Permit Application Status

PRCOM20150051


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20150051
Building Permit - Commercial
Certificate of Occupancy
200 NE MISSOURI DRIVE HOLDINGS LLC
CHANGE OF TENANT
CHANGE OF TENANT FOR MEDICAL OFFICES - SUITE 200
01/12/2015
01/28/2015
07/22/2015
06/08/2015
Locations
Contacts
MID-AMERICA CONTRACTORS INC, Address:1400 IRON, Phone:(816) 221-4516  
LBA AIR CONDITIONING, HEATING AND PLUMBING INC, Address:6850 W 47TH TER, Phone:(913) 268-6822  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
200 NE MISSOURI DRIVE HOLDINGS LLC, Address:5956 SHERRY LANE STE 1201, Phone:(301) 255-4872  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/31/2015
Joe Dir
Sprinkler Plan Review Released for Construction 12/31/2015
Joe Dir
Fire Plan Review Approved with Conditions 03/31/2015
Brian Austerman
Portable fire extinguishers - general
Corrective Action Required
03/31/2015

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 5lb ABC type extinguisher for every 3,000 sq/ft or for every 75' of travel distance, if not existing
Construction documents - Fire protection systems
Corrective Action Required
03/31/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans showing any work done to the system
Construction documents for fire alarm systems
Corrective Action Required
03/31/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans showing any work done to system
Misc
Corrective Action Required
03/31/2015

All existing and new exit signs/emergency lights shall be in good working order at time of inspection. For information only
Licensed Contractors Approved 01/23/2015 01/23/2015
Joe Frogge
LC - MEP Subs
Resolved
01/23/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed Mechanical Contractor.
Building Plan Review Approved 01/23/2015 01/23/2015
Joe Frogge
Fire Plan Review Approved with Conditions 01/23/2015 01/20/2015
Brian Austerman
Misc
Corrective Action Required
01/20/2015

All existing and new exit signs/emergency lights shall be in good working order at time of inspection. For information only
Construction documents for fire alarm systems
Corrective Action Required
01/20/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans showing any work done to system
Construction documents - Fire protection systems
Corrective Action Required
01/20/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans showing any work done to the system
Portable fire extinguishers - general
Corrective Action Required
01/20/2015

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 5lb ABC type extinguisher for every 3,000 sq/ft or for every 75' of travel distance, if not existing
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $658.85 $658.85 Paid 01/28/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Not Ready 2/17/2015 2/17/2015 at 12:00 AM 02/17/2015
Misc
Corrective Action Required
02/17/2015
LSCO SEC 7-142; IBC 106: PERMIT DRAWINGS NOT FOUND ON SITE. NO INSPECTIONS WITHOUT CITY-STAMPED PERMIT PRINTS.
Misc
Corrective Action Required
02/17/2015
NOTE: NEC 334-10 SECURING / SUPPORT OF MC ELECTRICAL CABLE: SECURE WITHIN 12" OF BOXES AND SUPPORT AT 6' MAX INTERVALS THEREAFTER. COLORADO JIMS DO NOT SECURE MC TO RESIST TUGGING. USE CLAMPS THAT FASTEN MC IN PLACE WITHIN 12" OF BOX ENTRY.
In-wall Inspection Passed 2/18/2015 2/18/2015 at 12:00 AM 02/18/2015
Misc
Resolved
02/18/2015
LSCO SEC 7-142; IBC 106: PERMIT DRAWINGS NOT FOUND ON SITE. NO INSPECTIONS WITHOUT CITY-STAMPED PERMIT PRINTS.
Misc
Resolved
02/18/2015
NOTE: NEC 334-10 SECURING / SUPPORT OF MC ELECTRICAL CABLE: SECURE WITHIN 12" OF BOXES AND SUPPORT AT 6' MAX INTERVALS THEREAFTER. COLORADO JIMS DO NOT SECURE MC TO RESIST TUGGING. USE CLAMPS THAT FASTEN MC IN PLACE WITHIN 12" OF BOX ENTRY.
Above Ceiling Inspection Failed 2/18/2015 at 12:00 AM 02/18/2015
Misc
Corrective Action Required
02/18/2015
FASTENING OF LIGHT-GAUGE STEEL STUDS ACTING IN TENSION: SCREW BOTH FLANGES TO TOP TRACKS. SEE AT ATRIUM SOFFIT.
Above Ceiling Inspection Partial 2/19/2015 2/19/2015 at 12:00 AM 02/19/2015
Misc
Partial Correction
02/19/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: HANGING SOFFIT @ ATRIUM;
Above Ceiling Inspection Failed 3/3/2015 3/3/2015 at 12:00 AM 03/03/2015
Misc
Partial Correction
02/19/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: HANGING SOFFIT @ ATRIUM;
Misc
Corrective Action Required
03/03/2015
SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT: SEE INSTRUCTION SHEET IN EACH BOX OF MATERIAL. CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS.
Misc
Corrective Action Required
03/03/2015
COMPLETE MC CABLE TERMINATIONS AND MAKE-UP OF J-BOXES. CLOSE ALL UNUSED OPENINGS.
Misc
Corrective Action Required
03/03/2015
DIRECTION REQUIRED OF A/E RE R/A BOOTS NOT SUPPORTED BY WALLS.
Above Ceiling Inspection Partial 3/5/2015 at 12:00 AM 03/05/2015
Misc
Partial Correction
03/03/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: HANGING SOFFIT @ ATRIUM;
Misc
Resolved
03/05/2015
SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT: SEE INSTRUCTION SHEET IN EACH BOX OF MATERIAL. CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS.
Misc
Resolved
03/05/2015
COMPLETE MC CABLE TERMINATIONS AND MAKE-UP OF J-BOXES. CLOSE ALL UNUSED OPENINGS.
Misc
Corrective Action Required
03/03/2015
REMOVE R/A BOOTS NOT SUPPORTED BY WALLS UNLESS OTHERWISE DIRECTED IN WRITING BY A/E.
Misc
Corrective Action Required
03/05/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AFTER R/A BOOT ISSUE IS RESOLVED AND ABANDONED BRACES AND HANGERS HAVE BEEN REMOVED OR BENT UP TO CLEAR GRID BY MINIMUM 18".
Misc
Corrective Action Required
03/05/2015
ENSURE ALL SPRINKLER F.P. DROPS ARE COMPLETED.
Above Ceiling Inspection Passed 3/16/2015 3/16/2015 at 12:00 AM 03/16/2015
Misc
Resolved
03/16/2015
REMOVE R/A BOOTS NOT SUPPORTED BY WALLS UNLESS OTHERWISE DIRECTED IN WRITING BY A/E.
Misc
Resolved
03/16/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: HANGING SOFFIT @ ATRIUM;
Misc
Resolved
03/16/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AFTER R/A BOOT ISSUE IS RESOLVED AND ABANDONED BRACES AND HANGERS HAVE BEEN REMOVED OR BENT UP TO CLEAR GRID BY MINIMUM 18".
Misc
Resolved
03/16/2015
ENSURE ALL SPRINKLER F.P. DROPS ARE COMPLETED.
Final Inspection - Commercial Partial 3/17/2015 3/18/2015 at 12:00 AM 03/18/2015
Misc
Partial Correction
03/18/2015
MODIFICATIONS OF PHASE 1 AREA OK FOR USE AND OCCUPANCY THROUGH MAY 21, 2015. SUBSEQUENT CONSTRUCTION PHASE TO RENOVATE BREAK ROOM PLANNED TO BEGIN MID-APRIL 2015.
Occupancy Inspection - Fire Temporary C of O 3/17/2015 at 12:00 AM 03/25/2015
Misc
Corrective Action Required
03/25/2015
- ceiling tile and sprinkler head eschutiions need to be installed - Emergency lighting throughout need battery packs replaced
Alarm Test Passed 3/17/2015 at 12:00 AM 03/25/2015
In-wall Inspection Passed 4/21/2015 at 12:00 AM 04/21/2015
Occupancy Inspection - Codes Commercial Temporary C of O 5/18/2015 5/18/2015 at 12:00 AM 05/18/2015
Misc
Corrective Action Required
05/18/2015
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
05/18/2015
CHECK ELECTRICAL PANELS. ENSURE PANEL SCHEDULES ARE CURRENT, COMPLETE, AS SPECIFIC AS POSSIBLE, AND LEGIBLE.
Alarm Test Passed 5/18/2015 at 12:00 AM 05/18/2015
Occupancy Inspection - Fire Temporary C of O 5/18/2015 at 12:00 AM 05/18/2015
Misc
Corrective Action Required
03/25/2015
- ceiling tile and sprinkler head eschutiions need to be installed - Emergency lighting throughout need battery packs replaced
Occupancy Inspection - Codes Commercial Full C of O 6/8/2015 at 12:00 AM 06/08/2015
Misc
Resolved
06/08/2015
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Resolved
06/08/2015
CHECK ELECTRICAL PANELS. ENSURE PANEL SCHEDULES ARE CURRENT, COMPLETE, AS SPECIFIC AS POSSIBLE, AND LEGIBLE.
Occupancy Inspection - Fire Passed 6/8/2015 at 12:00 AM 06/08/2015
Misc
Corrective Action Required
05/18/2015
- ceiling tile and sprinkler head eschutiions need to be installed - Emergency lighting throughout need battery packs replaced
Documents & Images
Date Uploaded File Type Document Name
01/20/2015 Letter Fire Building Plan Review
01/23/2015 Letter Codes P/R Corrections Document
01/23/2015 Letter Codes Plan Review Conditions
01/28/2015 Letter Codes Building Permit
01/28/2015 Receipt Receipt for transaction: 2015-000126
02/17/2015 Letter Inspection Summary
02/18/2015 Letter Inspection Summary
02/19/2015 Letter Inspection Summary
03/03/2015 Letter Inspection Summary
03/05/2015 Letter Inspection Summary
03/16/2015 Letter Inspection Summary
03/18/2015 Letter Inspection Summary
03/31/2015 Letter Fire Building Plan Review
04/21/2015 Letter Inspection Summary
05/18/2015 Letter Codes Temporary Certificate of Occupancy
06/08/2015 Letter Field Certificate of Occupancy
06/09/2015 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home