Permit Application Status

PRCOM20152917


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20152917
Building Permit - Commercial
Final Completion
CATHOLIC DIOCESE OF KC-ST JOE
ALTERATION COMMERCIAL
NEW TYPE II HOOD
12/21/2015
01/27/2016
06/19/2016
02/08/2016
Locations
Contacts
LOUCO INDUSTRIES INC, Address:7412 NE 160TH TER, Phone:(816) 532-6263  
ALLIED ELECTRICAL CONSTRUCTION INC, Address:13416 HORSESHOE DR W, Phone:(816) 532-4446  
CATHOLIC DIOCESE OF KC-ST JOE, Address:130 NE MURRAY RD  
LATONA ARCHITECTS, Address:1600 GENESSEE , Phone:(816) 305-8800  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/20/2016 01/27/2016
Joe Frogge
LC - General Contractor
Resolved
01/20/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
01/27/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/20/16 - Crown Kitchen Contractors must obtain a Lee's Summit business license as a Mechanical Contractor.
Licensed Contractors Approved 01/04/2016 01/27/2016
Joe Frogge
LC - General Contractor
Corrective Action Required
12/21/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
12/21/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 01/27/2016 01/20/2016
Joe Dir
Misc
Corrective Action Required
01/20/2016

FD has no comments on the type II hood installation.
Building Plan Review Approved 01/27/2016 01/20/2016
Joe Frogge
Misc
Resolved
01/20/2016

Inadequate information. Action required: Provide electrical design or detailed scope of work that includes methods and materials.
Fire Plan Review Approved with Conditions 01/04/2016 12/22/2015
Joe Dir
Misc
Corrective Action Required
12/22/2015

FD has no comments on the type II hood installation.
Building Plan Review Rejected 01/04/2016 12/21/2015
Joe Frogge
Health Dept Inspection
Resolved
12/30/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/30/15 - not required per JCHD
Health Dept Review
Resolved
12/30/2015

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required: This comment is for information purposes. 12/30/15 - not required per JCHD
Misc
Corrective Action Required
12/21/2015

Inadequate information. Action required: Provide electrical design or detailed scope of work that includes methods and materials.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $30.00 $30.00 Paid 01/27/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Hood/Duct Inspection Failed 2/5/2016 02/05/2016
Misc
Corrective Action Required
02/05/2016
3" HOOD CLEARANCE AT SIDEWALL NOT PROVIDED PER APPROVED DRAWING A01.
Hood/Duct Inspection Passed 2/8/2016 02/08/2016
Misc
Resolved
02/08/2016
3" HOOD CLEARANCE AT SIDEWALL NOT PROVIDED PER APPROVED DRAWING A01.
Final Mechanical Inspection Passed 2/8/2016 02/08/2016
Documents & Images
Date Uploaded File Type Document Name
12/22/2015 Letter Fire Building Plan Review
12/22/2015 Letter Final Plan Review Conditions
12/22/2015 Letter Codes P/R Corrections Document
01/20/2016 Letter Fire Building Plan Review
01/27/2016 Receipt Receipt for transaction: 2016-000220
01/27/2016 Letter Codes Building Permit
02/05/2016 Letter Inspection Summary
02/08/2016 Letter from Architect
02/08/2016 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home