Permit Application Status

PRCOM20142676


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20142676
Building Permit - Commercial
Final Completion
ERIC DEAN ENTERPRISES INC
CHANGE OF TENANT
INTERIOR ALTERATIONS FOR CHANGE OF TENANT - SUITE 202A
09/19/2014
10/09/2014
03/23/2015
11/13/2014
Locations
Contacts
3 SQUARE CONTRACTING INC, Address:1243 MERRIAM LANE, Phone:(913) 754-3033  
BOWERS ELECTRIC LLC, Address:720 S ROGERS RD, STE C200, Phone:(913) 530-8003  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201  
ERIC DEAN ENTERPRISES INC, Address:255 NW BLUE PKWY  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 10/01/2014 10/09/2014
Joe Frogge
License Tax Application
Resolved
10/02/2014

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment for informational purposes. received - 10/2/14
Misc
Resolved
10/09/2014

Additional information required to complete review. Action required: Provided detailed scope of work for electrical portion of project. Scope to include all methods and materials. Letter received 10/9/14
Licensed Contractors Approved 10/01/2014 10/02/2014
Joe Frogge
LC - MEP Subs
Resolved
10/02/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved 10/01/2014 09/24/2014
Brian Austerman
Misc
Corrective Action Required
09/24/2014

No FD comments
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $61.28 $61.28 Paid 10/09/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 10/14/2014 10/14/2014 at 12:00 AM 10/14/2014
Misc
Corrective Action Required
10/14/2014
SOUTH JAMB STUD AT DOOR OPENING DOES NOT EXTEND TO TOP TRACK. SCREW BOTH FLANGES OF JAMB STUDS AND CRIPPLES ABOVE DOOR FRAME TOP AND BOTTOM.
Misc
Partial Correction
10/14/2014
OK TO COVER WALLS AT LOBBY AND AT OFFICE 7 EXCEPT AT/ABOVE DOOR FRAME.
In-wall Inspection Passed 10/15/2014 10/15/2014 at 12:00 AM 10/15/2014
Misc
Resolved
10/15/2014
SOUTH JAMB STUD AT DOOR OPENING DOES NOT EXTEND TO TOP TRACK. SCREW BOTH FLANGES OF JAMB STUDS AND CRIPPLES ABOVE DOOR FRAME TOP AND BOTTOM.
Misc
Resolved
10/15/2014
OK TO COVER WALLS AT LOBBY AND AT OFFICE 7 EXCEPT AT/ABOVE DOOR FRAME.
Above Ceiling Inspection Passed 10/31/2014 10/31/2014 at 12:00 AM 10/31/2014
Final Inspection - Commercial Passed 11/7/2014 11/7/2014 at 12:00 AM 11/07/2014
Occupancy Inspection - Fire Passed 11/7/2014 11/7/2014 at 12:00 AM 11/12/2014
Documents & Images
Date Uploaded File Type Document Name
09/24/2014 Letter Fire Building Plan Review
09/24/2014 Letter Codes P/R Corrections Document
10/09/2014 Letter Codes Plan Review Conditions
10/09/2014 Elec scope of work
10/09/2014 Letter Codes Building Permit
10/09/2014 Receipt Receipt for transaction: 2014-001957
10/14/2014 Letter Inspection Summary
10/15/2014 Letter Inspection Summary
10/31/2014 Letter Inspection Summary
11/07/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home