Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
07/08/2015
|
|
Joe Dir
|
|
Misc
Corrective Action Required
No FD Comments
|
|
|
Licensed Contractors
|
Approved
|
06/19/2015
|
06/02/2015
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
|
|
|
Licensed Contractors
|
Rejected
|
05/14/2015
|
06/02/2015
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
|
|
|
Building Plan Review
|
Approved
|
05/28/2015
|
05/20/2015
|
|
Joe Frogge
|
|
Miscellaneous Correction
2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010.
Action required: Update drawings to demonstrate compliance.
5/15/15 - specification note in question has not changed.
5/20/15 - plans corrected
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/28/2015
|
05/20/2015
|
|
Development Center
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide alarm plans for any work done to the system
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Provide addressing on all doors leading into the space
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Submit sprinkler plans for approval for any work done to the system
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Provide a 5lb ABC type extinguisher
|
|
Misc
Corrective Action Required
5/18/15 No further FD comments
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/21/2015
|
05/18/2015
|
|
Brian Austerman
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide alarm plans for any work done to the system
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Provide addressing on all doors leading into the space
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Submit sprinkler plans for approval for any work done to the system
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Provide a 5lb ABC type extinguisher
|
|
Misc
Corrective Action Required
5/18/15 No further FD comments
|
|
|
Building Plan Review
|
Rejected
|
05/21/2015
|
05/15/2015
|
|
Joe Frogge
|
|
Misc
Incomplete information.
Action required: Label use of each space. Room north of storage not identified.
5/15/15 - labelled as office on new plans
|
|
Misc 13
ICC A117.1-209 Section 303 Changes in Level
303.1 General. Changes in level in floor surfaces hall comply with Section 303.
Action required: Provide section cut at floor material change (VCT to Wood) to verify compliance with code section cited.
5/15/15 - detail added and compliant
|
|
Misc 14
2012 IBC 2408.3 Gymnasiums and basketball courts. Glazing in multipurpose gymnasiums, basketball courts and similar athletic facilities subject to human impact loads shall comply with Category II of CPSC 16 CFR Part 1201 or Class A of ANSI Z97.1.
Action required: Specify compliant glazing where facing open gym area.
5/15/15 - clarification note added to drawings
|
|
Bldg - Accessibility - Where required 1103.1
2012 IBC 1109.9 Storage. Where fixed or built-in storage elements such as cabinets, coat hooks, shelves, medicine cabinets, lockers, closets and drawers are provided in required accessible spaces, at least 5 percent, but not less than one of each type shall be accessible.
Action required: Modify drawings to demonstrate compliance.
5/15/15 - note added to drawings
|
|
Miscellaneous Correction
Corrective Action Required
2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010.
Action required: Update drawings to demonstrate compliance.
5/15/15 - specification note in question has not changed.
|
|
|
Building Plan Review
|
Rejected
|
05/05/2015
|
05/04/2015
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
Incomplete information.
Action required: Label use of each space. Room north of storage not identified.
|
|
Misc 13
Corrective Action Required
ICC A117.1-209 Section 303 Changes in Level
303.1 General. Changes in level in floor surfaces hall comply with Section 303.
Action required: Provide section cut at floor material change (VCT to Wood) to verify compliance with code section cited.
|
|
Misc 14
Corrective Action Required
2012 IBC 2408.3 Gymnasiums and basketball courts. Glazing in multipurpose gymnasiums, basketball courts and similar athletic facilities subject to human impact loads shall comply with Category II of CPSC 16 CFR Part 1201 or Class A of ANSI Z97.1.
Action required: Specify compliant glazing where facing open gym area.
|
|
Bldg - Accessibility - Where required 1103.1
Corrective Action Required
2012 IBC 1109.9 Storage. Where fixed or built-in storage elements such as cabinets, coat hooks, shelves, medicine cabinets, lockers, closets and drawers are provided in required accessible spaces, at least 5 percent, but not less than one of each type shall be accessible.
Action required: Modify drawings to demonstrate compliance.
|
|
Miscellaneous Correction
Corrective Action Required
2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010.
Action required: Update drawings to demonstrate compliance.
|
|
|
Licensed Contractors
|
Rejected
|
05/05/2015
|
05/04/2015
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/05/2015
|
04/23/2015
|
|
Brian Austerman
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide alarm plans for any work done to the system
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Provide addressing on all doors leading into the space
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Submit sprinkler plans for approval for any work done to the system
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Provide a 5lb ABC type extinguisher
|
|
|
Zoning Review
|
Approved
|
05/05/2015
|
04/23/2015
|
|
Joe Frogge
|
|
|