFLECTION CLIP SCREWS TO BE VERIFIED
Rough Framing Inspection - Commercial Partial 2/2/2017 02/02/2017
Misc
Partial Correction
02/01/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION; EAST ELEVATION
Misc
Partial Correction
02/01/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE -- DEFLECTION CLIP SCREWS VERIFIED
In-wall Inspection Partial 2/2/2017 02/02/2017
Misc
Partial Correction
01/10/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; ENSURE LEVEL-TO-LEVEL FLOOR OPENINGS ARE FIRESTOPPED BEFORE COVERING WALLS
In-wall Inspection Partial 2/8/2017 02/08/2017
Misc
Partial Correction
02/02/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; ENSURE LEVEL-TO-LEVEL FLOOR OPENINGS ARE FIRESTOPPED BEFORE COVERING WALLS
Misc
Partial Correction
02/08/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271;
Gas Piping Inspection - Commercial Partial 2/14/2017 2/14/2017 02/14/2017
Misc
Partial Correction
12/29/2016
NO ISSUES FOUND ON VISUAL INSPECTION OF 3" GAS PIPE FROM BUILDING ENTRY TO MEZZANINE. P.C. PRESSURE-TESTED 3" LINE; CUMULATIVE PRESSURE TEST OF 3" LINE + SUPPLY TO MED LABS C102 & C103;
In-wall Inspection Partial 2/14/2017 02/14/2017
Misc
Partial Correction
02/08/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; ENSURE LEVEL-TO-LEVEL FLOOR OPENINGS ARE FIRESTOPPED BEFORE COVERING WALLS
Misc
Partial Correction
02/08/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271;
Rated Assembly Inspection Partial 2/14/2017 02/14/2017
Misc
Partial Correction
02/14/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL;
Rated Assembly Inspection Partial 2/21/2017 2/21/2017 02/21/2017
Misc
Partial Correction
02/14/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL;
Misc
Partial Correction
02/21/2017
ELEVATOR SHAFT: LINER BOARD AT 2ND FLOOR EAST WALL;
Rated Assembly Inspection Not Ready 2/23/2017 2/23/2017 02/23/2017
Misc
Partial Correction
02/21/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL;
Misc
Partial Correction
02/21/2017
ELEVATOR SHAFT: LINER BOARD AT 2ND FLOOR EAST WALL;
In-wall Inspection Partial 2/27/2017 2/27/2017 02/27/2017
Misc
Partial Correction
02/14/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: 1ST FLOOR: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; 2ND FLOOR: AREA "A"; AREA "C" N OF STAIR;
Misc
Partial Correction
02/14/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271;
Rated Assembly Inspection Partial 2/27/2017 02/27/2017
Misc
Partial Correction
02/23/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL (GWB AT TOP OF WALL NOT FASTENED TIGHT AT WF BEAM);
Misc
Partial Correction
02/23/2017
ELEVATOR SHAFT: OK TO COVER LINER BOARD AT 2ND FLOOR EAST WALL;
Rated Assembly Inspection Partial 3/1/2017 3/1/2017 03/01/2017
Misc
Partial Correction
02/27/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X;
Misc
Partial Correction
02/27/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X;
Above Ceiling Inspection Partial 3/1/2017 03/01/2017
Misc
Partial Correction
03/01/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151;
In-wall Inspection Partial 3/1/2017 03/01/2017
Misc
Partial Correction
02/27/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A;
Misc
Partial Correction
02/27/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR;
Rated Assembly Inspection Partial 3/3/2017 03/03/2017
Misc
Partial Correction
03/01/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 2ST LAYER 5/8" TYPE X GWB AT CEILING;
Misc
Partial Correction
03/01/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS;
Misc
Partial Correction
03/03/2017
2ND FLOOR SEPARATION WALL ON (6) FROM (N) TO (Q) WEST FACE 1ST LAYER 5/8" TYPE X GWB OK FOR 2ND LAYER;
Rated Assembly Inspection Partial 3/7/2017 3/7/2017 03/07/2017
Misc
Partial Correction
03/03/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 2ST LAYER 5/8" TYPE X GWB AT CEILING; ::NORTH, SOUTH, EAST WALLS 1ST 2ND FLOOR ELEVATOR, ELEVATOR EQUIPMENT ROOM CEILING 2ND LAYER.
Misc
Partial Correction
03/03/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB;
Misc
Partial Correction
03/03/2017
2ND FLOOR SEPARATION WALL ON (6) FROM (N) TO (Q) WEST FACE 1ST LAYER 5/8" TYPE X GWB OK FOR 2ND LAYER;
Rated Assembly Inspection Partial 3/9/2017 3/9/2017 03/09/2017
Misc
Partial Correction
03/03/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
Misc
Partial Correction
03/03/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS;
Misc
Partial Correction
03/03/2017
2ND FLOOR SEPARATION WALL ON (6) FROM (N) TO (Q) WEST FACE 1ST LAYER 5/8" TYPE X GWB OK FOR 2ND LAYER;
Misc
Partial Correction
03/09/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
Above Ceiling Inspection Partial 03/09/2017
Misc
Partial Correction
03/01/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156
In-wall Inspection Partial 3/10/2017 3/10/2017 03/10/2017
Misc
Partial Correction
03/01/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A;
Misc
Partial Correction
03/01/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Rated Assembly Inspection Partial 3/15/2017 3/15/2017 03/15/2017
Misc
Partial Correction
03/09/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
Misc
Partial Correction
03/09/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS;
Misc
Partial Correction
03/09/2017
SEPARATION WALL ON (6): PENETRATIONS OF LINER BOARD FIRE-STOPPED; OK TO HANG 5/8" TYPE X GWB BOTH FACES;
Misc
Partial Correction
03/09/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
In-wall Inspection Partial 3/15/2017 03/15/2017
Misc
Partial Correction
03/10/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A;
Misc
Partial Correction
03/10/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
In-wall Inspection Partial 3/17/2017 3/17/2017 03/17/2017
Misc
Partial Correction
03/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162;
In-wall Inspection Partial 3/22/2017 3/22/2017 03/22/2017
Misc
Partial Correction
03/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162;
Misc
Partial Correction
03/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
In-wall Inspection Partial 3/23/2017 3/23/2017 03/23/2017
Misc
Partial Correction
03/22/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/22/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162;
Misc
Partial Correction
03/22/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
Gas Piping Inspection - Commercial Partial 3/24/2017 3/24/2017 03/24/2017
Misc
Partial Correction
02/14/2017
NO ISSUES FOUND ON VISUAL INSPECTION OF 3" GAS PIPE FROM BUILDING ENTRY TO MEZZANINE. P.C. PRESSURE-TESTED 3" LINE; CUMULATIVE PRESSURE TEST OF 3" LINE + SUPPLY TO MED LABS C102 & C103; VISUAL + PRESSURE TEST OF COMPLETE PIPING SYSTEM EXCEPT AT WATER HEATERS AND BOILERS
In-wall Inspection Partial 3/24/2017 03/24/2017
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A"; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157;
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
In-wall Inspection Partial 3/29/2017 3/29/2017 03/29/2017
Misc
Partial Correction
03/24/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/24/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103;
Misc
Partial Correction
03/24/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
Above Ceiling Inspection Partial 3/29/2017 03/29/2017
Misc
Partial Correction
03/09/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259;
Rough Framing Inspection - Commercial Partial 3/29/2017 03/29/2017
Misc
Partial Correction
02/02/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION; EAST ELEVATION
Misc
Partial Correction
02/02/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE -- DEFLECTION CLIP SCREWS VERIFIED
Misc
Partial Correction
03/29/2017
NO ISSUES FOUND WITH INSTALLATION OF 16 GA. STEEL JOISTS FOR MECHANICAL DECKS ABOVE SPACES: D255; D258; D258A; D259; D260; D264
Rough Framing Inspection - Commercial Partial 3/31/2017 3/31/2017 03/31/2017
Misc
Partial Correction
03/29/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE -- DEFLECTION CLIP SCREWS VERIFIED
Misc
Partial Correction
03/29/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION; EAST ELEVATION
Misc
Partial Correction
03/29/2017
NO ISSUES FOUND WITH INSTALLATION OF 16 GA. STEEL JOISTS FOR MECHANICAL DECKS ABOVE SPACES: D255; D258; D258A; D259; D260; D264
Misc
Partial Correction
03/31/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: ON 1ST FLOOR AT 10.25/W-Y AND 10.75/J-L;
Rated Assembly Inspection Partial 4/4/2017 04/04/2017
Misc
Partial Correction
03/15/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
Misc
Partial Correction
03/15/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS;
Misc
Partial Correction
03/15/2017
SEPARATION WALL ON (6): INNER WYTHE: PENETRATIONS OF LINER BOARD FIRE-STOPPED; OK TO HANG 5/8" TYPE X GWB BOTH FACES; OUTER WYTHE: 1ST FLOOR FROM N TO R WEST FACE; OUTER WYTHE: 2ND FLOOR FROM J TO N WEST FACE;
Misc
Partial Correction
03/15/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
Rated Assembly Inspection Partial 4/6/2017 04/06/2017
Misc
Partial Correction
04/04/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
Misc
Partial Correction
04/04/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS;
Misc
Partial Correction
04/04/2017
SEPARATION WALL ON (6): INNER WYTHE: PENETRATIONS OF LINER BOARD FIRE-STOPPED; OK TO HANG 5/8" TYPE X GWB BOTH FACES; OUTER WYTHE: 1ST FLOOR FROM N TO R WEST FACE; OUTER WYTHE: 2ND FLOOR FROM J TO N WEST FACE; WEST FINISH FACE: OK TO HANG 1ST LAYER TO 12' AFF FROM B TO WEST FINISH FACE: OK TO HANG ONE LAYER FULL HEIGHT TO 2ND FLR ELEVATION FROM F TO N + FROM U TO 8' SHORT OF BB; EAST FINISH FACE OK TO HANG ONE LAYER FULL HEIGHT FROM NEAR A TO BB
Misc
Partial Correction
04/04/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
Rough Framing Inspection - Commercial Partial 4/4/2017 4/6/2017 04/06/2017
Misc
Partial Correction
03/31/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE -- DEFLECTION CLIP SCREWS VERIFIED
Misc
Partial Correction
03/31/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION; EAST ELEVATION
Misc
Partial Correction
03/31/2017
NO ISSUES FOUND WITH INSTALLATION OF 16 GA. STEEL JOISTS FOR MECHANICAL DECKS ABOVE SPACES: D255; D258; D258A; D259; D260; D264
Misc
Partial Correction
03/31/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: ON 1ST FLOOR AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K;
In-wall Inspection Partial 4/6/2017 4/6/2017 04/06/2017
Misc
Partial Correction
03/29/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
03/29/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A*; D154B*; *: EAST WALL TO 12' AFF ONLY VERTICAL DEAD SPACE AT Q/4.8-5.4
Misc
Partial Correction
03/29/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
In-wall Inspection Partial 4/10/2017 4/10/2017 04/10/2017
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) EXCEPT 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A*; D154B*; *: EAST WALL TO 12' AFF ONLY
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
Above Ceiling Inspection Partial 4/11/2017 04/11/2017
Misc
Partial Correction
03/29/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3;
Rated Assembly Inspection Partial 4/11/2017 04/11/2017
Misc
Partial Correction
04/06/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
Misc
Partial Correction
04/06/2017
SEPARATION WALL ON (6): INNER WYTHE: PENETRATIONS OF LINER BOARD FIRE-STOPPED; OK TO HANG 5/8" TYPE X GWB BOTH FACES; OUTER WYTHE: 1ST FLOOR FROM N TO R WEST FACE; OUTER WYTHE: 2ND FLOOR FROM J TO N WEST FACE; WEST FINISH FACE: OK TO HANG 1ST LAYER TO 12' AFF FROM B TO WEST FINISH FACE: OK TO HANG ONE LAYER FULL HEIGHT TO 2ND FLR ELEVATION FROM F TO N + FROM U COMPLETE TO BB; EAST FINISH FACE OK TO HANG ONE LAYER FULL HEIGHT FROM NEAR A TO BB
Misc
Partial Correction
04/06/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS;
Misc
Partial Correction
04/06/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
In-wall Inspection Partial 4/11/2017 4/11/2017 04/11/2017
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; VERTICAL DEAD SPACE AT Q/4.8-5.4; 4-151A, D154A & D154B NOW FULL HEIGHT;
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
In-wall Inspection Partial 4/11/2017 04/11/2017
Misc
Partial Correction
04/10/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) EXCEPT 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
04/10/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Partial Correction
04/10/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL;
Above Ceiling Inspection Partial 4/11/2017 04/11/2017
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S;
In-wall Inspection Partial 4/13/2017 4/13/2017 04/13/2017
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) EXCEPT 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL; SOFFITS IN BETWEEN 202 AND 203 AND IN THE BATHROOMS APPROVED. A200 APPROVED NO VIOLATIONS IN WALL D257 AND 256, NEED TO FIRECAULK ELECTRICAL PENETRATIONS IN THE SHAFT WALL. APPROVED TO COVER: B260, B259, B253, B254
In-wall Inspection Partial 4/17/2017 4/17/2017 04/17/2017
Misc
Partial Correction
04/13/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) INCLUDING 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18.
Misc
Partial Correction
04/13/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Partial Correction
04/13/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL; SOFFITS IN BETWEEN 202 AND 203 AND IN THE BATHROOMS APPROVED. A200 APPROVED NO VIOLATIONS IN WALL D257 AND 256, NEED TO FIRECAULK ELECTRICAL PENETRATIONS IN THE SHAFT WALL. APPROVED TO COVER: B260, B259, B253, B254
Rated Assembly Inspection Partial 4/17/2017 04/17/2017
Misc
Partial Correction
04/11/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
Misc
Partial Correction
04/11/2017
SEPARATION WALL ON (6): INNER WYTHE: PENETRATIONS OF LINER BOARD FIRE-STOPPED; OK TO HANG 5/8" TYPE X GWB BOTH FACES; OUTER WYTHE: 1ST FLOOR FROM N TO R WEST FACE; OUTER WYTHE: 2ND FLOOR FROM J TO N WEST FACE; WEST FINISH FACE: OK TO HANG 1ST LAYER TO 12' AFF FROM B TO WEST FINISH FACE: LEVEL ONE 1ST LAYER APPROVED FULL HEIGHT FROM (A) TO (BB); LEVEL TWO OK FOR 1ST LAYER FROM (A) TO (G); EAST FINISH FACE OK TO HANG ONE LAYER FULL HEIGHT FROM NEAR A TO BB
Misc
Partial Correction
04/11/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRAMING + LINER BOARD FULL HEIGHT NORTH, EAST, SOUTH WALLS; EAST WALL 2ND FLOOR 1ST LAYER 5/8" TYPE X; 1ST FLOOR S WALL OK TO HANG 2ND LAYER 5/8" TYPE X GWB; 1ST FLOOR N WALL OK TO HANG BOTH LAYERS 5/8" TYPE X GWB; 2ND FLOOR OK FOR 2ND LAYER 5/8" TYPE X AT N,E,S WALLS; FRONTS AT LEVEL ON AND LEVEL TWO FRAMING & LINER BOARD OK FOR 5/8" TYPE X;
Misc
Partial Correction
04/11/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
In-wall Inspection Partial 4/21/2017 04/21/2017
Misc
Partial Correction
04/17/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) INCLUDING 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18. 2-250; 2-251; 2-252; 4-201; 4-201A; 4-202; 4-203;
Misc
Partial Correction
04/17/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Resolved
04/21/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING MEZZANINE LOCATIONS: 301 WEST WALL; SOFFITS IN BETWEEN 202 AND 203 AND IN THE BATHROOMS APPROVED. A200 APPROVED NO VIOLATIONS IN WALL D257 AND 256, NEED TO FIRECAULK ELECTRICAL PENETRATIONS IN THE SHAFT WALL. APPROVED TO COVER: B260, B259, B253, B254
Misc
Corrective Action Required
04/21/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT KNEEWALLS AT: 1-101; 1-117; 3-250;
Above Ceiling Inspection Partial 4/21/2017 04/21/2017
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103;
All Rough Inspection - Commercial Partial 4/21/2017 04/21/2017
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY WOOD FRAMING & ENCLOSED SYSTEMS @ UNDER-STAIR SPACES AT: 1ST LEVEL A-COMMONS, C-COMMONS;
Rated Assembly Inspection Partial 4/21/2017 4/21/2017 04/21/2017
Misc
Resolved
04/21/2017
PARAPET BEWEEN AC SECTIONS AND BD, MINERAL WOOL AND FIRE PROOFING BETWEEN SHAFT WALLS APPROVED.
Misc
Partial Correction
04/17/2017
SEPARATION WALL ON (6)/(7): INNER WYTHE: PENETRATIONS OF LINER BOARD FIRE-STOPPED; OK TO HANG 5/8" TYPE X GWB BOTH FACES; OUTER WYTHE: 1ST FLOOR FROM N TO R WEST FACE; OUTER WYTHE: 2ND FLOOR FROM J TO N WEST FACE; WEST FINISH FACE: OK TO HANG 1ST LAYER TO 12' AFF FROM B TO WEST FINISH FACE: LEVEL ONE 1ST LAYER APPROVED FULL HEIGHT FROM (A+4') TO (BB); 2ND LAYER OK TO TAPE, MUD & FIRE-STOP (A) TO (N) & (Q) TO (BB); LEVEL TWO OK FOR 1ST LAYER FROM (A) TO (G); 1ST LAYER (A) TO (F); EAST FINISH FACE OK TO HANG ONE LAYER FULL HEIGHT FROM A+4' TO BB; ONE LAYER FULL HEIGHT OK FOR TAPE, MUD & FIRE-STOP;
Misc
Partial Correction
04/17/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRONTS AT LEVEL ONE AND LEVEL TWO FRAMING & LINER BOARD OK FOR 5/8" TYPE X; 1ST LAYER 5/8" TYPE X GWB BOTH LEVELS
Misc
Partial Correction
04/17/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
In-wall Inspection Partial 4/24/2017 4/24/2017 04/24/2017
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) INCLUDING 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18. 2-250; 2-251; 2-252; 4-201; 4-201A; 4-202; 4-203; 2-204/205; 2-206; WEST WYTHE ON (6) FROM (R) TO (Z) OK TO HANG 1ST LAYER 5/8" TYPE X;
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Corrective Action Required
04/21/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT KNEEWALLS AT: 1-101; 1-117; 3-250;
Above Ceiling Inspection Partial 4/24/2017 04/24/2017
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE;
Rated Assembly Inspection Partial 4/24/2017 04/24/2017
Misc
Partial Correction
04/21/2017
SEPARATION WALL ON (6)/(7) -- OK TO COVER: LEVEL ONE: WEST FINISH FACE 2ND LAYER FROM (U) TO (BB); LEVEL TWO: 1ST LAYER FROM (A) TO (G);
Misc
Partial Correction
04/21/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRONTS AT LEVEL ONE AND LEVEL TWO FRAMING & LINER BOARD OK FOR 5/8" TYPE X; 1ST LAYER 5/8" TYPE X GWB BOTH LEVELS; 2ND LAYER 5/8" TYPE X GWB BOTH LEVELS
Misc
Resolved
04/24/2017
AT ELEVATOR EQUIPMENT ROOM A150 OK TO APPLY 1ST LAYER 5/8" TYPE X GWB AT WEST WALL, 2 LAYERS AT CONNECTION WITH INTERSECTING WALL; 2ND LAYER 5/8" TYPE X GWB AT WEST WALL; FRAMING + ONE LAYER 1" LINER BOARD AT CEILING; SOUTH WALL OK TO COVER SOUTH FACE OF SOUTH WALL WITH 5/8" TYPE X; OK TO COVER SOUTH FACE OF SOUTH WALL WITH 2ND LAYER 5/8" TYPE X; OK TO INSTALL 1ST LAYER 5/8" TYPE X GWB AT CEILING;
In-wall Inspection Partial 4/27/2017 4/27/2017 04/27/2017
Misc
Partial Correction
04/24/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) INCLUDING 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18. 2-250; 2-251; 2-252; 4-201; 4-201A; 4-202; 4-203; 2-204/205; 2-206; WEST WYTHE ON (6) FROM (R) TO (Z) OK TO HANG 1ST LAYER 5/8" TYPE X; B201 EXCEPT @ DOOR 2-201; B202; B203;
Misc
Partial Correction
04/24/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Partial Correction
04/27/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT KNEEWALLS AT: 1-101; 1-117; 3-250;
Rated Assembly Inspection Partial 4/27/2017 04/27/2017
Misc
Partial Correction
04/24/2017
SEPARATION WALL ON (6)/(7) -- OK TO COVER: LEVEL ONE: WEST FINISH FACE 2ND LAYER FROM (U) TO (BB); LEVEL TWO: ON (6) 2ND LAYER FROM (R) TO (Z);
Misc
Resolved
04/27/2017
ELEVATOR SHAFT -- OK TO COVER WHEN READY: FRONTS AT LEVEL ONE AND LEVEL TWO FRAMING & LINER BOARD OK FOR 5/8" TYPE X; 1ST LAYER 5/8" TYPE X GWB BOTH LEVELS; 2ND LAYER 5/8" TYPE X GWB BOTH LEVELS
Misc
Partial Correction
04/27/2017
PENTHOUSE D EAST WALL: FRAMING & LINER BOARD OK TO COVER FROM (R) TO (Z) AFTER FIRE CAULKING IN PROGRESS IS COMPLETED;
Rated Assembly Inspection Partial 5/1/2017 5/1/2017 05/01/2017
Misc
Partial Correction
04/27/2017
SEPARATION WALL @ (6)/(7): LEVEL TWO: ON (6) EAST FINISH FACE 2ND LAYER FROM (Q) TO (Z);
Misc
Partial Correction
04/27/2017
PENTHOUSE D EAST WALL OK TO COVER WHEN READY: FRAMING & LINER BOARD; ONE LAYER 5/8" TYPE X;
In-wall Inspection Partial 5/1/2017 5/1/2017 05/01/2017
Misc
Partial Correction
04/27/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) INCLUDING 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18. 2-250; 2-251; 2-252; 4-201; 4-201A; 4-202; 4-203; 2-204/205; 2-206; WEST WYTHE ON (6) FROM (R) TO (Z) OK TO HANG 1ST LAYER 5/8" TYPE X; B201 EXCEPT @ DOOR 2-201; B202; B203; B207; B210;
Misc
Partial Correction
04/27/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Partial Correction
04/27/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT KNEEWALLS AT: 1-101; 1-117; 3-250;
Above Ceiling Inspection Partial 5/1/2017 05/01/2017
Misc
Partial Correction
04/24/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152;
Rated Assembly Inspection Partial 5/3/2017 5/3/2017 05/03/2017
Misc
Partial Correction
05/01/2017
SEPARATION WALL @ (6)/(7): LEVEL TWO: ON (6) EAST FINISH FACE 2ND LAYER FROM (Q) TO (Z);
Misc
Partial Correction
05/01/2017
PENTHOUSE D EAST WALL OK TO COVER WHEN READY: FRAMING & LINER BOARD; TWO LAYERS 5/8" TYPE X OK TO TAPE & MUD -- FIRE-STOPPED
Above Ceiling Inspection Partial 5/5/2017 5/3/2017 05/03/2017
Misc
Partial Correction
05/01/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES;
Above Ceiling Inspection Partial 5/5/2017 5/5/2017 05/05/2017
Misc
Partial Correction
05/03/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253;
In-wall Inspection Partial 5/5/2017 05/05/2017
Misc
Resolved
05/05/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 2ND FLOOR LOCATIONS: A218; C271; AREA "A"; AREA "C" N OF STAIR; C202; C203; C206; C207; B209; B258A; C218; C205; 202; 203; AREA "D": B257; B257A; B257B; B258; B261; ALL NORTH OF (G) INCLUDING 254, 256, 257; BETWEEN COMMONS A-C EXCEPT 202,3,6,9,18. 2-250; 2-251; 2-252; 4-201; 4-201A; 4-202; 4-203; 2-204/205; 2-206; WEST WYTHE ON (6) FROM (R) TO (Z) OK TO HANG 1ST LAYER 5/8" TYPE X; B201 EXCEPT @ DOOR 2-201; B202; B203; B207; B210;
Misc
Resolved
05/05/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING 1ST FLOOR LOCATIONS: EAST WALL OF ELECT 3-161; OK TO 4' TOP-OUT WALLS; AREA "A" COMPLETE AREA "B": B101 S,W,N WALLS; B102; 103; 104; 105; 106; 107; 108; 109; 110; 111; 152; 153; 153A; 153B; 154; 155; 156-161; AREA "C" COMPLETE EXCEPT C160; B153; D161; B209; B258A; AREA "D": D150/151/152 NORTH & WEST WALLS; 150A; 151A; 152A; 153; 154; 155; 159; 160; 162; D156; D157; D102; D103; 4-151A, D154A, D154B FULL HEIGHT; D101; B150 N&E; B151 N&W; *: EAST WALL TO 12' AFF ONLY
Misc
Resolved
05/05/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT KNEEWALLS AT: 1-101; 1-117; 3-250;
Misc
Partial Correction
05/05/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT: STAIRWELL 3-156 1ST LEVEL;
Above Ceiling Inspection Partial 5/9/2017 05/09/2017
Misc
Partial Correction
05/05/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206;
Above Ceiling Inspection Partial 5/15/2017 05/15/2017
Misc
Partial Correction
05/09/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151;
Misc
Partial Correction
05/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING & ENCLOSED SYSTEMS PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K; Q/3 - Q/3.5; U/3 - U/3.5; G/4 - G/4.5; J/4 - J/4.5;
Misc
Corrective Action Required
05/15/2017
2B- 209 2D- 256; 201A; 261; 258A; 254;
Rated Assembly Inspection Partial 5/15/2017 5/15/2017 05/15/2017
Misc
Partial Correction
05/03/2017
SEPARATION WALL @ (6)/(7): LEVEL TWO: ON (6) EAST FINISH FACE 2ND LAYER FROM (Q) TO (Z);
Misc
Partial Correction
05/03/2017
PENTHOUSE D EAST WALL OK TO COVER WHEN READY: FRAMING & LINER BOARD; TWO LAYERS 5/8" TYPE X OK TO TAPE & MUD -- FIRE-STOPPED
Misc
Partial Correction
05/15/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: FRAMING & LINER BOARD @ INSIDE FACE AT DOORS 2-100.1 AND 4-100.1;
Rough Framing Inspection - Commercial Partial 5/15/2017 05/15/2017
Misc
Resolved
05/15/2017
AREA SEPARATION WALL ON (7): ABOVE ROOF EAST FACE -- DEFLECTION CLIP SCREWS VERIFIED
Misc
Resolved
05/15/2017
LIGHT-GAUGE STEEL EXTERIOR WALL FRAMING SUBSTANTIALLY COMPLETE WITH NO ISSUES FOUND AT: NORTH ELEVATION; WEST ELEVATION; SOUTH ELEVATION; EAST ELEVATION
Misc
Resolved
05/15/2017
NO ISSUES FOUND WITH INSTALLATION OF 16 GA. STEEL JOISTS FOR MECHANICAL DECKS ABOVE SPACES: D255; D258; D258A; D259; D260; D264
Misc
Resolved
05/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING & ENCLOSED SYSTEMS PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: ON 1ST FLOOR AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K; Q/3 - Q/3.5; U/3 - U/3.5; G/4 - G/4.5; J/4 - J/4.5;
Misc
Partial Correction
05/15/2017
DOOR FRAMES NOW INSTALLED AT OPENINGS 2-205, 4-262, 2-256
Underslab Electrical Inspection - Commercial Passed 8/26/2016 05/15/2017
Misc
Resolved
05/15/2017
NO ISSUES FOUND ON TRENCHED UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP THROUGHOUT INCLUDING TWO 3" NOW COMPLETED AT AREA "B" CENTER NEAR (BB)
Underground Electrical Inspection - Commercial Passed 12/20/2016 05/15/2017
Misc
Resolved
05/15/2017
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1; #2; #3; #4; #5; #6; #7; #8; #9; #10; #11; #12; #13; #14; #15; #16; #17 thru #20; #21; #22; #24; #25; #26;
Above Ceiling Inspection Partial 5/17/2017 5/17/2017 05/17/2017
Misc
Partial Correction
05/15/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151;
Misc
Partial Correction
05/15/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING & ENCLOSED SYSTEMS PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K; Q/3 - Q/3.5; U/3 - U/3.5; G/4 - G/4.5; J/4 - J/4.5;
Misc
Partial Correction
05/17/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; C101; C102; C102A; C103; C103A; C104; C105; C106; C154; C155; C155A; C155B; C156A;
Rough Framing Inspection - Commercial Partial 5/17/2017 05/17/2017
Misc
Partial Correction
05/15/2017
DOOR FRAMES NOW INSTALLED AT OPENINGS 2-205, 4-262, 2-256; 2-201
Rated Assembly Inspection Partial 5/19/2017 5/19/2017 05/19/2017
Misc
Resolved
05/19/2017
SEPARATION WALL @ (6)/(7): LEVEL TWO: ON (6) EAST FINISH FACE 2ND LAYER FROM (Q) TO (Z);
Misc
Resolved
05/19/2017
PENTHOUSE D EAST WALL OK TO COVER WHEN READY: FRAMING & LINER BOARD; TWO LAYERS 5/8" TYPE X OK TO TAPE & MUD -- FIRE-STOPPED
Misc
Partial Correction
05/15/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE;
Above Ceiling Inspection Partial 5/19/2017 05/19/2017
Misc
Partial Correction
05/17/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207;
Misc
Partial Correction
05/17/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING & ENCLOSED SYSTEMS PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K; Q/3 - Q/3.5; U/3 - U/3.5; G/4 - G/4.5; J/4 - J/4.5;
Misc
Partial Correction
05/17/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; C101; C102; C102A; C103; C103A; C104; C105; C106; C154; C155; C155A; C155B; C156A;
All Rough Inspection - Commercial Partial 5/19/2017 5/19/2017 05/19/2017
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY WOOD FRAMING & ENCLOSED SYSTEMS @ UNDER-STAIR SPACES AT: 1ST LEVEL A-COMMONS, C-COMMONS; SPRINKLER PIPING + GUARD & UNDERSTAIR FRAMING AT COMMONS 100 STAIR;
Above Ceiling Inspection Partial 5/23/2017 5/23/2017 05/23/2017
Misc
Partial Correction
05/19/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207;
Misc
Partial Correction
05/19/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING & ENCLOSED SYSTEMS PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K; Q/3 - Q/3.5; U/3 - U/3.5; G/4 - G/4.5; J/4 - J/4.5;
Misc
Partial Correction
05/19/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; C101; C102; C102A; C103; C103A; C104; C105; C106; C154; C155; C155A; C155B; C156A; [C150; C151; C152; C157B; C159;
Rated Assembly Inspection Partial 5/23/2017 05/23/2017
Misc
Partial Correction
05/19/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; OPENING 2-204: FRAMING & LINER BOARD @ INSIDE(W) FACE;
Gas Piping Inspection - Commercial Passed 5/23/2017 05/23/2017
Misc
Resolved
05/23/2017
NO ISSUES FOUND ON VISUAL INSPECTION OF 3" GAS PIPE FROM BUILDING ENTRY TO MEZZANINE. P.C. PRESSURE-TESTED 3" LINE; CUMULATIVE PRESSURE TEST OF 3" LINE + SUPPLY TO MED LABS C102 & C103; VISUAL + PRESSURE TEST OF COMPLETE PIPING SYSTEM EXCEPT AT WATER HEATERS AND BOILERS
Gas Service Inspection - Commercial Passed 5/23/2017 5/23/2017 05/23/2017
In-wall Inspection Partial 5/25/2017 05/25/2017
Misc
Partial Correction
05/05/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT: STAIRWELL 3-156 1ST LEVEL; WALL "BUMP-OUT" AT MAIN COMMONS AT MAIN STAIR;
Rated Assembly Inspection Partial 5/26/2017 5/26/2017 05/26/2017
Misc
Partial Correction
05/23/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; ] OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB;
In-wall Inspection Partial 5/26/2017 5/26/2017 05/26/2017
Misc
Partial Correction
05/25/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT: STAIRWELL 3-156 1ST LEVEL; WALL "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL AT MAIN STAIR; "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL SOUTHWEST; "BUMP-OUT" AT MAIN COMMONS @ FIRE HOSE CABINET AT 2ND LEVEL SOUTHWEST;
Misc
Partial Correction
05/26/2017
OK TO COVER WHEN READY WALL/HEADER FRAMING & IN-WALL SYSTEMS AT: 206; 207;
Rated Assembly Inspection Partial 5/30/2017 5/30/2017 05/30/2017
Misc
Partial Correction
05/26/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB;
Above Ceiling Inspection Partial 5/30/2017 05/30/2017
Misc
Partial Correction
05/23/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252;
Misc
Resolved
05/30/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMING & ENCLOSED SYSTEMS PER A/E RIVISION "METAL SHROUD LIGHT DETAIL" DTD 3/28/17: AT 10.25/W-Y AND 10.75/J-L; 10/I-K; 10.5/I-K; Q/3 - Q/3.5; U/3 - U/3.5; G/4 - G/4.5; J/4 - J/4.5;
Misc
Partial Correction
05/23/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; C101; C102; C102A; C103; C103A; C104; C105; C106; C154; C155; C155A; C155B; C156A; [C150; C151; C152; C157B; C159;
Rated Assembly Inspection Partial 6/1/2017 6/1/2017 06/01/2017
Misc
Partial Correction
05/30/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208;
In-wall Inspection Partial 6/1/2017 06/01/2017
Misc
Partial Correction
05/26/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT: STAIRWELL 3-156 1ST LEVEL; WALL "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL AT MAIN STAIR; "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL SOUTHWEST; "BUMP-OUT" AT MAIN COMMONS @ FIRE HOSE CABINET AT 2ND LEVEL SOUTHWEST; SPACE D254; B208; 3-226; AT/ADJACENT TO DOOR OPENING 4-150.1;
Misc
Resolved
06/01/2017
OK TO COVER WHEN READY WALL/HEADER FRAMING & IN-WALL SYSTEMS AT: 206; 207;
Rated Assembly Inspection Partial 6/2/2017 06/02/2017
Misc
Partial Correction
06/01/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; FRAMING & LINER BOARD @ N WALL OF B208;
Above Ceiling Inspection Partial 6/5/2017 6/5/2017 06/05/2017
Misc
Partial Correction
05/30/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252;
Misc
Partial Correction
05/30/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; A250-252; C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
In-wall Inspection Partial 6/5/2017 06/05/2017
Misc
Partial Correction
06/01/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT: STAIRWELL 3-156 1ST LEVEL; WALL "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL AT MAIN STAIR; "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL SOUTHWEST; "BUMP-OUT" AT MAIN COMMONS @ FIRE HOSE CABINET AT 2ND LEVEL SOUTHWEST; SPACE D254; B208; 3-226; AT/ADJACENT TO DOOR OPENING 4-150.1; SHOWER CHASE @ 3-226;
Rated Assembly Inspection Partial 6/6/2017 06/06/2017
Misc
Partial Correction
06/02/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208;
Above Ceiling Inspection Partial 6/6/2017 6/6/2017 06/06/2017
Misc
Partial Correction
06/05/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A;
Misc
Partial Correction
06/05/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Above Ceiling Inspection Partial 6/8/2017 06/08/2017
Misc
Partial Correction
06/06/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252;
Misc
Partial Correction
06/06/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Rated Assembly Inspection Partial 6/8/2017 06/08/2017
Misc
Partial Correction
06/06/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208; OPENING 2-207.1: FRAMING & SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT;
Above Ceiling Inspection Partial 6/13/2017 06/13/2017
Misc
Partial Correction
06/08/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207;
Misc
Partial Correction
06/08/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Rated Assembly Inspection Partial 6/13/2017 06/13/2017
Misc
Partial Correction
06/08/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208; OPENING 2-207.1: FRAMING & SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; 2ND LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT;
Miscellaneous Inspection Partial 2/2/2017 (8:00) 6/15/2017 06/15/2017
Misc
Partial Correction
06/15/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E: A165; C101; C106; C150; C152; ; A203; A204; A205; A207;
Above Ceiling Inspection Partial 6/16/2017 6/16/2017 06/16/2017
Misc
Partial Correction
06/13/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE;
Misc
Partial Correction
06/13/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
All Rough Inspection - Commercial Partial 6/13/2017 6/16/2017 06/16/2017
Misc
Resolved
06/16/2017
OK TO COVER WHEN READY WOOD FRAMING & ENCLOSED SYSTEMS @ UNDER-STAIR SPACES AT: 1ST LEVEL A-COMMONS, C-COMMONS; SPRINKLER PIPING + GUARD & UNDERSTAIR FRAMING AT COMMONS 100 STAIR;
Misc
Partial Correction
06/16/2017
OK TO COVER WHEN READY LIGHT-GAUGE FRAMING & ENCLOSED SYSTEMS AT: HELP DESK AT MAIN COMMONS NW;
Rated Assembly Inspection Partial 6/16/2017 06/16/2017
Misc
Partial Correction
06/13/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208; OPENING 2-207.1: FRAMING & SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; 2ND LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; FRAMING & SHAFT LINER BOARD AT CEILING;
Alarm Test Partial 6/16/2017 06/16/2017
Sprinkler - Flow Test Passed 6/16/2017 06/16/2017
Rated Assembly Inspection Partial 6/19/2017 06/19/2017
Misc
Partial Correction
06/16/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208; OPENING 2-207.1: FRAMING & SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; 2ND LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT LID;
Above Ceiling Inspection Partial 6/19/2017 06/19/2017
Misc
Partial Correction
06/16/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE;
Misc
Partial Correction
06/16/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Misc
Partial Correction
06/19/2017
TWO-LAYER 5/8" GWB SOUND CEILINGS FRAMED AND INSTALLED WITHOUT INTERIM INSPECTION BOTH LAYERS AT :A153A; 153B; 156A; 156B;
Miscellaneous Inspection Partial 6/19/2017 06/19/2017
Misc
Partial Correction
06/15/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A165; [101B; 102 - 116; C101; C106; C150; C152; C222; 251 - 254; 256; 257; 260 - 270; 272 - 275; 277; 278; A203; A204; A205; A207;
Rated Assembly Inspection Partial 6/20/2017 06/20/2017
Misc
Partial Correction
06/19/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208; OPENING 2-207.1: FRAMING & SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; 2ND LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT LID; 2ND LAYER 5/8" TYPE X GWB AT LID
Above Ceiling Inspection Partial 6/20/2017 06/20/2017
Misc
Partial Correction
06/19/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE;
Misc
Partial Correction
06/19/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Misc
Partial Correction
06/19/2017
TWO-LAYER 5/8" GWB SOUND CEILINGS FRAMED AND INSTALLED WITHOUT INTERIM INSPECTION BOTH LAYERS AT :A153A; 153B; 156A; 156B; OK TO COVER WHEN READY FRAMING OF SOUND CEILING AND ABOVE-CEILING SYSTEMS AT: 1-153;
Miscellaneous Inspection Partial 6/20/2017 06/20/2017
Misc
Partial Correction
06/19/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A165; [101B; 102 - 116; C101; C106; C150; C152; C222; 251 - 254; 256; 257; 260 - 270; 272 - 275; 277; 278; 3-152; 3-152A; A203; A204; A205; A207;
Miscellaneous Inspection Partial 6/21/2017 06/21/2017
Misc
Partial Correction
06/20/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; [205A; 205B; [1-101A; 101C; 1-159A; 1-164; [1-207A; 1-209; 1-210; 1-212; 1-213; 1-216; 1-217; 1-220; 1-221; 3-152; 3-152A; [3-102A; 3-103A; 3-105; 3-155; 3-155A; 3-157B; 3-203; 3-204A; 3-204B; 3-205; 3-210; 3-215; 3-216; 3-218; 3-220; 3-221; 3-258; 3-259;
Above Ceiling Inspection Partial 6/21/2017 06/21/2017
Misc
Partial Correction
06/20/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE; 2-101 AFTER ELECT J.B.s AT S.E. ARE MADE UP AND CLOSED;
Misc
Partial Correction
06/20/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Misc
Partial Correction
06/20/2017
TWO-LAYER 5/8" GWB SOUND CEILINGS FRAMED AND INSTALLED WITHOUT INTERIM INSPECTION BOTH LAYERS AT :A153A; 153B; 156A; 156B; OK TO COVER WHEN READY FRAMING OF SOUND CEILING AND ABOVE-CEILING SYSTEMS AT: 1-153;
Above Ceiling Inspection Partial 6/23/2017 6/23/2017 06/23/2017
Misc
Partial Correction
06/21/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE; 2-101; 4-250; 4-251; 4-252; 4-253;
Misc
Partial Correction
06/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A153C; A153D; A161; A163; [101C; 118; 119; A250-252; [201 & CORR; 202-205; 207A; 209; 210; 212-216; 220-222; 278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; C152; C154; C155; C155A; C155B; C156A; C157B; C159; [151A; 151B; STAIR 156; C202; 203; 204A; 204B; 205; 205B-222; 224; 225; 250A; 252;-257; 260-270; 272-274; 277;
Misc
Resolved
06/23/2017
TWO-LAYER 5/8" GWB SOUND CEILINGS FRAMED AND INSTALLED WITHOUT INTERIM INSPECTION BOTH LAYERS AT :A153A; 153B; 156A; 156B; OK TO COVER WHEN READY FRAMING OF SOUND CEILING AND ABOVE-CEILING SYSTEMS AT: 1-153;
Miscellaneous Inspection Partial 6/23/2017 06/23/2017
Misc
Partial Correction
06/21/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 205A; 205B; [104; 105; 106; 1-101A; 101C; 1-159A; 1-164; 1-207A; 1-209; 1-210; 1-212; 1-213; 1-216; 1-217; 1-220; 1-221; 3-152; 3-152A; [3-102A; 3-103A; 3-105; 3-155; 3-155A; 3-157B; 3-203; 3-204A; 3-204B; 3-205; 3-210; 3-215; 3-216; 3-218; 3-220; 3-221; 3-258; 3-259;
Above Ceiling Inspection Partial 6/27/2017 6/27/2017 06/27/2017
Misc
Partial Correction
06/23/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE; 2-101; 4-250; 4-251; 4-252; 4-253;
Misc
Partial Correction
06/23/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; 4-264;
Miscellaneous Inspection Partial 6/27/2017 06/27/2017
Misc
Partial Correction
06/23/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 104; 105; 106; 205A; 205B; 1-101A; 101C; 1-159A; 1-164; 1-207A; 1-209; 1-210; 1-212; 1-213; 1-216; 1-217; 1-220; 1-221; [1-159; 3-102A; 3-103A; 3-105; 3-152; 3-152A; 3-155; 3-155A; 3-157B; 3-203; 3-204A; 3-204B; 3-205; 3-210; 3-215; 3-216; 3-218; 3-220; 3-221; 3-258; 3-259; [3-157; 3-158;
Occupancy Inspection - Water Utilities Passed 06/28/2017
Above Ceiling Inspection Partial 6/30/2017 6/30/2017 06/30/2017
Misc
Partial Correction
06/27/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE; 2-101; 4-250; 4-251; 4-252; 4-253; [4-100.1;
Misc
Partial Correction
06/27/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; [2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); 4-264; [4-201; 4-202; 4-203; 4-255; 4-258; 4-259; 4-260; 4-262; 4-263;
Above Ceiling Inspection Partial 7/5/2017 7/5/2017 07/05/2017
Misc
Partial Correction
06/30/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE; 2-101; 4-250; 4-251; 4-252; 4-253; [4-100.1;
Misc
Partial Correction
06/30/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; 2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); [2-201; 2-257; 4-201; 4-202; 4-203; 4-255; 4-258; 4-259; 4-260; 4-262; 4-263; 4-264;
Miscellaneous Inspection Partial 7/5/2017 07/05/2017
Misc
Partial Correction
06/27/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 104; 105; 106; 205A; 205B; 1-101A; 101C; 1-159; 1-159A; 1-164; 1-207A; 1-209; 1-210; 1-212; 1-213; 1-216; 1-217; 1-220; 1-221; [1-214; 1-215; 1-219; 1-222 - 1-224; 1-250 - 1-252; 3-102A; 3-103A; 3-105; 3-152; 3-152A; 3-155; 3-155A; 3-157B; 3-203; 3-204A; 3-204B; 3-205; 3-210; 3-215; 3-216; 3-218; 3-220; 3-221; 3-258; 3-259; [3-157; 3-158;
Sprinkler - Hydrostatic Test Passed 6/16/2017 07/06/2017
Underground Electrical Inspection - Commercial Partial 7/6/2017 7/6/2017 07/06/2017
Misc
Partial Correction
07/06/2017
OK TO COVER WHEN READY TRENCHED PVC CONDUIT FOR BOLLARD LIGHTS AT: N OF BLDG EAST OF N ENTRANCE SIDEWALK;
Underground Electrical Inspection - Commercial Partial 7/7/2017 7/7/2017 07/07/2017
Misc
Partial Correction
07/06/2017
OK TO COVER WHEN READY TRENCHED PVC CONDUIT FOR BOLLARD LIGHTS AT: N OF BLDG EAST OF N ENTRANCE SIDEWALK; S OF BLDG ALONG EDGE OF E-W SIDEWALK FROM E END TO ONE BOLLARD W OF ENTRANCE SIDEWALK;
Underground Electrical Inspection - Commercial Partial 7/7/2017 7/7/2017 07/07/2017
Misc
Partial Correction
07/07/2017
OK TO COVER WHEN READY TRENCHED PVC CONDUIT FOR BOLLARD LIGHTS AT: N OF BLDG EAST OF N ENTRANCE SIDEWALK; S OF BLDG ALONG EDGE OF E-W SIDEWALK COMPLETE FROM E END TO W END;
Above Ceiling Inspection Partial 7/7/2017 7/7/2017 07/07/2017
Misc
Resolved
07/07/2017
OK TO COVER WHEN READY GWB CEILING /SOFFIT /LIGHT COVE FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING 1ST FLOOR SPACES: VESTIBULE @ MEN'S & WOMEN'S RESTROOMS 102 / 103; SOFFITS/FACIAS @ C104 LAB, 1-101, 1-117, 1-118; LIGHT COVE @ 1-151; HARD LID SOFFIT FIRST FLOOR AREA C A156; RR'S 102 & 103; A202; C202; C250; 206; 259; TENSION STUDS AT LIGHT SLOT CEILING AT N.2/9.3; BULKHEAD AT B152 E&S; HARD LID SOFFIT TENSION STUDS @ 4-150/151 & 152; BULKHEADS @ 4-101, 102, 103; SOFFIT AT CORRIDOR B155 EAST SIDE; TENSION STUDS SUPPORTING SOFFITS AT B151, B152; ROLLER SHADE POCKETS AT "C" A252 AND AT "A" A201; SOFFIT @ 3-250; SOFFIT + EYEBROW @ 205 INTNL STUDIES; [1-102 THRU 1-114; 1-117; 4-150 THRU 4-152; BULKHEADS AT 100A,100B, 2-150, 2-151; LIGHT COVE AT 4-156 & 4-157; SHADE POCKETS AT 2-101, 2-204, 2-205, 4-250 THRU 4-253; SHADE POCKETS AT B206; OUTER BAND OF FRAMING AROUND CLOUD CEILINGS AT B150 & B151; THREE CLOUD CEILINGS AT B150 & B151; TENSION STUDS SUPPORTING SOFFITS AT B250, B251, B252, TWO AT B207; BULKHEAD TENSION STUDS E-W ACROSS FULL LENGTH OF B250, B251, B252; MAIN COMMONS SOUTH 100A; THREE SUSPENDED SOFFITS COMPLETE AT B250, B251, B252; TWO SUSPENDED SOFFITS AT 2-207; CEILING AT MAIN COMMONS N END NEAR ENTRANCE; 2-101; 4-250; 4-251; 4-252; 4-253; [4-100.1;
Misc
Partial Correction
07/05/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; [2-156; 2-157; 2-158; 2-159; 2-160; 2-161; 2-201; 2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); [2-202; 2-203; 2-204; 2-205; 2-206; 2-250; 2-252; 2-253; [3-153; 3-153A; 3-153B; 3-156B; 3-156C; [4-158; 4-201; 4-202; 4-203; 4-255; 4-258; 4-259; 4-260; 4-262; 4-263; 4-264; [4-256;
Miscellaneous Inspection Not Ready 7/10/2017 7/10/2017 07/10/2017
Misc
Partial Correction
07/05/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 104; 105; 106; 205A; 205B; 1-101A; 101C; 1-159; 1-159A; 1-164; 1-207A; 1-209; 1-210; 1-212; 1-213; 1-216; 1-217; 1-220; 1-221; [1-214; 1-215; 1-219; 1-222 -- 1-224; 1-250 -- 1-252; 3-102A; 3-103A; 3-105; 3-152; 3-152A; 3-155; 3-155A; 3-157; 3-157B; 3-158; 3-203; 3-204A; 3-204B; 3-205; 3-210; 3-215; 3-216; 3-218; 3-220; 3-221; 3-258; 3-259; [
Sprinkler - Hydrostatic Test Passed 7/6/2017 07/11/2017
Miscellaneous Inspection Partial 7/11/2017 7/11/2017 07/11/2017
Misc
Partial Correction
07/10/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 104; 105; 106; [202 -- 205; 205A; 205B; 1-101A; 101C; 1-159; 1-159A; 1-164; 1-207A; 1-209; 1-210; 1-212; 1-213; 1-214; 1-215; 1-216; 1-217; 1-219; 1-220; 1-221; 1-222 -- 1-224; 1-250 -- 1-252; [1-201; 1-202; 1-206; 1-208; 1-218*; 1-250 -- 1-252; 3-102A; 3-103A; 3-105; 3-152; 3-152A; 3-155; 3-155A; 3-157; 3-157B; 3-158; 3-203; 3-204A; 3-204B; 3-205; 3-210; 3-215; 3-216; 3-218; 3-220; 3-221; 3-258; 3-259; [3-202; 3-205; 3-207; 3-208; 3-209; 3-211; 3-212; 3-213; 3-214; 3-217; 3-224; 3-250; 3-250A; 3-255; 3-271A; 3-276;
All Rough Inspection - Commercial Partial 7/11/2017 07/11/2017
Misc
Partial Correction
06/16/2017
OK TO COVER WHEN READY LIGHT-GAUGE FRAMING & ENCLOSED SYSTEMS AT: HELP DESK AT MAIN COMMONS NW; HELP DESK AT MAIN COMMONS SW;
Above Ceiling Inspection Partial 7/12/2017 7/12/2017 07/12/2017
Misc
Partial Correction
07/07/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; 2-156; 2-157; 2-158; 2-159; 2-160; 2-161; [2-102; 2-104; 2-106; 2-108; 2-111; 2-201; 2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); [2-202; 2-203; 2-204; 2-205; 2-206; 2-250; 2-252; 2-253; 3-153; 3-153A; 3-153B; 3-156B; 3-156C; 4-158; [4-159; 4-160; 4-201; 4-202; 4-203; 4-255; 4-256; 4-258; 4-259; 4-260; 4-262; 4-263; 4-264;
Miscellaneous Inspection Partial 7/13/2017 7/13/2017 07/13/2017
Misc
Partial Correction
07/11/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 104; 105; 106; [102; 103; 202 -- 205; 205A; 205B; 1-101A; 101C; 1-159; 1-159A; 1-164; [1-101; 1-117; 1-118; 1-119; 1-150; 1-152; 1-153; 1-153A; 1-153B; 1-153C; 1-154; 1-155; 1-155B; 1-155C; 1-156B; 1-156C; 1-160; 1-161; 1-162; 1-163; 1-168; 1-201; 1-202; 1-206; 1-207A; 1-208; 1-209; 1-210; 1-212; 1-213; 1-214; 1-215; 1-216; 1-217; 1-219; 1-220; 1-221; 1-222 -- 1-224; 1-250 -- 1-252; 3-102A; 3-103A; 3-105; 3-152; 3-152A; 3-155; 3-155A; 3-157; 3-157B; 3-158; [3-102; 3-103; 3-151B; 3-153; 3-156; 3-156C; 3-157C; 3-159; 3-160; 3-202; 3-203; 3-204A; 3-204B; 3-205; 3-207; 3-208; 3-209; 3-210; 3-211; 3-212; 3-213; 3-214; 3-215; 3-216; 3-217; 3-218; 3-220; 3-221; 3-224; 3-250; 3-250A; 3-255; 3-258; 3-259; 3-271A; 3-276;
Above Ceiling Inspection Partial 7/17/2017 7/17/2017 07/17/2017
Misc
Partial Correction
07/12/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; 2-102; 2-104; 2-106; 2-108; 2-111; 2-156; 2-157; 2-158; 2-159; 2-160; 2-161; [2-107; 2-154; 2-201; 2-202; 2-203; 2-204; 2-205; 2-206; 2-250; 2-252; 2-253; 2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); [2-208; 3-153; 3-153A; 3-153B; 3-156B; 3-156C; 4-158; 4-159; 4-160; [4-101; 4-102; 4-103; 4-150A; 4-150B; 4-157; 4-201; 4-202; 4-203; 4-255; 4-256; 4-258; 4-259; 4-260; 4-262; 4-263; 4-264;
Above Ceiling Inspection Partial 7/18/2017 7/18/2017 07/18/2017
Misc
Partial Correction
07/17/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; 2-102; 2-104; 2-106; 2-107; 2-108; 2-111; 2-154; 2-156; 2-157; 2-158; 2-159; 2-160; 2-161; [2-150; 2-151; 2-201; 2-202; 2-203; 2-204; 2-205; 2-206; 2-208; 2-250; 2-252; 2-253; 2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); 3-153; 3-153A; 3-153B; 3-156B; 3-156C; 4-101; 4-102; 4-103; 4-150A; 4-157; 4-158; 4-150B; 4-159; 4-160; 4-201; 4-202; 4-203; 4-255; 4-256; 4-258; 4-259; 4-260; 4-262; 4-263; 4-264; [4-152A; 4-158; 4-162;
Miscellaneous Inspection Passed 7/19/2017 7/24/2017 07/24/2017
Misc
Partial Correction
07/13/2017
FOLLOWING SPACES ARE NOT APPROVED FOR OCCUPANCY BUT MAY BE USED FOR TEMPORARY STORAGE OF FF&E OR HAVE FURNITURE PLACED IN PERMANENT POSITION: A101B; 102 - 116; A165; A203; A204; A205; A207; C101; C106; C150; C152; C222; C251 - C254; C256; C257; C260 - C270; C272 - C275; C277; C278; 104; 105; 106; [102; 103; 202 -- 205; 205A; 205B; 1-101A; 101C; 1-159; 1-159A; 1-164; [1-101; 1-117; 1-118; 1-119; 1-150; 1-152; 1-153; 1-153A; 1-153B; 1-153C; 1-154; 1-155; 1-155B; 1-155C; 1-156B; 1-156C; 1-160; 1-161; 1-162; 1-163; 1-168; 1-201; 1-202; 1-206; 1-207A; 1-208; 1-209; 1-210; 1-212; 1-213; 1-214; 1-215; 1-216; 1-217; 1-219; 1-220; 1-221; 1-222 -- 1-224; 1-250 -- 1-252; 3-102A; 3-103A; 3-105; 3-152; 3-152A; 3-155; 3-155A; 3-157; 3-157B; 3-158; [3-102; 3-103; 3-151B; 3-153; 3-156; 3-156C; 3-157C; 3-159; 3-160; 3-202; 3-203; 3-204A; 3-204B; 3-205; 3-207; 3-208; 3-209; 3-210; 3-211; 3-212; 3-213; 3-214; 3-215; 3-216; 3-217; 3-218; 3-220; 3-221; 3-224; 3-250; 3-250A; 3-255; 3-258; 3-259; 3-271A; 3-276;
Alarm Test Passed 7/25/2017 07/25/2017
Occupancy Inspection - Fire Temporary C of O 7/25/2017 07/25/2017
Occupancy Inspection - Planning Temporary C of O 7/25/2017 07/25/2017
Corrective Action Required
07/25/2017
Install all landscaping materials per approved landscape plan.
Occupancy Inspection - Codes Commercial Temporary C of O 7/25/2017 7/25/2017 07/25/2017
Misc
Corrective Action Required
07/23/2017
COMPLETE FINISH SITEWORK - RESOLVE ANY PUBLIC WORKS ISSUES - RESOLVE ANY PLANNING ISSUES
Misc
Corrective Action Required
07/23/2017
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
07/23/2017
ROOFTOP: - COMPLETE LIGHTNING PROTECTION SYSTEM - SECURE A/C WHIP TO WALL - FINAL CLEANUP
Misc
Corrective Action Required
07/25/2017
COMPLETE WORK READY FOR FINAL INSPECTION IN: AREAS 1-B AND 1-D. BE ADVISED IF FURNITURE INSTALLATION IS PERFORMED PRESENTLY IN THESE AREAS INSTALLERS ARE AT RISK DUE TO CONTINUING CONSTRUCTION ACTIVITY. GENERAL CONTRACTOR TO ENSURE INSTALLER SAFETY.
Above Ceiling Inspection Passed 7/18/2017 07/26/2017
Misc
Resolved
07/26/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A101C; A118; A119; A153C; A153D; A161; A163; A201 & CORR; A202-205; A207A; A209; A210; A212-216; A220-222; A250-252; A278; RESTROOMS 102 & 103 C101; C102; C102A; C103; C103A; C104; C105; C106; C150; C151; 151A; 151B; C152; C154; C155; C155A; C155B; STAIR 156; C156A; C157B; C159; C202; 203; 204A; 204B; 205; 205B-222; C224; C225; C250A; C252;-257; C260-270; C272-274; C277; 2-102; 2-104; 2-106; 2-107; 2-108; 2-111; 2-154; 2-156; 2-157; 2-158; 2-159; 2-160; 2-161; [2-150; 2-151; 2-201; 2-202; 2-203; 2-204; 2-205; 2-206; 2-208; 2-250; 2-252; 2-253; 2-257; 2-257A; 2-257B; 2-258; 2-259; 2-260; 2-261(D); 3-153; 3-153A; 3-153B; 3-156B; 3-156C; 4-101; 4-102; 4-103; 4-150A; 4-157; 4-158; 4-150B; 4-159; 4-160; 4-201; 4-202; 4-203; 4-255; 4-256; 4-258; 4-259; 4-260; 4-262; 4-263; 4-264; [4-152A; 4-158; 4-162;
All Rough Inspection - Commercial Passed 7/11/2017 07/26/2017
Misc
Resolved
07/26/2017
OK TO COVER WHEN READY LIGHT-GAUGE FRAMING & ENCLOSED SYSTEMS AT: HELP DESK AT MAIN COMMONS NW; HELP DESK AT MAIN COMMONS SW;
In-wall Inspection Passed 6/5/2017 07/26/2017
Misc
Resolved
07/26/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT: STAIRWELL 3-156 1ST LEVEL; WALL "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL AT MAIN STAIR; "BUMP-OUT" AT MAIN COMMONS 1ST LEVEL SOUTHWEST; "BUMP-OUT" AT MAIN COMMONS @ FIRE HOSE CABINET AT 2ND LEVEL SOUTHWEST; SPACE D254; B208; 3-226; AT/ADJACENT TO DOOR OPENING 4-150.1; SHOWER CHASE @ 3-226;
Rated Assembly Inspection Passed 6/20/2017 07/26/2017
Misc
Resolved
07/26/2017
RATED DOOR HEAD ASSEMBLIES PER DETAILS 11/A7.03 & 12/A7.03: OPENING 2-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 4-100.1: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; 2ND LAYER 5/8" TYPE X GWB AT WALLS/BULKHEAD; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT CEILING; 2ND LAYER 5/8" TYPE X GWB AT CEILING; OPENING 2-200: FRAMING & LINER BOARD @ INSIDE(W) FACE; 1ST LAYER 5/8" TYPE X GWB; 2ND LAYER 5/8" TYPE X GWB; OPENING 2-204: WALL FRAMING & LINER BOARD @ INSIDE(W) FACE; WALL 1ST LAYER 5/8" TYPE X GWB; WALL 2ND LAYER 5/8" TYPE X GWB; LID FRAMING & LINER BOARD OK TO COVER AFTER FIRE-STOPPING IS COMPLETED; 1ST & 2ND LAYERS 5/8" TYPE X GWB; FRAMING & LINER BOARD @ N WALL OF B208; OPENING 2-207.1: FRAMING & SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; 2ND LAYER 5/8" TYPE X AT WALLS, BULKHEAD & SOFFIT; FRAMING & SHAFT LINER BOARD AT CEILING; 1ST LAYER 5/8" TYPE X GWB AT LID; 2ND LAYER 5/8" TYPE X GWB AT LID
Rough Framing Inspection - Commercial Passed 6/1/2017 5/17/2017 07/26/2017
Misc
Resolved
07/26/2017
DOOR FRAMES NOW INSTALLED AT OPENINGS 2-205, 4-262, 2-256; 2-201
Underground Electrical Inspection - Commercial Passed 7/7/2017 07/26/2017
Misc
Resolved
07/26/2017
OK TO COVER WHEN READY TRENCHED PVC CONDUIT FOR BOLLARD LIGHTS AT: N OF BLDG EAST OF N ENTRANCE SIDEWALK; S OF BLDG ALONG EDGE OF E-W SIDEWALK COMPLETE FROM E END TO W END;
Occupancy Inspection - Codes Commercial Temporary C of O 7/31/2017 07/31/2017
Misc
Corrective Action Required
07/25/2017
ROOFTOP: - COMPLETE LIGHTNING PROTECTION SYSTEM - SECURE A/C WHIP TO WALL - FINAL CLEANUP
Misc
Corrective Action Required
07/25/2017
COMPLETE ALL REQUIRED ITEMS IN ELECTRICAL ROOMS AND REQUEST RE-INSPECTION: - PERMANENT LABEL PANEL FRONTS - ENSURE ALL C.B. POSITIONS NUMBERED - PLACE PERMANENT PANEL SCHEDULES
Misc
Corrective Action Required
07/25/2017
- RESOLVE FIRE DEPARTMENT ISSUES - RESOLVE PUBLIC WORKS ISSUES - RESOLVE PLANNING ISSUES
Misc
Partial Correction
07/31/2017
PROVIDE COPY OF STATE ELEVATOR INSPECTION CERTIFICATE.
Misc
Corrective Action Required
07/31/2017
ALL AREAS OF BUILDING INCLUDING AREAS 1-B AND 1-D OK FOR OCCUPANCY PENDING COMPLETION AND APPROVAL OF OUTSTANDING ISSUES.
Sewer Service Inspection Passed 8/1/2017 08/01/2017
Occupancy Inspection - Codes Commercial Partial 9/8/2017 9/8/2017 at 1:20 PM 09/08/2017
Misc
Corrective Action Required
07/31/2017
ROOFTOP: - SUBMIT LIGHTNING PROTECTION SYSTEM CERT - FINAL CLEANUP
Misc
Resolved
09/08/2017
COMPLETE ALL REQUIRED ITEMS IN ELECTRICAL ROOMS AND REQUEST RE-INSPECTION: - PERMANENT LABEL PANEL FRONTS - ENSURE ALL C.B. POSITIONS NUMBERED - PLACE PERMANENT PANEL SCHEDULES
Misc
Corrective Action Required
07/31/2017
- RESOLVE FIRE DEPARTMENT ISSUES - RESOLVE PUBLIC WORKS ISSUES - RESOLVE PLANNING ISSUES
Misc
Resolved
09/08/2017
PROVIDE COPY OF STATE ELEVATOR INSPECTION CERTIFICATE.
Misc
Resolved
09/08/2017
ALL AREAS OF BUILDING INCLUDING AREAS 1-B AND 1-D OK FOR OCCUPANCY PENDING COMPLETION AND APPROVAL OF OUTSTANDING ISSUES.
Occupancy Inspection - Fire Passed 9/11/2017 09/11/2017
Occupancy Inspection - Codes Commercial Temporary C of O 9/19/2017 at 2:15 PM 09/19/2017
Misc
Corrective Action Required
09/08/2017
ROOFTOP: - SUBMIT LIGHTNING PROTECTION SYSTEM CERT - FINAL CLEANUP
Misc
Corrective Action Required
09/08/2017
- RESOLVE FIRE DEPARTMENT ISSUES - RESOLVE PUBLIC WORKS ISSUES - RESOLVE PLANNING ISSUES
Occupancy Inspection - Planning Passed 10/24/2017
Investigation Inspection Complete 9/7/2017 10/25/2017
Occupancy Inspection - Codes Commercial Full C of O 10/26/2017 at 11:35 AM 10/26/2017
Misc
Resolved
10/26/2017
ROOFTOP: - SUBMIT LIGHTNING PROTECTION SYSTEM CERT - FINAL CLEANUP
Misc
Resolved
10/26/2017
- RESOLVE FIRE DEPARTMENT ISSUES - RESOLVE PUBLIC WORKS ISSUES - RESOLVE PLANNING ISSUES
Documents & Images
Date Uploaded File Type Document Name
03/09/2016 Letter Codes P/R Corrections Document
04/13/2016 Missouri Innovation Campus Statement of Special Inspection
04/29/2016 Receipt Receipt for transaction: 2016-001424
05/02/2016 Letter Codes Building Permit
05/02/2016 Letter Codes Plan Review Conditions
06/01/2016 Receipt Receipt for transaction: 2016-003179
06/27/2016 Letter Inspection Summary
07/05/2016 Letter Inspection Summary
07/18/2016 Letter Inspection Summary
07/19/2016 Letter Inspection Summary
07/20/2016 Letter Inspection Summary
07/21/2016 Letter Inspection Summary
07/22/2016 Letter Inspection Summary
07/26/2016 Letter Inspection Summary
07/28/2016 Letter Inspection Summary
07/29/2016 Letter Inspection Summary
08/03/2016 Letter Inspection Summary
08/05/2016 Letter Inspection Summary
08/08/2016 Letter Inspection Summary
08/10/2016 Letter Inspection Summary
08/12/2016 Letter Inspection Summary
08/15/2016 Letter Inspection Summary
08/16/2016 Letter Inspection Summary
08/17/2016 Letter Inspection Summary
08/18/2016 Letter Inspection Summary
08/19/2016 Letter Inspection Summary
08/22/2016 Letter Fire (Alarm) Plan Review Notice
08/23/2016 Letter Inspection Summary
08/24/2016 Letter Inspection Summary
08/25/2016 Letter Inspection Summary
08/26/2016 Letter Inspection Summary
08/30/2016 Letter Inspection Summary
09/06/2016 Letter Inspection Summary
09/12/2016 Letter Inspection Summary
09/15/2016 Letter Inspection Summary
09/23/2016 Letter Inspection Summary
09/29/2016 Letter Inspection Summary
09/30/2016 Letter Inspection Summary
10/07/2016 Letter Inspection Summary
10/11/2016 Letter Inspection Summary
10/14/2016 Letter Inspection Summary
10/17/2016 Letter Inspection Summary
10/18/2016 Letter Inspection Summary
10/19/2016 Letter Inspection Summary
10/20/2016 Letter Inspection Summary
10/25/2016 Letter Inspection Summary
10/28/2016 Letter Inspection Summary
11/01/2016 Letter Fire (Sprinkler) Plan Review
11/01/2016 Letter Inspection Summary
11/02/2016 Letter Inspection Summary
11/04/2016 Letter Inspection Summary
11/17/2016 Letter Inspection Summary
11/17/2016 Letter Inspection Summary
12/02/2016 Letter Inspection Summary
12/05/2016 Letter Inspection Summary
12/06/2016 Letter Inspection Summary
12/07/2016 Letter Inspection Summary
12/13/2016 Letter Inspection Summary
12/15/2016 Letter Inspection Summary
12/20/2016 Letter Inspection Summary
12/29/2016 Letter Inspection Summary
01/03/2017 Letter Inspection Summary
01/04/2017 Letter Inspection Summary
01/10/2017 Letter Inspection Summary
01/11/2017 Letter Inspection Summary
01/13/2017 Letter Fire Building Plan Review
01/26/2017 Letter Inspection Summary
01/31/2017 Letter Inspection Summary
01/31/2017 Letter Inspection Summary
02/01/2017 Letter Inspection Summary
02/02/2017 Letter Inspection Summary
02/08/2017 Letter Inspection Summary
02/14/2017 Letter Inspection Summary
02/21/2017 Letter Inspection Summary
02/27/2017 Letter Inspection Summary
03/01/2017 Letter Inspection Summary
03/03/2017 Letter Inspection Summary
03/07/2017 Letter Inspection Summary
03/09/2017 Letter Inspection Summary
03/10/2017 Letter Inspection Summary
03/15/2017 Letter Inspection Summary
03/17/2017 Letter Inspection Summary
03/22/2017 Letter Inspection Summary
03/22/2017 Letter Inspection Summary
03/23/2017 Letter Inspection Summary
03/24/2017 Letter Inspection Summary
03/29/2017 Letter Inspection Summary
03/31/2017 Letter Inspection Summary
04/04/2017 Letter Inspection Summary
04/06/2017 Letter Inspection Summary
04/10/2017 Letter Inspection Summary
04/11/2017 Letter Inspection Summary
04/13/2017 Letter Inspection Summary
04/17/2017 Letter Inspection Summary
04/17/2017 Letter Inspection Summary
04/21/2017 Letter Inspection Summary
04/24/2017 Letter Inspection Summary
04/27/2017 Letter Inspection Summary
05/01/2017 Letter Inspection Summary
05/03/2017 Letter Inspection Summary
05/05/2017 Letter Inspection Summary
05/09/2017 Letter Inspection Summary
05/15/2017 Letter Inspection Summary
05/17/2017 Letter Inspection Summary
05/19/2017 Letter Inspection Summary
05/23/2017 Letter Inspection Summary
05/25/2017 Letter Inspection Summary
05/26/2017 Letter Inspection Summary
05/30/2017 Letter Inspection Summary
06/01/2017 Letter Inspection Summary
06/02/2017 Letter Inspection Summary
06/05/2017 Letter Inspection Summary
06/06/2017 Letter Inspection Summary
06/08/2017 Letter Inspection Summary
06/13/2017 Letter Inspection Summary
06/15/2017 Letter Inspection Summary
06/16/2017 Letter Inspection Summary
06/19/2017 Letter Inspection Summary
06/20/2017 Letter Inspection Summary
06/21/2017 Letter Inspection Summary
06/23/2017 Letter Inspection Summary
06/27/2017 Letter Inspection Summary
06/30/2017 Letter Inspection Summary
07/05/2017 Letter Inspection Summary
07/06/2017 Letter Inspection Summary
07/07/2017 Letter Inspection Summary
07/11/2017 Letter Inspection Summary
07/12/2017 Letter Inspection Summary
07/13/2017 Letter Inspection Summary
07/17/2017 Letter Inspection Summary
07/18/2017 Letter Inspection Summary
07/25/2017 Letter Planning Inspection Summary
07/25/2017 Letter Codes Temporary Certificate of Occupancy
07/31/2017 Letter Codes Temporary Certificate of Occupancy
09/08/2017 Letter Inspection Summary
09/19/2017 Letter Codes Temporary Certificate of Occupancy
10/24/2017 Letter Planning Inspection Summary
10/26/2017 Letter Field Certificate of Occupancy
10/27/2017 Letter Codes Final Certificate of Occupancy
11/13/2017 Letter Lightning Protection Services
11/06/2018 Letter DOC110618-11062018110142
09/24/2019 Missouri Innovative Campus
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home