Summary
PRCOM20143407
Building Permit - Commercial
Final Completion
DACUR INVESTMENT COMPANY INC
ALTERATION COMMERCIAL
FACADE REMODEL
12/15/2014
03/31/2015
09/15/2015
Locations
Contacts
ARC GENERAL CONTRACTING, Address:7833 BARTON ST, Phone:(913) 492-8008  
ROZIER ELECTRIC, Address:1608 SW JEFFERSON ST, Phone:(816) 246-9000  
AMAI ARCHITECTURE, Address:1510 WALNUT, Phone:(816) 994-5900  
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/29/2014 03/31/2015
Development Center
LC - General Contractor
Corrective Action Required
12/18/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
12/18/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Building Plan Review Approved 12/29/2014 12/18/2014
Joe Frogge
Fire Plan Review Approved 12/29/2014 12/17/2014
Brian Austerman
Misc
Corrective Action Required
12/17/2014

Provide correct address on plans. Plans shao 1700 NW Chipman, should be addressed off Oldham. No further FD comments
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $671.60 $671.60 Paid 03/31/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 6/10/2015 at 12:00 AM 06/10/2015
Misc
Partial Correction
06/10/2015
NO ISSUES FOUND ON FRAMING FOR FACIA MODIFICATIONS AT NORTH ELEVATION (MAZUMA) AND EAST ELEVATION FROM MAZUMA SOUTH TO STAINED GLASS STATION;
Rough Framing Inspection - Commercial Partial 6/11/2015 at 12:00 AM 06/11/2015
Misc
Partial Correction
06/10/2015
NO ISSUES FOUND ON FRAMING FOR FACIA MODIFICATIONS AT NORTH ELEVATION (MAZUMA) AND EAST ELEVATION FROM MAZUMA SOUTH TO STAINED GLASS STATION;
Rough Framing Inspection - Commercial Partial 6/12/2015 at 12:00 AM 06/12/2015
Misc
Partial Correction
06/11/2015
NO ISSUES FOUND ON FRAMING FOR FACIA MODIFICATIONS AT NORTH ELEVATION (MAZUMA) AND EAST ELEVATION FROM MAZUMA SOUTH TO STAINED GLASS STATION;
Footing Inspection - Commercial Partial 6/17/2015 (8:00) 6/17/2015 at 12:00 AM 06/17/2015
Misc
Partial Correction
06/17/2015
OK TO POUR WHEN READY COLUMN FOOTING ENLARGEMENTS AT FOLLOWING COLUMN LINE LOCATIONS: AJ; AK; BQ; BR. TOPS OF EXISTING FOOTINGS AT U & V ARE NEAR SIDEWALK SUBGRADE, SO ARE DEEMED NOT REQUIRED TO BE ENLARGED.
Rough Framing Inspection - Commercial Partial 6/24/2015 6/24/2015 at 12:00 AM 06/24/2015
Misc
Partial Correction
06/24/2015
NEW FRAMING AT ENTRANCE TO UNIT 242 TO BE RE-INSPECTED INCLUDING FRAMING AT ROOF.
Rough Framing Inspection - Commercial Partial 6/25/2015 6/25/2015 at 12:00 AM 06/25/2015
Misc
Partial Correction
06/24/2015
OK TO COVER WHEN READY FRAMING OF NEW ENTRANCE TOWERS INCLUDING FRAMING AT ROOF AT LOCATIONS: BQ-BR; AJ-AK;
Rough Framing Inspection - Commercial Partial 7/2/2015 7/2/2015 at 12:00 AM 07/02/2015
Rough Framing Inspection - Commercial Partial 7/6/2015 at 12:00 AM 07/06/2015
Rough Framing Inspection - Commercial Partial 7/7/2015 at 12:00 AM 07/07/2015
Rough Framing Inspection - Commercial Partial 7/10/2015 7/10/2015 at 12:00 AM 07/10/2015
Misc
Partial Correction
07/10/2015
OK TO COVER WHEN READY FRAMING OF NEW ENTRANCE TOWERS INCLUDING FRAMING AT ROOF AT LOCATIONS: BQ-BR; AJ-AK; U-V
Misc
Partial Correction
07/10/2015
FACIA FRAMING MODIFICATIONS/ADDITIONS OK TO COVER.
Misc
Partial Correction
07/10/2015
FRAMING OF COLUMN WRAPS OK TO COVER.
Footing Inspection - Commercial Passed 6/17/2015 at 12:00 AM 07/15/2015
Misc
Resolved
07/15/2015
OK TO POUR WHEN READY COLUMN FOOTING ENLARGEMENTS AT FOLLOWING COLUMN LINE LOCATIONS: AJ; AK; BQ; BR. TOPS OF EXISTING FOOTINGS AT U & V ARE NEAR SIDEWALK SUBGRADE, SO ARE DEEMED NOT REQUIRED TO BE ENLARGED.
Rough Framing Inspection - Commercial Passed 7/10/2015 at 12:00 AM 07/15/2015
Misc
Resolved
07/15/2015
OK TO COVER WHEN READY FRAMING OF NEW ENTRANCE TOWERS INCLUDING FRAMING AT ROOF AT LOCATIONS: BQ-BR; AJ-AK; U-V
Misc
Resolved
07/15/2015
FACIA FRAMING MODIFICATIONS/ADDITIONS OK TO COVER.
Misc
Resolved
07/15/2015
FRAMING OF COLUMN WRAPS OK TO COVER.
Above Ceiling Inspection Partial 8/10/2015 8/10/2015 at 12:00 AM 08/10/2015
Misc
Partial Correction
08/10/2015
COURTESY VISIT TO PLAN SEQUENCE OF COVERING SOFFIT
Above Ceiling Inspection Passed 8/20/2015 8/20/2015 at 12:00 AM 08/20/2015
Misc
Resolved
08/20/2015
COURTESY VISIT TO PLAN SEQUENCE OF COVERING SOFFIT
Final Inspection - Commercial Passed 9/14/2015 at 12:00 AM 09/14/2015
Occupancy Inspection - Fire Passed 12/31/2015
Documents & Images
Date Uploaded File Type Document Name
12/17/2014 Letter Fire Building Plan Review
12/18/2014 Letter Codes P/R Corrections Document
03/31/2015 Letter Codes Building Permit
03/31/2015 Receipt Receipt for transaction: 2015-000506
06/10/2015 Letter Inspection Summary
06/17/2015 Letter Inspection Summary
06/25/2015 Letter Inspection Summary
07/10/2015 Letter Inspection Summary
08/20/2015 Letter Inspection Summary
09/14/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home