Permit Application Status

PRCOM20152951


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20152951
Building Permit - Commercial
Certificate of Occupancy
SOUTHSIDE PLAZA LLC
CHANGE OF TENANT
CHANGE OF TENANT TO NEW PHYSICAL THERAPY BUSINESS
12/28/2015
04/05/2016
07/05/2016
05/19/2016
Locations
Contacts
KNAPP PHYSICAL THERAPY, Address:806 SW BLUE PKWY, Phone:(816) 272-1427  
SOUTHSIDE PLAZA LLC, Address:215 W 77TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 02/10/2016 02/03/2016
Joe Frogge
NEC - Patient Care - Grounding of receptacles
Resolved
02/03/2016

2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B).(A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118.(B) Insulated Equipment Grounding Conductor.(1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A).1. The grounding terminals of all receptacles.2. Metal Boxes and enclosures containing receptacles.3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts.(refer code for exceptions)(2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122.Action required: Modify drawings to show that all circuits in exam rooms will have redundant ground system. Action required: The rooms designated at Physical Therapy Treatment rooms qualify as patient care rooms therefore the electrical systems must comply with stated code section. This work can be attached to this permit or a separate permit can be issued to your licensed electrical contractor. 2/3/16 - rooms designated as "treatment" have been changed to meeting rooms.
Licensed Contractors Approved 02/03/2016 02/03/2016
Joe Frogge
LC - MEP Subs
Resolved
02/03/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed Electrical Contractor. 2/3/16 - no electrical work
Fire Plan Review Approved with Conditions 02/10/2016 02/03/2016
Joe Frogge
Misc
Corrective Action Required
02/03/2016

Existing exit and emergency lighting was not shown on the drawings. All existing fixtures shall be operational and additional fixtures may be required as determined at inspection.
Portable fire extinguishers - general
Corrective Action Required
02/03/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. A minimum of two, 2A:10B:C fire extinguishers shall be provided at conspicuous locations (near exits). Verified at inspection.
Building Plan Review Rejected 01/08/2016 01/07/2016
Joe Frogge
NEC - Patient Care - Grounding of receptacles
Corrective Action Required
01/07/2016

2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B).(A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118.(B) Insulated Equipment Grounding Conductor.(1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A).1. The grounding terminals of all receptacles.2. Metal Boxes and enclosures containing receptacles.3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts.(refer code for exceptions)(2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122.Action required: Modify drawings to show that all circuits in exam rooms will have redundant ground system. Action required: The rooms designated at Physical Therapy Treatment rooms qualify as patient care rooms therefore the electrical systems must comply with stated code section. This work can be attached to this permit or a separate permit can be issued to your licensed electrical contractor.
Fire Plan Review Approved with Conditions 01/08/2016 12/30/2015
Jim Eden
Misc
Corrective Action Required
12/30/2015

Existing exit and emergency lighting was not shown on the drawings. All existing fixtures shall be operational and additional fixtures may be required as determined at inspection.
Portable fire extinguishers - general
Corrective Action Required
12/30/2015

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. A minimum of two, 2A:10B:C fire extinguishers shall be provided at conspicuous locations (near exits). Verified at inspection.
Licensed Contractors Rejected 01/08/2016 12/28/2015
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/07/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed Electrical Contractor.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $30.00 $30.00 Paid 04/05/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Not Ready 4/7/2016 4/7/2016 04/07/2016
Misc
Corrective Action Required
04/07/2016
NOT READY FOR OCCUPANCY INSPECTION. FURNITURE BLOCKING ACCESS FOR TESTING OF ELECTRICAL RECEPTACLES. RECEPTACLES MUST BE FULLY ACCESSIBLE WITH NOTHING PLUGGED-IN IN ORDER FOR FINAL INSPECTION TO BE PERFORMED. ALL ROOMS/SPACES MUST BE ACCESSIBLE FOR UNOBSTRUCTED INSPECTION. CALL 816/969-1200 TWO DAYS IN ADVANCE TO REQUEST OCCUPANCY INSPECTION.
Occupancy Inspection - Fire Not Ready 4/7/2016 04/07/2016
Occupancy Inspection - Codes Commercial Temporary C of O 4/29/2016 4/29/2016 04/29/2016
Misc
Corrective Action Required
04/07/2016
NEC 408.4 ELECTRICAL SERVICE PANEL: ENSURE ALL CIRCUIT POSITIONS ARE PROPERLY LABELED. MUST BE LEGIBLE, COMPLETE, CURRENT, SPECIFIC. IF PANEL SCHEDULE IS USED NUMBER POSITIONS ON PANEL FRONT PER SCHEDULE. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE".
Occupancy Inspection - Fire Passed 4/29/2016 04/29/2016
Occupancy Inspection - Codes Commercial Full C of O 5/19/2016 5/19/2016 05/19/2016
Misc
Resolved
05/19/2016
NEC 408.4 ELECTRICAL SERVICE PANEL: ENSURE ALL CIRCUIT POSITIONS ARE PROPERLY LABELED. MUST BE LEGIBLE, COMPLETE, CURRENT, SPECIFIC. IF PANEL SCHEDULE IS USED NUMBER POSITIONS ON PANEL FRONT PER SCHEDULE. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE".
Investigation Inspection Complete 5/20/2016 05/22/2016
Documents & Images
Date Uploaded File Type Document Name
01/07/2016 Letter Codes P/R Corrections Document
02/03/2016 Letter Codes Plan Review Conditions
04/05/2016 Letter Codes Building Permit
04/05/2016 Receipt Receipt for transaction: 2016-000992
04/07/2016 Letter Inspection Summary
04/19/2016 Letter Codes 10 Day Letter
04/29/2016 Letter Codes Temporary Certificate of Occupancy
05/19/2016 Letter Field Certificate of Occupancy
05/20/2016 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home