Summary
PRCOM20150391
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW OTHER (COMMERCIAL)
IRRIGATION PERMIT - SUBMETER OFF OF MAIN DOMESTIC SERVICE
03/03/2015
05/29/2015
08/30/2015
12/15/2015
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 S MAIN  
CENTRAL MISSOURI LANDSCAPING, Address:407 E RUSSELL AVE, Phone:(660) 409-8181  
RESIDENCES AT NEW LONGVIEW LLC, Address:5015 NW CANAL ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Rejected 03/03/2015 03/03/2015
Joe Frogge
Building Plan Review Rejected 03/17/2015 03/03/2015
Mike Weisenborn
Misc
Corrective Action Required
03/03/2015

Blow up detail of the Irrigation tap after the city meter vault showing the irrigation tap, backflow location and submeter location. Action required - Provide additional information for review.
Misc
Corrective Action Required
03/03/2015

The irrigation system can be used for lawn irrigation only. There can be no connection or means of connection to any other water features or uses, such as yard hydrants, fountains, ponds, etc. Action required - This comment is for information purposes.
Misc
Corrective Action Required
03/03/2015

The plans call for a reduced pressure backflow assembly. If the irrigation system will not have chemicals injected into it, then a double check assembly is all that is required. If the Reduced Pressure assembly is used, it must be installed a minimum of 12” above grade in a locked heated enclosure. A reduced pressure assembly cannot be installed in pit. Action required - Make needed corrections.
Misc
Corrective Action Required
03/03/2015

The submeter is not provided by Water Utilities. It is a privately owned meter that must be maintained by the owner. Any failure of the submeter will result in a credit based on actual meter reads. There will be no estimation during the time period of a failure. Action required - This is for information purposes.
Misc
Corrective Action Required
03/03/2015

The submeter should be located after the main irrigation backflow prevention assembly. Action required - This comment is for information purposes.
Misc
Corrective Action Required
03/03/2015

The sumbeter should be a Badger, Hersey or Sensus Omni. It should be a radio read equipped meter with an Itron 60W or 100W ERT. Action required - This comment is for information purposes.
Misc
Corrective Action Required
03/03/2015

A submeter inspection will need to be called for through the water department prior to any backfilling so that the irrigation tap and installed submeter can be inspected . We will begin the sewer credit based on the read on the meter at the time of inspection. Please call 816-969-1911 or 816-969-1930 to schedule the inspection. Action required - This comment is for information purposes.
Misc
Corrective Action Required
03/03/2015

There is a $50 annual fee for the submeter to encompass meter reads and processing. Action required - This comment is for information purposes.
Miscellaneous Correction
Corrective Action Required
03/03/2015

The sewer credit is totaled annually and applied as one annual credit to the water bill. Action required - This comment is for information purposes.
Review completed by Ben Haskamp. - Mike Weisenborn 03/03/2015 10:16 AM
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $90.16 $90.16 Paid 05/29/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Commercial Passed 12/15/2015
Documents & Images
Date Uploaded File Type Document Name
03/03/2015 Letter Codes P/R Corrections Document
05/29/2015 Letter Codes Building Permit
05/29/2015 Receipt Receipt for transaction: 2015-001972
06/01/2015 Right of Way Form DOC060115
12/15/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home