Permit Application Status

PRCOM20142405


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20142405
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS FOR NEW MRI AND ASSOCIATED ROOMS
08/22/2014
08/28/2014
10/20/2014
Locations
Contacts
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
ACI-BOLAND, Address:1421 EAST 104TH STREET, SUITE 100, Phone:(816) 763-9600  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 11/12/2014
Brian Austerman
Fire Plan Review Approved 09/04/2014 10/17/2014
Brian Austerman
Misc
Corrective Action Required
10/17/2014

Plan review for Phase 2 remodel of MRI#2 room, MRI#2 equipment room and Bone Density room. No further fire dept comments
Sprinkler Plan Review Released for Construction 10/06/2014
Brian Austerman
Misc
Corrective Action Required
10/06/2014

Sprinkler plan review for the MRI suites. No FD comments
Building Plan Review Approved 09/04/2014 08/27/2014
Joe Frogge
Fire Plan Review Approved 09/04/2014 08/25/2014
Brian Austerman
Construction documents for fire alarm systems
Corrective Action Required
08/25/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. If alterations to the alarm system are required submit plans for approval
Construction documents - Fire protection systems
Corrective Action Required
08/25/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. If alterations to the sprinkler system are required submit plans for approval
Licensed Contractors Approved 09/04/2014 08/22/2014
Joe Frogge
Misc
Corrective Action Required
11/12/2014

Released without FD comment
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $2,893.56 $2,893.56 Paid 08/28/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 9/3/2014 9/3/2014 at 12:00 AM 09/03/2014
Misc
Partial Correction
09/03/2014
OK TO COVER WHEN READY FRAMING FOR DOUBLE WALL AT S WALL OF 1C215B PER NOTE 27 SHEET A1.0
In-wall Inspection Partial 9/26/2014 9/26/2014 at 12:00 AM 09/26/2014
Misc
Partial Correction
09/26/2014
OK TO COVER WHEN READY MODIFICATIONS AND ADDITIONS OF WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C215; 215A; 215B; 129/131;
In-wall Inspection Partial 9/29/2014 9/29/2014 at 12:00 AM 09/29/2014
Misc
Partial Correction
09/26/2014
OK TO COVER WHEN READY MODIFICATIONS AND ADDITIONS OF WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C215; 215A; 215B; 129/131; 183A;
In-wall Inspection Partial 9/30/2014 9/30/2014 at 12:00 AM 09/30/2014
Misc
Partial Correction
09/29/2014
OK TO COVER WHEN READY MODIFICATIONS AND ADDITIONS OF WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C215; 215A; 215B; 129/131; 183A; 183A;
In-wall Inspection Partial 9/30/2014 at 12:00 AM 09/30/2014
Misc
Partial Correction
09/30/2014
OK TO COVER WHEN READY MODIFICATIONS AND ADDITIONS OF WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C215; 215A; 215B; 129/131; 183A; 183B;
Above Ceiling Inspection Partial 10/8/2014 10/8/2014 at 12:00 AM 10/08/2014
Misc
Partial Correction
10/08/2014
OK TO CLOSE CEILINGS AT 1C215 AND 215A EXCEPT ONE TILE WHERE EXHAUST DUCTWORK HAS YET TO BE COMPLETED
Above Ceiling Inspection Passed 10/13/2014 10/13/2014 at 12:00 AM 10/13/2014
Misc
Resolved
10/13/2014
OK TO CLOSE CEILINGS AT 1C215 AND 215A EXCEPT ONE TILE WHERE EXHAUST DUCTWORK HAS YET TO BE COMPLETED
Alarm Test Passed 10/14/2014 at 12:00 AM 10/14/2014
In-wall Inspection Passed 9/30/2014 at 12:00 AM 10/14/2014
Misc
Resolved
10/14/2014
OK TO COVER WHEN READY MODIFICATIONS AND ADDITIONS OF WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C215; 215A; 215B; 129/131; 183A; 183B;
Occupancy Inspection - Fire Temporary C of O 10/16/2014 at 12:00 AM 10/16/2014
Misc
Corrective Action Required
10/16/2014
-storage room IC221 - permanetly locate the alarm notification device in the corridor -breakroom C183A make sure the smoke detector in the breakroom is secured in the ceiling once the ceiling tile is replaced
Occupancy Inspection - Codes Commercial Partial 10/16/2014 10/16/2014 at 12:00 AM 10/16/2014
Misc
Resolved
10/16/2014
FINISH PLUMBING TO BE COMPLETED IN 1C183A & 183B
Misc
Resolved
10/16/2014
ELECT RECEPT ABOVE SINK IN 1C215A TO BE GFCI PROTECTED
Misc
Resolved
10/16/2014
RESOLVE FIRE DEPARTMENT ISSUES
Final Inspection - Commercial Partial 10/16/2014 at 12:00 AM 10/16/2014
Misc
Corrective Action Required
10/16/2014
ELECT RECEPT ABOVE SINK IN 1C215A TO BE GFCI PROTECTED
Misc
Corrective Action Required
10/16/2014
FINISH PLUMBING TO BE COMPLETED IN 1C183A & 183B
Misc
Corrective Action Required
10/16/2014
RESOLVE FIRE DEPARTMENT ISSUES
In-wall Inspection Partial 10/24/2014 10/24/2014 at 12:00 AM 10/24/2014
Misc
Partial Correction
10/24/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C100; 101;
Above Ceiling Inspection Partial 11/6/2014 11/6/2014 at 12:00 AM 11/06/2014
Misc
Partial Correction
11/06/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101
In-wall Inspection Partial 11/11/2014 11/11/2014 at 12:00 AM 11/11/2014
Misc
Partial Correction
10/24/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C100; 101; 1C141: 1ST STAGE OF FRAMING AND IN-WALL SYSTEMS AT OUTER WALL; FRAMING AT WALL OPENINGS AND DUCT PENETRATIONS TO BE COMPLETED AS PART OF SUBSEQUENT STAGE.
Final Inspection - Commercial Partial 10/17/2014 at 12:00 AM 11/12/2014
Misc
Resolved
10/17/2014
ELECT RECEPT ABOVE SINK IN 1C215A TO BE GFCI PROTECTED
Misc
Resolved
10/17/2014
FINISH PLUMBING TO BE COMPLETED IN 1C183A & 183B
Misc
Resolved
10/17/2014
RESOLVE FIRE DEPARTMENT ISSUES
Final Inspection - Commercial Partial 11/13/2014 11/13/2014 at 12:00 AM 11/13/2014
Misc
Partial Correction
11/13/2014
FOLLOWING SPACES OK FOR USE & OCCUPANCY: 1C124; 131; 183A; 183B; 215; 215A; 215B; 221; [100; 101 OK CONTINGENT ON FIRE DEPARTMENT APPROVAL
Occupancy Inspection - Fire Temporary C of O 11/13/2014 at 12:00 AM 11/14/2014
Misc
Corrective Action Required
10/20/2014
-storage room IC221 - permanetly locate the alarm notification device in the corridor -breakroom C183A make sure the smoke detector in the breakroom is secured in the ceiling once the ceiling tile is replaced
Above Ceiling Inspection Partial 11/21/2014 11/21/2014 at 12:00 AM 11/21/2014
Misc
Partial Correction
11/06/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101;
Misc
Partial Correction
11/21/2014
PRELIMINARY INSPECTION OF SYSTEMS ABOVE MRI ENCLOSURE: 1) REMOVE ANY REMAINING ABANDONED HANGERS AND MATERIALS 2) ENSURE ALL ELECTRICAL BOXES ARE DIRECTLY SUPPORTED TO STRUCTURE
Underslab Plumbing Inspection - Commercial Partial 11/25/2014 11/25/2014 at 12:00 AM 11/25/2014
Misc
Partial Correction
11/25/2014
-FLOOR DRAIN FOR MECHANICAL ROOM, MRI SUITE
In-wall Inspection Partial 12/3/2014 12/3/2014 at 12:00 AM 12/03/2014
Misc
Partial Correction
11/11/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C100; 101; 1C141/141A AFTER 4 BOCA PLATES ARE INSTALLED AT E WALL TOP PLATE TO PROTECT COPPER PIPE PENETRATING PLATE; 142 S & W WALLS; 143; 160 S & E(AFTER FRAMING IS PROPERLY COMPLETED AT NEW DOOR FRAME);
In-wall Inspection Partial 12/5/2014 12/5/2014 at 12:00 AM 12/05/2014
Misc
Partial Correction
12/03/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C100; 101; 140; 141/141A; 142; 143; 146; 160;
Above Ceiling Inspection Partial 12/12/2014 12/12/2014 at 12:00 AM 12/12/2014
Misc
Partial Correction
11/21/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101; 16" CEILING TIE-IN AT 1C146 EAST;
Misc
Partial Correction
11/21/2014
PRELIMINARY INSPECTION OF SYSTEMS ABOVE MRI ENCLOSURE: 1) REMOVE ANY REMAINING ABANDONED HANGERS AND MATERIALS 2) ENSURE ALL ELECTRICAL BOXES ARE DIRECTLY SUPPORTED TO STRUCTURE
In-wall Inspection Partial 12/16/2014 12/16/2014 at 12:00 AM 12/16/2014
Misc
Partial Correction
12/05/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C100; 101; 140; 141/141A; 142; 143; 146; 160; IN-FILL OF MRI MAGNET ACCESS OPENINGS AT SW CORRIDOR WALL & AT NEW MRI ROOM SOUTH WALL
Above Ceiling Inspection Not Ready 12/23/2014 12/23/2014 at 12:00 AM 12/23/2014
Misc
Partial Correction
12/12/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101; 16" CEILING TIE-IN AT 1C146 EAST;
Misc
Partial Correction
12/12/2014
PRELIMINARY INSPECTION OF SYSTEMS ABOVE MRI ENCLOSURE: 1) REMOVE ANY REMAINING ABANDONED HANGERS AND MATERIALS 2) ENSURE ALL ELECTRICAL BOXES ARE DIRECTLY SUPPORTED TO STRUCTURE
Misc
Corrective Action Required
12/23/2014
160: 1) REMOVE ABANDONED MATERIALS E.G. STRAP HANGER 2) WHEREVER POSSIBLE STRAP OR ZIP-TIE MC CABLE WITHIN 12" OF ENTRY TO J-BOXES 143: COMPLETE ALL ABOVE-CEILING WORK AND REMOVE TEMP ELECTRICAL WIRING. CUT ABANDONED MC CABLE RUNS BACK TO WALL PLANE. HVAC FLEX CONNECTOR TIED OFF??
Above Ceiling Inspection Partial 12/24/2014 at 12:00 AM 12/24/2014
Misc
Partial Correction
12/23/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101; 16" CEILING TIE-IN AT 1C146 EAST; 160; ALCOVE ADJACENT TO 160 OK TO COVER AFTER TWO J-BOXES ARE FULLY MADE-UP AND CLOSED.
Misc
Resolved
12/24/2014
PRELIMINARY INSPECTION OF SYSTEMS ABOVE MRI ENCLOSURE: 1) REMOVE ANY REMAINING ABANDONED HANGERS AND MATERIALS 2) ENSURE ALL ELECTRICAL BOXES ARE DIRECTLY SUPPORTED TO STRUCTURE
Misc
Resolved
12/24/2014
160: 1) REMOVE ABANDONED MATERIALS E.G. STRAP HANGER 2) WHEREVER POSSIBLE STRAP OR ZIP-TIE MC CABLE WITHIN 12" OF ENTRY TO J-BOXES 143: COMPLETE ALL ABOVE-CEILING WORK AND REMOVE TEMP ELECTRICAL WIRING. CUT ABANDONED MC CABLE RUNS BACK TO WALL PLANE. HVAC FLEX CONNECTOR TIED OFF??
Final Inspection - Commercial Partial 12/24/2014 12/24/2014 at 12:00 AM 12/24/2014
Misc
Partial Correction
11/13/2014
FOLLOWING SPACES OK FOR USE & OCCUPANCY: 1C100; 101; 124; 131; 183A; 183B; 215; 215A; 215B; 221; [160 & ADJACENT ALCOVE OK CONTINGENT ON FIRE DEPARTMENT APPROVAL
Above Ceiling Inspection Partial 1/5/2015 1/5/2015 at 12:00 AM 01/05/2015
Misc
Partial Correction
12/24/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101; 16" CEILING TIE-IN AT 146 EAST; 160; ALCOVE ADJACENT TO 160; AFFECTED AREAS IN 140, 143, 146;
Above Ceiling Inspection Partial 1/8/2015 1/8/2015 at 12:00 AM 01/08/2015
Misc
Partial Correction
01/05/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C100; 101; 16" CEILING TIE-IN AT 146 EAST; 160; ALCOVE ADJACENT TO 160; AFFECTED AREAS IN 140, 143, 146; 141; 142
Final Inspection - Commercial Partial 1/8/2015 1/8/2015 at 12:00 AM 01/08/2015
Misc
Resolved
01/08/2015
-storage room IC221 - permanetly locate the alarm notification device in the corridor -breakroom C183A make sure the smoke detector in the breakroom is secured in the ceiling once the ceiling tile is replaced
Misc
Partial Correction
01/08/2015
FOLLOWING SPACES OK FOR USE & OCCUPANCY: 1C100; 101; 124; 131; 183A; 183B; 215; 215A; 215B; 221; 160 & ADJACENT ALCOVE; AREA AFFECTED AT 140/143/146 OK FOR PLACEMENT OF FURNITURE. TESTING OF EMERGENCY CIRCUIT ELECTRICAL RECEPTACLES SUBJECT TO VERIFICATION.
Alarm Test Passed 1/22/2015 01/22/2015
Occupancy Inspection - Fire Passed 1/23/2015 at 12:00 AM 01/23/2015
Final Inspection - Commercial Passed 1/23/2015 1/23/2015 at 12:00 AM 01/23/2015
Misc
Resolved
01/23/2015
FOLLOWING SPACES OK FOR USE & OCCUPANCY: 1C100; 101; 124; 131; 183A; 183B; 215; 215A; 215B; 221; 160 & ADJACENT ALCOVE; AREA AFFECTED AT 140/143/146 OK FOR PLACEMENT OF FURNITURE. TESTING OF EMERGENCY CIRCUIT ELECTRICAL RECEPTACLES SUBJECT TO VERIFICATION.
Occupancy Inspection - Fire Passed 1/8/2015 at 12:00 AM 12/31/2015
Misc
Corrective Action Required
12/24/2014
-storage room IC221 - permanetly locate the alarm notification device in the corridor -breakroom C183A make sure the smoke detector in the breakroom is secured in the ceiling once the ceiling tile is replaced
Documents & Images
Date Uploaded File Type Document Name
08/25/2014 Letter Fire Building Plan Review
08/27/2014 Letter Codes Plan Review Conditions
08/28/2014 Receipt Receipt for transaction: 2014-001661
08/28/2014 Letter Codes Building Permit
09/03/2014 Letter Inspection Summary
09/26/2014 Letter Inspection Summary
09/29/2014 Letter Inspection Summary
09/30/2014 Letter Inspection Summary
10/06/2014 Letter Fire (Sprinkler) Plan Review
10/08/2014 Letter Inspection Summary
10/13/2014 Letter Inspection Summary
10/16/2014 Letter Fire Loss Reduction Form
10/16/2014 Letter Inspection Summary
10/17/2014 Letter Inspection Summary
10/17/2014 Letter Fire Building Plan Review
10/24/2014 Letter Inspection Summary
11/06/2014 Letter Inspection Summary
11/11/2014 Letter Inspection Summary
11/13/2014 Letter Inspection Summary
11/17/2014 Letter Fire (Sprinkler) Plan Review
11/21/2014 Letter Inspection Summary
11/25/2014 Letter Inspection Summary
12/05/2014 Letter Inspection Summary
12/12/2014 Letter Inspection Summary
12/23/2014 Letter Inspection Summary
12/24/2014 Letter Inspection Summary
01/05/2015 Letter Inspection Summary
01/08/2015 Letter Inspection Summary
01/23/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home