Summary
PRCOM20140507
Building Permit - Commercial
Final Completion
ABUNDANT LIFE BAPTIST CHURCH OF LS MO
NEW OTHER (COMMERCIAL)
UNDERGROUND ELECTRICAL FOR FUTURE PARKING LOT - CONTRACTOR HAS BEEN MADE AWARE THAT THIS IS AN "AT RISK" PERMIT
04/03/2014
04/03/2014
08/18/2014
Locations
Contacts
ELDECON INC, Address:120 SE 30TH ST, Phone:(660) 553-1121  
ABUNDANT LIFE BAPTIST CHURCH OF LS MO, Address:414 SW PERSELS  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 04/17/2014 04/03/2014
Development Center
Licensed Contractors Approved 04/17/2014 04/03/2014
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $30.00 $30.00 Paid 04/03/2014
$30.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 5/14/2014 5/14/2014 at 12:00 AM 05/14/2014
Misc
Corrective Action Required
05/14/2014
WILLIAM WILL HAVE A PLAN WE CAN INITIAL- -31-LIGHT POLES -4 pole base northeast side 4#6 BARS- 8' PIER 5IN-3OUT-TIES 18"O.C.
Underground Electrical Inspection - Commercial Partial 5/16/2014 (8:00 to 5:00) 5/16/2014 at 12:00 AM 05/16/2014
Misc
Corrective Action Required
05/14/2014
WILLIAM WILL HAVE A PLAN WE CAN INITIAL- -31-LIGHT POLES -4 pole base northeast side-next row of 4- 4#6 BARS- 8' PIER 5IN-3OUT-TIES 18"O.C.
Underground Electrical Inspection - Commercial Partial 5/20/2014 5/20/2014 at 12:00 AM 05/20/2014
Misc
Partial Correction
05/20/2014
12 POLE BASES NORTH OF PROPOSED BUILDING APPROVED PER DETAIL PROVIDED. *PLEASE NOTE, IF ELECTRICAL DETAIL CALLS FOR GROUNDING OF POLE BASES, ADDITIONAL GROUND ROD MAY BE REQUIRED.
Underground Electrical Inspection - Commercial Partial 5/22/2014 5/22/2014 at 12:00 AM 05/22/2014
Misc
Partial Correction
05/20/2014
12 POLE BASES NORTH OF PROPOSED BUILDING APPROVED PER DETAIL PROVIDED. 4 POLE BASES SOUTH OF JEFFERSON ENTRANCE APPROVED. *PLEASE NOTE, IF ELECTRICAL DETAIL CALLS FOR GROUNDING OF POLE BASES, ADDITIONAL GROUND ROD MAY BE REQUIRED.
Misc
Partial Correction
05/22/2014
CONDUIT BETWEEN POLES APPROVED FOUR FAR NORTH OF LOT.
Underground Electrical Inspection - Commercial Partial 5/23/2014 5/23/2014 at 12:00 AM 05/23/2014
Misc
Partial Correction
05/22/2014
12 POLE BASES NORTH OF PROPOSED BUILDING APPROVED PER DETAIL PROVIDED. 4 POLE BASES SOUTH OF JEFFERSON ENTRANCE APPROVED. *PLEASE NOTE, IF ELECTRICAL DETAIL CALLS FOR GROUNDING OF POLE BASES, ADDITIONAL GROUND ROD MAY BE REQUIRED.
Misc
Partial Correction
05/22/2014
CONDUIT BETWEEN POLES APPROVED AT 5 NORTH POLES TO 2ND FROM NORTH AT EAST END.
Underground Electrical Inspection - Commercial Partial 5/29/2014 5/29/2014 at 12:00 AM 05/29/2014
Misc
Partial Correction
05/23/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-24 31 TOTAL-POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE..
Misc
Partial Correction
05/23/2014
UNDERGROUND CONDUIT- -3 NORTH RUND OF LIGHT POLES COMPLETE - PARTIAL HOME RUN TO BUILDING NORTH EAST SIDE -north west home run to building
Underground Electrical Inspection - Commercial Partial 5/30/2014 5/30/2014 at 12:00 AM 05/30/2014
Misc
Corrective Action Required
05/30/2014
UNDERGROUND CONDUIT- -3 NORTH RUND OF LIGHT POLES COMPLETE - PARTIAL HOME RUN TO BUILDING NORTH EAST SIDE -north west home run to building
Misc
Corrective Action Required
05/30/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-24 31 TOTAL-POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE..
Underground Electrical Inspection - Commercial Partial 6/2/2014 6/2/2014 at 12:00 AM 06/02/2014
Misc
Corrective Action Required
05/30/2014
UNDERGROUND CONDUIT- -3 NORTH RUND OF LIGHT POLES COMPLETE - PARTIAL HOME RUN TO BUILDING NORTH EAST SIDE -north west home run to building -west side underground elect SOUTH EAST POLE LIGHTS
Misc
Corrective Action Required
05/30/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-24,25-28 31 TOTAL-POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE..
Underground Electrical Inspection - Commercial Partial 6/3/2014 6/3/2014 at 12:00 AM 06/03/2014
Misc
Corrective Action Required
06/02/2014
UNDERGROUND CONDUIT- -3 NORTH RUND OF LIGHT POLES COMPLETE - PARTIAL HOME RUN TO BUILDING NORTH EAST SIDE -north west home run to building -west side underground elect
Misc
Corrective Action Required
06/02/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28 31 TOTAL-POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE..
Underground Electrical Inspection - Commercial Partial 6/4/2014 6/4/2014 at 12:00 AM 06/04/2014
Misc
Corrective Action Required
06/03/2014
UNDERGROUND CONDUIT- -3 NORTH RUND OF LIGHT POLES COMPLETE - PARTIAL HOME RUN TO BUILDING NORTH EAST SIDE -north west home run to building -west side underground elect -SOUTH WEST TO EXISTING PARKING ENTRANCE
Misc
Corrective Action Required
06/03/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28 31 TOTAL-POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE..
Underground Electrical Inspection - Commercial Partial 6/6/2014 6/6/2014 at 12:00 AM 06/06/2014
Misc
Corrective Action Required
06/04/2014
UNDERGROUND CONDUIT- -3 NORTH RUND OF LIGHT POLES COMPLETE - PARTIAL HOME RUN TO BUILDING NORTH EAST SIDE -north west home run to building -west side underground elect -SOUTH WEST TO EXISTING PARKING ENTRANCE
Misc
Corrective Action Required
06/04/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28 31 TOTAL-POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE..
Underground Electrical Inspection - Commercial Partial 6/9/2014 6/9/2014 at 12:00 AM 06/09/2014
Misc
Corrective Action Required
06/06/2014
UNDERGROUND CONDUIT- EAST FRONT OF BUILDING- ONLY EAST SIDE LAST 3 POLE LIGHTS NEXT TO JEFFERSON REMAIN
Misc
Corrective Action Required
06/06/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28,29-30 POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE.. 30 POLE LIGHT BASE HAVE BEEN INSEPCTED. 6-9-14MH
Underground Electrical Inspection - Commercial Partial 6/11/2014 6/11/2014 at 12:00 AM 06/11/2014
Misc
Corrective Action Required
06/09/2014
UNDERGROUND CONDUIT- EAST FRONT OF BUILDING- 3- POLE CONDUIT JEFFERSON SIDE AND IN FRONT OF BUILDING
Misc
Corrective Action Required
06/09/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28,29-30 POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE.. 30 POLE LIGHT BASE HAVE BEEN INSEPCTED. 6-9-14MH
Underground Electrical Inspection - Commercial Partial 6/13/2014 6/13/2014 at 12:00 AM 06/13/2014
Misc
Corrective Action Required
06/11/2014
UNDERGROUND CONDUIT- ONLY REMAINING IS CONDUIT BETWEEN 3 LIGH POLES- SOUTH SID OF DRIVE OFF OF JEFFERSON TO THE WEST CENTER OF BUILDING- -
Misc
Corrective Action Required
06/11/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28,29-30 POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE.. 30 POLE LIGHT BASE HAVE BEEN INSEPCTED. 6-9-14MH
Underground Electrical Inspection - Commercial Partial 6/16/2014 6/16/2014 at 12:00 AM 06/16/2014
Misc
Resolved
06/16/2014
UNDERGROUND CONDUIT- ONLY REMAINING IS CONDUIT BETWEEN 3 LIGH POLES- SOUTH SID OF DRIVE OFF OF JEFFERSON TO THE WEST CENTER OF BUILDING- -
Misc
Corrective Action Required
06/13/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28,29-30 POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE.. 30 POLE LIGHT BASE HAVE BEEN INSEPCTED. 6-9-14MH
Underground Electrical Inspection - Commercial Partial 6/17/2014 6/17/2014 at 12:00 AM 06/17/2014
Misc
Corrective Action Required
06/16/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28,29-30 POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE.. 30 POLE LIGHT BASE HAVE BEEN INSEPCTED. 6-9-14MH
Misc
Corrective Action Required
06/17/2014
PRIMARY AND SECONDARY TO BUILDING.
Underground Electrical Inspection - Commercial Passed 8/18/2014 8/18/2014 at 12:00 AM 08/18/2014
Misc
Corrective Action Required
06/17/2014
LIGHT POLE BASE INSEPCTION-INSPECTED 1-4,5-8, 9-12,13-16,17-20,21-2425-28,29-30 POLE 31 IS UNDER TRAILER AND WILL BE AT A LATER DATE.. 30 POLE LIGHT BASE HAVE BEEN INSEPCTED. 6-9-14MH
Misc
Corrective Action Required
06/17/2014
PRIMARY AND SECONDARY TO BUILDING.
Final Electrical Inspection - Commercial Passed 08/18/2014
Documents & Images
Date Uploaded File Type Document Name
04/03/2014 Letter Codes Building Permit
04/04/2014 Letter Codes Plan Review Conditions
05/14/2014 Letter Inspection Summary
05/16/2014 Letter Inspection Summary
05/20/2014 Letter Inspection Summary
05/22/2014 Letter Inspection Summary
05/23/2014 Letter Inspection Summary
05/29/2014 Letter Inspection Summary
05/30/2014 Letter Inspection Summary
06/02/2014 Letter Inspection Summary
06/03/2014 Letter Inspection Summary
06/04/2014 Letter Inspection Summary
06/06/2014 Letter Inspection Summary
06/09/2014 Letter Inspection Summary
06/11/2014 Letter Inspection Summary
06/13/2014 Letter Inspection Summary
06/16/2014 Letter Inspection Summary
06/17/2014 Letter Inspection Summary
08/18/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home