Permit Application Status

PRCOM20142240


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20142240
Building Permit - Commercial
Final Completion
ADAMS FAMILY INVESTMENTS LLLP
ADDITION COMMERCIAL
RENOVATION OF CAR DEALERSHIP - INCLUDES INTERIOR ALTERATIONS AS WELL AS NEW ENTRY PORTAL AND NEW CAR DELIVERY AREA.
08/11/2014
09/02/2014
02/10/2015
04/16/2015
Locations
Contacts
PALMER ELECTRIC CO, Address:6600 ROYAL ST, BLDG B, Phone:(816) 479-2587  
ADAMS FAMILY INVESTMENTS LLLP, Address:501 NE COLBERN RD  
CROSSLAND CONSTRUCTION COMPANY INC, Address:PO BOX 45, Phone:(620) 429-1414  
AIRTECH ENGINEERING, Address:9265 FLINT ST, Phone:(913) 888-5900  
YAEGER ARCHITECTURE, Address:7780 WEST 119TH STREET, Phone:(913) 742-8000  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/31/2014
Joe Dir
Sprinkler Plan Review Released for Construction 10/13/2014
Brian Austerman
Misc
Corrective Action Required
10/13/2014

No fire department comments, released for construction 10/13/2014
Licensed Contractors Approved 08/20/2014 09/02/2014
Development Center
License contractors
Corrective Action Required
08/20/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Business License
Corrective Action Required
08/20/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Final Development Plan Review Approved 08/29/2014 08/26/2014
Joe Frogge
Building Plan Review Approved 09/03/2014 08/26/2014
Joe Frogge
Final Development Plan
Resolved
08/26/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Misc
Resolved
08/25/2014

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections.
Misc
Resolved
08/20/2014

Trench drains. Action required: Provide plumbing design. 8/20/14 - trenches are receptacles only and not attached to sewer
Fire Plan Review Approved with Conditions 08/27/2014 08/20/2014
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
08/20/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for alterations to the system
Construction documents - Fire protection systems
Corrective Action Required
08/20/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans if work to system is required
Building Plan Review Rejected 08/25/2014 08/14/2014
Joe Frogge
Final Development Plan
Corrective Action Required
08/14/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Misc
Corrective Action Required
08/14/2014

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections.
Misc
Corrective Action Required
08/14/2014

Trench drains. Action required: Provide plumbing design.
Licensed Contractors Rejected 08/25/2014 08/14/2014
Joe Frogge
License contractors
Corrective Action Required
08/14/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Business License
Corrective Action Required
08/14/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fire Plan Review Approved with Conditions 08/25/2014 08/13/2014
Brian Austerman
Construction documents for fire alarm systems
Corrective Action Required
08/13/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for alterations to the system
Construction documents - Fire protection systems
Corrective Action Required
08/13/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans if work to system is required
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $3,488.86 $3,488.86 Paid 09/02/2014
8331507-Sewer Connection Fee $30.00 $30.00 Paid 09/02/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 9/23/2014 (8:00) 9/23/2014 at 12:00 AM 09/23/2014
Misc
Partial Correction
09/23/2014
PORTAL FOOTING OFF 8 LINE APPROVED TO POUR.
Footing Inspection - Commercial Partial 10/6/2014 (10:00) 10/6/2014 at 12:00 AM 10/06/2014
Misc
Partial Correction
10/06/2014
PORTAL FOOTING OFF 8 LINE APPROVED TO POUR
Misc
Partial Correction
10/06/2014
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 8/A.9 TO 8/A.3 TO 6/A.3 TO 6/A.9;
Foundation Inspection - Commercial Passed 10/21/2014 (2:00) 10/21/2014 at 12:00 AM 10/21/2014
Above Ceiling Inspection Failed 12/19/2014 at 12:00 AM 12/19/2014
Misc
Corrective Action Required
12/19/2014
HANGING SOFFIT IN SHOWROOM 102 @ 5/C--5/D: DIAGONAL BRACING NOT PER APPROVED DRAWING.
Above Ceiling Inspection Partial 12/22/2014 at 12:00 AM 12/22/2014
Misc
Partial Correction
12/22/2014
OK TO COVER WHEN READY FRAMING AND CONCEALED SYSTEMS AT: HANGING SOFFIT IN SHOWROOM 102 @ 5/C--5/D;
Above Ceiling Inspection Failed 12/30/2014 at 12:00 AM 12/30/2014
Misc
Resolved
12/30/2014
OK TO COVER WHEN READY FRAMING AND CONCEALED SYSTEMS AT: HANGING SOFFIT IN SHOWROOM 102 @ 5/C--5/D;
Misc
Corrective Action Required
12/30/2014
PERIMETER FRAMING UNDER NORTH CANOPY: FULLY SCREW ALL FLANGE CONNECTIONS AT TENSION STUDS.
Above Ceiling Inspection Partial 12/31/2014 12/31/2014 at 12:00 AM 12/31/2014
Misc
Partial Correction
12/31/2014
PERIMETER FRAMING UNDER NORTH CANOPY OK TO COVER WHEN READY.
In-wall Inspection Partial 1/9/2015 1/9/2015 at 12:00 AM 01/09/2015
Misc
Partial Correction
01/09/2015
FRAMING AND CONCEALED ELECTRICAL WIRING AT VIDEO SECTION AT SPACE 102 SOUTH WALL PER C3/A810 OK TO COVER WHEN READY.
Above Ceiling Inspection Partial 1/12/2015 at 12:00 AM 01/12/2015
Misc
Partial Correction
12/31/2014
PERIMETER FRAMING UNDER NORTH CANOPY OK TO COVER WHEN READY.
Above Ceiling Inspection Partial 1/13/2015 at 12:00 AM 01/13/2015
Misc
Partial Correction
01/12/2015
OK TO COVER WHEN READY: PERIMETER FRAMING UNDER NORTH CANOPY; TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6;
Above Ceiling Inspection Partial 1/16/2015 1/16/2015 at 12:00 AM 01/16/2015
Misc
Partial Correction
01/13/2015
OK TO COVER WHEN READY: PERIMETER FRAMING UNDER NORTH CANOPY; TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5;
Above Ceiling Inspection Partial 1/23/2015 at 12:00 AM 01/23/2015
Misc
Resolved
01/23/2015
OK TO COVER WHEN READY: PERIMETER FRAMING UNDER NORTH CANOPY; TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5;
Misc
Partial Correction
01/23/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING LOCATIONS: TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5; CEILING 11'-9" AFF @ 111B;
In-wall Inspection Partial 1/13/2015 at 12:00 AM 01/23/2015
Misc
Resolved
01/13/2015
FRAMING AND CONCEALED ELECTRICAL WIRING AT VIDEO SECTION AT SPACE 102 SOUTH WALL PER C3/A810 OK TO COVER WHEN READY.
Misc
Partial Correction
01/13/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: BUSINESS LOUNGE EAST WALL;
In-wall Inspection Partial 1/23/2015 1/23/2015 at 12:00 AM 01/23/2015
Misc
Partial Correction
01/13/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: BUSINESS LOUNGE EAST WALL; OFC 153 ALL WALLS BOTH FACES
Above Ceiling Inspection Partial 1/23/2015 1/23/2015 at 12:00 AM 01/23/2015
Corrective Action Required
01/23/2015
Above Ceiling Inspection Partial 2/10/2015 at 12:00 AM 02/10/2015
Misc
Partial Correction
01/23/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING LOCATIONS: TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5; CEILING 11'-9" AFF @ 111B;
Misc
Partial Correction
02/10/2015
OK TO COVER WHEN READY FRAMING AND ABOVE-CEILING SYSTEMS FOR GWB DROPS & HANGING SOFFITS AT: CUSTOMER LOUNGE 145;
Misc
Partial Correction
02/10/2015
OK TO COVER WHEN READY CEILING FRAMING FOR WOOD TILE AND ABOVE-CEILING SYSTEMS AT: MEDIA CABINET AREA IN 810; NOTE: FOLLOW SPECIAL SUPPORT REQUIREMENTS, IF ANY, PROVIDED IN WOOD TILE MANUFACTURER'S INSTRUCTIONS
Above Ceiling Inspection Partial 2/20/2015 2/20/2015 at 12:00 AM 02/20/2015
Misc
Partial Correction
02/10/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING LOCATIONS: TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5; CEILING 11'-9" AFF @ 111B; CUSTOMER LOUNGE 145 ARC DESK AREA;
Misc
Partial Correction
02/10/2015
OK TO COVER WHEN READY FRAMING AND ABOVE-CEILING SYSTEMS FOR GWB DROPS & HANGING SOFFITS AT: CUSTOMER LOUNGE 145;
Misc
Partial Correction
02/10/2015
OK TO COVER WHEN READY CEILING FRAMING FOR WOOD TILE AND ABOVE-CEILING SYSTEMS AT: MEDIA CABINET AREA IN 810; NOTE: FOLLOW SPECIAL SUPPORT REQUIREMENTS, IF ANY, PROVIDED IN WOOD TILE MANUFACTURER'S INSTRUCTIONS
Footing Inspection - Commercial Passed 10/6/2014 at 12:00 AM 02/24/2015
Misc
Resolved
02/24/2015
PORTAL FOOTING OFF 8 LINE APPROVED TO POUR
Misc
Resolved
02/24/2015
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 8/A.9 TO 8/A.3 TO 6/A.3 TO 6/A.9;
Above Ceiling Inspection Partial 2/27/2015 2/27/2015 at 12:00 AM 02/27/2015
Misc
Partial Correction
02/20/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING LOCATIONS: TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5; CEILING 11'-9" AFF @ 111B; CUSTOMER LOUNGE 145 ARC DESK AREA;
Misc
Partial Correction
02/20/2015
OK TO COVER WHEN READY FRAMING AND ABOVE-CEILING SYSTEMS FOR GWB DROPS & HANGING SOFFITS AT: CUSTOMER LOUNGE 145;
Misc
Partial Correction
02/20/2015
OK TO COVER WHEN READY CEILING FRAMING FOR WOOD TILE AND ABOVE-CEILING SYSTEMS AT: MEDIA CABINET AREA IN 810; HIGH CEILING AT CENTER OF CUSTOMER LOUNGE 145 NOTE: FOLLOW SPECIAL SUPPORT REQUIREMENTS, IF ANY, PROVIDED IN WOOD TILE MANUFACTURER'S INSTRUCTIONS
Sprinkler - Hydrostatic Test Passed 3/2/2015 at 9:30 AM 04/03/2015
Final Inspection - Commercial Partial 4/6/2015 at 12:00 AM 04/06/2015
Misc
Partial Correction
04/06/2015
FD HAS NO REMAINING ISSUES. NO CODES ISSUES EXCEPT LICENSE TAX IS DUE AND OWING.
Alarm Test Passed 4/6/2015 at 12:00 AM 04/06/2015
Occupancy Inspection - Fire Passed 4/6/2015 at 12:00 AM 04/06/2015
Above Ceiling Inspection Passed 2/27/2015 at 12:00 AM 04/13/2015
Misc
Resolved
04/13/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING LOCATIONS: TILE "CLOUD" CENTERED AT E.5/6; GWB "CLOUD" CENTERED AT D.3/6; TILE "CLOUDS" CENTERED AT B.5/5.4 & C.5/5; CEILING 11'-9" AFF @ 111B; CUSTOMER LOUNGE 145 ARC DESK AREA;
Misc
Resolved
04/13/2015
OK TO COVER WHEN READY FRAMING AND ABOVE-CEILING SYSTEMS FOR GWB DROPS & HANGING SOFFITS AT: CUSTOMER LOUNGE 145;
Misc
Resolved
04/13/2015
OK TO COVER WHEN READY CEILING FRAMING FOR WOOD TILE AND ABOVE-CEILING SYSTEMS AT: MEDIA CABINET AREA IN 810; HIGH CEILING AT CENTER OF CUSTOMER LOUNGE 145 NOTE: FOLLOW SPECIAL SUPPORT REQUIREMENTS, IF ANY, PROVIDED IN WOOD TILE MANUFACTURER'S INSTRUCTIONS
In-wall Inspection Passed 2/10/2015 1/23/2015 at 12:00 AM 04/13/2015
Final Inspection - Commercial Passed 4/13/2015 at 12:00 AM 04/13/2015
Misc
Resolved
04/13/2015
FD HAS NO REMAINING ISSUES. NO CODES ISSUES EXCEPT LICENSE TAX IS DUE AND OWING.
Occupancy Inspection - Planning Passed 04/15/2015
Documents & Images
Date Uploaded File Type Document Name
08/13/2014 Letter Fire Building Plan Review
08/14/2014 Letter Codes P/R Corrections Document
09/02/2014 Letter Codes Plan Review Conditions
09/02/2014 Letter Codes Building Permit
09/02/2014 Receipt Receipt for transaction: 2014-001691
09/23/2014 Letter Inspection Summary
10/06/2014 Letter Inspection Summary
10/13/2014 Letter Fire (Sprinkler) Plan Review
10/21/2014 Letter Inspection Summary
12/19/2014 Letter Inspection Summary
12/22/2014 Letter Inspection Summary
12/30/2014 Letter Inspection Summary
12/31/2014 Letter Inspection Summary
01/09/2015 Letter Inspection Summary
01/13/2015 Letter Inspection Summary
01/16/2015 Letter Inspection Summary
01/23/2015 Letter Inspection Summary
02/10/2015 Letter Inspection Summary
02/20/2015 Letter Inspection Summary
02/27/2015 Letter Inspection Summary
04/06/2015 Letter Inspection Summary
04/13/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home