Permit Application Status

PRCOM20141292


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20141292
Building Permit - Commercial
Certificate of Occupancy
ROCKY TOP HOLDINGS LLC
NEW TENANT FINISH
TENANT FINISH FOR MASSAGE THERAPY
05/20/2014
06/16/2014
12/13/2014
09/02/2014
Locations
Contacts
PHOENIX CONSTRUCTION INC, Address:1305 HOLLY CT, Phone:(816) 716-8208  
OLIPHANTS HEATING & COOLING, Address:208 WOLLARD BLVD  
BRADLEY-READE INC, Address:810 W 7TH AVE, Phone:(816) 898-2947  
MAYES PLUMBING INC, Address:501 S MCCLEARY RD STE A, Phone:(816) 792-5400  
SCHARHAG ARCHITECTS, Address:310 ARMOUR RD #202, Phone:(816) 221-9297  
ROCKY TOP HOLDINGS LLC, Address:244 W MILL ST STE 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/13/2014
Brian Austerman
Misc
Corrective Action Required
06/13/2014

Maintain a minimum of a 4" spacing from sprinkler hear to wall in corridor
Misc
Corrective Action Required
06/13/2014

If there is an isolation valve for the space is shall be maked accordingly
Licensed Contractors Approved 06/02/2014 06/13/2014
Khanh Nguyen
Building Plan Review Approved with Conditions 06/16/2014 06/13/2014
Joe Frogge
Misc
Resolved
06/13/2014

2012 IBC 410.4 Platform construction. Permanent platforms shall be constructed of materials as required for the type of construction of the building in which the permanent platform is located. Permanent platforms are permitted to be constructed of fire-retardant woods for Types I, II and IV construction where the platforms are not more than 30 inches above the main floor, and not more than one-third of the room or floor area and not more than 3,000 square feet in area. Where the space beneath the permanent platform is used for storage or any purpose other than equipment, wiring or plumbing, the floor assembly shall be not less than 1-hour fire-resistance-rated construction. Where the space beneath the permanent platform is used only for equipment, wiring or plumbing, the underside of the permanent platform need not be protected. Action required: Update drawing to show compliance. If wood is used for platform construction it must be fire-retardant treated. 6/13/14 - drawing updated
Misc
Resolved
06/13/2014

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. 6/13/14 - drawing updated
Misc
Resolved
06/13/2014

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Modify drawings to show that break room counter and sink are accessible. 6/13/14 - drawing updated
Misc
Resolved
06/13/2014

2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers are no longer an acceptable method of water hammer protection. Modify drawings to show acceptable method. 6/13/14 - drawing updated
Misc
Corrective Action Required
06/09/2014

Specialized equipment. Action required: This comment is for informational purposes. Special use equipment must be Listed and installed be listing. Manufacturer's installation instructions must be on site for inspections.
Licensed Contractors Approved 06/09/2014 06/13/2014
Joe Frogge
Fire Plan Review Approved with Conditions 06/16/2014 06/10/2014
Brian Austerman
Misc
Resolved
06/13/2014

Add an exterior emergency light at the rear entrance, if not existing 6/10/14 SHOWN ON PLANS
Portable fire extinguishers - general
Corrective Action Required
06/09/2014

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 2A10B:C extinguisher (5 lb) ACKNOWLEDGED
Construction documents - Fire protection systems
Corrective Action Required
06/09/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for any alterations made to the system
Construction documents for fire alarm systems
Corrective Action Required
06/09/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans if modifications to interior notification are required
Building Plan Review Rejected 06/02/2014 05/29/2014
Joe Frogge
Misc
Corrective Action Required
05/29/2014

2012 IBC 410.4 Platform construction. Permanent platforms shall be constructed of materials as required for the type of construction of the building in which the permanent platform is located. Permanent platforms are permitted to be constructed of fire-retardant woods for Types I, II and IV construction where the platforms are not more than 30 inches above the main floor, and not more than one-third of the room or floor area and not more than 3,000 square feet in area. Where the space beneath the permanent platform is used for storage or any purpose other than equipment, wiring or plumbing, the floor assembly shall be not less than 1-hour fire-resistance-rated construction. Where the space beneath the permanent platform is used only for equipment, wiring or plumbing, the underside of the permanent platform need not be protected. Action required: Update drawing to show compliance. If wood is used for platform construction it must be fire-retardant treated.
Misc
Corrective Action Required
05/29/2014

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
Misc
Corrective Action Required
05/29/2014

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Modify drawings to show that break room counter and sink are accessible.
Misc
Corrective Action Required
05/29/2014

2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers are no longer an acceptable method of water hammer protection. Modify drawings to show acceptable method.
Misc
Corrective Action Required
05/29/2014

Specialized equipment. Action required: This comment is for informational purposes. Special use equipment must be Listed and installed be listing. Manufacturer's installation instructions must be on site for inspections.
Fire Plan Review Approved with Conditions 06/02/2014 05/21/2014
Brian Austerman
Misc
Corrective Action Required
05/21/2014

Add an exterior emergency light at the rear entrance, if not existing
Portable fire extinguishers - general
Corrective Action Required
05/21/2014

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 2A10B:C extinguisher (5 lb)
Construction documents - Fire protection systems
Corrective Action Required
05/21/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for any alterations made to the system
Construction documents for fire alarm systems
Corrective Action Required
05/21/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans if modifications to interior notification are required
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $232.87 $232.87 Paid 06/16/2014
$232.87
8331506-EFHB Maybrook, Full $213.05 $213.05 Paid 06/16/2014
$213.05
8331507-Sewer Connection Fee $150.00 $150.00 Paid 06/16/2014
$150.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 6/19/2014 6/19/2014 at 12:00 AM 06/19/2014
Electrical Service Inspection Passed 6/19/2014 6/19/2014 at 12:00 AM 06/19/2014
In-wall Inspection Partial 6/19/2014 6/19/2014 at 12:00 AM 06/19/2014
Misc
Corrective Action Required
06/19/2014
-WET VENT IS FOR THE BATH GROUP ONLY, NOT FOR BOTH RESTROOM AND BREAK RM SINK -INSTALL BACKINGS FOR GRAB BARS **OK TO ROCK EXCEPT THE RESTROOM WALL
In-wall Inspection Passed 6/24/2014 at 12:00 AM 06/24/2014
Misc
Resolved
06/24/2014
-WET VENT IS FOR THE BATH GROUP ONLY, NOT FOR BOTH RESTROOM AND BREAK RM SINK -INSTALL BACKINGS FOR GRAB BARS **OK TO ROCK EXCEPT THE RESTROOM WALL
Above Ceiling Inspection Partial 8/15/2014 8/15/2014 at 12:00 AM 08/15/2014
Misc
Corrective Action Required
08/15/2014
-SEAL DUCT JOINTS AT MAIN DUCT & COMPLETE BATH EXHAUST TO OUTSIDE -INDEPENDENT SUPPORT WIRE FOR THE MC CABLE MUST BE: SECURED AT BOTH END AND COLOR-ID
Misc
Corrective Action Required
08/21/2014
- treatment room 5, 7 nad aequip / stroage room need the sprinkler heads uncivered and eschution rings placed on them
Above Ceiling Inspection Passed 08/21/2014
Misc
Resolved
08/21/2014
-SEAL DUCT JOINTS AT MAIN DUCT -INDEPENDENT SUPPORT WIRE FOR THE MC CABLE MUST BE: SECURED AT BOTH END AND COLOR-ID
Occupancy Inspection - Codes Commercial Failed 8/21/2014 8/21/2014 at 12:00 AM 08/21/2014
Misc
Corrective Action Required
08/21/2014
-GET APPROVAL FROM FIRE DEPARTMENT -INSTALL A NO-SMOKING SIGN NEAR FRONT ENTRY -RECEPTACLE AT FRONT: SUPPORT YOKE; INSTALL BOX EXTENSION FLUSHED WITH THE COMBUSTIBLE WALL FINISH -INSTALL GUARDRAIL OR OTHER BARRIER AT FRONT STEEL PROTRUSION INTO THE CIRCULATION PATH PER ANSI 117.1 307.4 -RAISE THE EQUIPMENT FLOOR TO SAME LEVEL AS LANDING -INSTALL HANDRAILS ON BOTH SIDES OF RAMPS -INSTALL SIGNAGE AT RESTROOM -INSTALL 20 AMP CIRCUIT AND OUTLET FOR SIGNAGE AS REQUIRED PER NEC 600.5 -PROVIDE EPOZY BASED PAINT FOR RESTROOM WALL -INSTALL OPEN-FRONT TOILET SEAT -RECEPTACLE AT BREAK RM SINK: SUPPORT YOKE; BOX SHALL NOT BE RECESSED MORE THAN 1/4" BEHIND NON-COMBUSTIBLE WALL FINISH. INSTALL BOX EXTENSION -RECEPTACLE WITHIN 6 FT OF BREAK RM SINK SHALL BE GFCI-PROTECTED -INSTALL A LISTED DRYER TRANSITION DUCT
Occupancy Inspection - Fire Temporary C of O 08/21/2014
Occupancy Inspection - Fire Passed 8/25/2014 at 12:00 AM 08/25/2014
Occupancy Inspection - Codes Commercial Temporary C of O 8/29/2014 8/29/2014 at 12:00 AM 08/29/2014
Misc
Corrective Action Required
08/21/2014
-RAISE THE EQUIPMENT FLOOR TO SAME LEVEL AS LANDING **INSTALL HANDRAIL PER IBC 1009.15. THERE IS NO EXCEPTION -RECEPTACLE AT BREAK RM SINK: SUPPORT YOKE; BOX SHALL NOT BE RECESSED MORE THAN 1/4" BEHIND NON-COMBUSTIBLE WALL FINISH. INSTALL BOX EXTENSION **NEC 314.20 -RECEPTACLE WITHIN 6 FT OF BREAK RM SINK SHALL BE GFCI-PROTECTED **NEC 210.8(B)(5). NOTE THAT THERE IS NO EXCEPTION TO APPLY TO THIS CASE
Occupancy Inspection - Codes Commercial Full C of O 9/2/2014 9/2/2014 at 12:00 AM 09/02/2014
Misc
Resolved
09/02/2014
-RAISE THE EQUIPMENT FLOOR TO SAME LEVEL AS LANDING **INSTALL HANDRAIL PER IBC 1009.15. THERE IS NO EXCEPTION -RECEPTACLE AT BREAK RM SINK: SUPPORT YOKE; BOX SHALL NOT BE RECESSED MORE THAN 1/4" BEHIND NON-COMBUSTIBLE WALL FINISH. INSTALL BOX EXTENSION **NEC 314.20 -RECEPTACLE WITHIN 6 FT OF BREAK RM SINK SHALL BE GFCI-PROTECTED **NEC 210.8(B)(5). NOTE THAT THERE IS NO EXCEPTION TO APPLY TO THIS CASE
Documents & Images
Date Uploaded File Type Document Name
05/21/2014 Letter Fire Building Plan Review
05/29/2014 Letter Codes P/R Corrections Document
06/10/2014 Letter Fire Building Plan Review
06/13/2014 Letter Codes Plan Review Conditions
06/13/2014 Letter Fire (Sprinkler) Plan Review
06/16/2014 Letter Codes Building Permit
06/19/2014 Letter Inspection Summary
06/24/2014 Letter Inspection Summary
08/15/2014 Letter Inspection Summary
08/21/2014 Letter Inspection Summary
08/29/2014 Letter Codes Temporary Certificate of Occupancy
09/02/2014 Letter Field Certificate of Occupancy
09/03/2014 Letter Codes Final Certificate of Occupancy
09/12/2014 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home