Permit Application Status

PRCOM20132180


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20132180
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
5TH FLOOR NORTH INFILL
10/03/2013
11/11/2013
10/15/2014
11/18/2014
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
ACI BOLAND - KANSAS CITY, Address:1421 E 104TH STREET  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 01/27/2014
Brian Austerman
Installation acceptance testing
Corrective Action Required
01/27/2014

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic testing
Fire Plan Review Approved with Conditions 11/04/2013 11/08/2013
Brian Austerman
Misc
Corrective Action Required
11/08/2013

3006.2 Interior supply location. Medical gases shall be stored in areas dedicated to the storage of such gases without other storage or uses. Where containers of medical gases in quantities greater than the permit amount are located inside buildings, they shall be in a 1-hour exterior room, a 1-hour interior room or a gas cabinet in accordance with Section 3006.2.1, 3006.2.2 or 3006.2.3. For information only, verified at inspection
Misc
Corrective Action Required
11/08/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Provide Med gas certifications ACKNOWLEDGED IN RESUB LETTER
Construction documents - Fire protection systems
Corrective Action Required
11/08/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval ACKNOWLEDGED IN RESUB LETTER
Construction documents for fire alarm systems
Corrective Action Required
11/08/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval ACKNOWLEDGED IN RESUB LETTER
Misc
Corrective Action Required
11/08/2013

509.1 Features. Where required by other sections of this code and in all buildings classified as high-rise buildings by the International Building Code, a fire command center for fire department operations shall be provided. The location and accessibility of the fire command center shall be approved by the fire department. The fire command center shall be separated from the remainder of the building by not less than a 1-hour fire barrier constructed in accordance with Section 706 of the International Building Code or horizontal assembly constructed in accordance with Section 711 of the International Building Code, or both. The room shall be a minimum of 96 square feet (9 m2) with a minimum dimension of 8 feet (2438 mm). A layout of the fire command center and all features required by this section to be contained therein shall be submitted for approval prior to installation. The fire command center shall comply with NFPA 72 and shall contain the following features: 1. The emergency voice/alarm communication system unit. 2. The fire department communications system. 3. Fire-detection and alarm system annunciator system. 4. Annunciator visually indicating the location of the elevators and whether they are operational. 5. Status indicators and controls for air-handling systems. 6. The fire-fighter’s control panel required by Section 909.16 for smoke control systems installed in the building. 7. Controls for unlocking stairway doors simultaneously. 8. Sprinkler valve and water-flow detector display panels. 9. Emergency and standby power status indicators. 10. A telephone for fire department use with controlled access to the public telephone system. 11. Fire pump status indicators. 12. Schematic building plans indicating the typical floor plan and detailing the building core, means of egress, fire protection systems, fire-fighting equipment and fire department access. 13. Work table. 14. Generator supervision devices, manual start and transfer features. 15. Public address system, where specifically required by other sections of this code. This is a requirement that has already been identified; plans have been received and approved. No ocupancy of the 5th floor space will be granted until completion of the fire command center and other high-rise requirements ACKNOWLEDGED IN RESUB LETTER
Building Plan Review Approved with Conditions 11/04/2013 11/04/2013
Mike Weisenborn
Misc
Resolved
11/04/2013

Hatching is shown in the walls between the patient rooms and between the patient rooms and the corridor. The hatching stops in the corridor walls at patient rooms 5A039 and 5A054. Action required - I am having trouble locating information on what the hatching means and I am not sure why it stops at these points.
Misc
Informational
11/04/2013

2006 IBC - 1020.1.7 - Smokeproof enclosure. In buildings required to comply with Section 403 or 405, each of the exits of a building that serves stories where the floor surface is located more than 75 feet above the lowest level of fire department vehicle access or more than 30 feet below the level of exit discharge serving such floor levels shall be a smokeproof enclosure or pressurized stairway in accordance with Section 909.20. Action required - As discussed early, compliance with this requirement shall be met on the shell building prior to receiving any type of occupancy on this work covered by this permit.
Plumb - Separate facilities
Resolved
11/04/2013

2006 IPC 403.2 - Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (See code for possible exceptions.) Action required - Toilets 5A061A and 5A063 shall be separate facilities as they are in the public space. Please indicate which will be men's and women's.
Fire Plan Review Approved with Conditions 11/04/2013 11/04/2013
Mike Weisenborn
Misc
Corrective Action Required
10/30/2013

3006.2 Interior supply location. Medical gases shall be stored in areas dedicated to the storage of such gases without other storage or uses. Where containers of medical gases in quantities greater than the permit amount are located inside buildings, they shall be in a 1-hour exterior room, a 1-hour interior room or a gas cabinet in accordance with Section 3006.2.1, 3006.2.2 or 3006.2.3. For information only, verified at inspection
Misc
Corrective Action Required
10/30/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Provide Med gas certifications ACKNOWLEDGED IN RESUB LETTER
Construction documents - Fire protection systems
Corrective Action Required
10/30/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval ACKNOWLEDGED IN RESUB LETTER
Construction documents for fire alarm systems
Corrective Action Required
10/30/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval ACKNOWLEDGED IN RESUB LETTER
Misc
Corrective Action Required
10/30/2013

509.1 Features. Where required by other sections of this code and in all buildings classified as high-rise buildings by the International Building Code, a fire command center for fire department operations shall be provided. The location and accessibility of the fire command center shall be approved by the fire department. The fire command center shall be separated from the remainder of the building by not less than a 1-hour fire barrier constructed in accordance with Section 706 of the International Building Code or horizontal assembly constructed in accordance with Section 711 of the International Building Code, or both. The room shall be a minimum of 96 square feet (9 m2) with a minimum dimension of 8 feet (2438 mm). A layout of the fire command center and all features required by this section to be contained therein shall be submitted for approval prior to installation. The fire command center shall comply with NFPA 72 and shall contain the following features: 1. The emergency voice/alarm communication system unit. 2. The fire department communications system. 3. Fire-detection and alarm system annunciator system. 4. Annunciator visually indicating the location of the elevators and whether they are operational. 5. Status indicators and controls for air-handling systems. 6. The fire-fighter’s control panel required by Section 909.16 for smoke control systems installed in the building. 7. Controls for unlocking stairway doors simultaneously. 8. Sprinkler valve and water-flow detector display panels. 9. Emergency and standby power status indicators. 10. A telephone for fire department use with controlled access to the public telephone system. 11. Fire pump status indicators. 12. Schematic building plans indicating the typical floor plan and detailing the building core, means of egress, fire protection systems, fire-fighting equipment and fire department access. 13. Work table. 14. Generator supervision devices, manual start and transfer features. 15. Public address system, where specifically required by other sections of this code. This is a requirement that has already been identified; plans have been received and approved. No ocupancy of the 5th floor space will be granted until completion of the fire command center and other high-rise requirements ACKNOWLEDGED IN RESUB LETTER
Building Plan Review Rejected 10/15/2013 10/15/2013
Mike Weisenborn
Misc
Corrective Action Required
10/11/2013

Hatching is shown in the walls between the patient rooms and between the patient rooms and the corridor. The hatching stops in the corridor walls at patient rooms 5A039 and 5A054. Action required - I am having trouble locating information on what the hatching means and I am not sure why it stops at these points.
Misc
Corrective Action Required
10/11/2013

2006 IBC - 1020.1.7 - Smokeproof enclosure. In buildings required to comply with Section 403 or 405, each of the exits of a building that serves stories where the floor surface is located more than 75 feet above the lowest level of fire department vehicle access or more than 30 feet below the level of exit discharge serving such floor levels shall be a smokeproof enclosure or pressurized stairway in accordance with Section 909.20. Action required - As discussed early, compliance with this requirement shall be met on the shell building prior to receiving any type of occupancy on this work covered by this permit.
Plumb - Separate facilities
Corrective Action Required
10/15/2013

2006 IPC 403.2 - Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (See code for possible exceptions.) Action required - Toilets 5A061A and 5A063 shall be separate facilities as they are in the public space. Please indicate which will be men's and women's.
Fire Plan Review Approved with Conditions 10/15/2013 10/07/2013
Brian Austerman
Misc
Corrective Action Required
10/07/2013

3006.2 Interior supply location. Medical gases shall be stored in areas dedicated to the storage of such gases without other storage or uses. Where containers of medical gases in quantities greater than the permit amount are located inside buildings, they shall be in a 1-hour exterior room, a 1-hour interior room or a gas cabinet in accordance with Section 3006.2.1, 3006.2.2 or 3006.2.3. For information only, verified at inspection
Misc
Corrective Action Required
10/07/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Provide Med gas certifications
Construction documents - Fire protection systems
Corrective Action Required
10/07/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
10/07/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Misc
Corrective Action Required
10/07/2013

509.1 Features. Where required by other sections of this code and in all buildings classified as high-rise buildings by the International Building Code, a fire command center for fire department operations shall be provided. The location and accessibility of the fire command center shall be approved by the fire department. The fire command center shall be separated from the remainder of the building by not less than a 1-hour fire barrier constructed in accordance with Section 706 of the International Building Code or horizontal assembly constructed in accordance with Section 711 of the International Building Code, or both. The room shall be a minimum of 96 square feet (9 m2) with a minimum dimension of 8 feet (2438 mm). A layout of the fire command center and all features required by this section to be contained therein shall be submitted for approval prior to installation. The fire command center shall comply with NFPA 72 and shall contain the following features: 1. The emergency voice/alarm communication system unit. 2. The fire department communications system. 3. Fire-detection and alarm system annunciator system. 4. Annunciator visually indicating the location of the elevators and whether they are operational. 5. Status indicators and controls for air-handling systems. 6. The fire-fighter’s control panel required by Section 909.16 for smoke control systems installed in the building. 7. Controls for unlocking stairway doors simultaneously. 8. Sprinkler valve and water-flow detector display panels. 9. Emergency and standby power status indicators. 10. A telephone for fire department use with controlled access to the public telephone system. 11. Fire pump status indicators. 12. Schematic building plans indicating the typical floor plan and detailing the building core, means of egress, fire protection systems, fire-fighting equipment and fire department access. 13. Work table. 14. Generator supervision devices, manual start and transfer features. 15. Public address system, where specifically required by other sections of this code. This is a requirement that has already been identified; plans have been received and approved. No ocupancy of the 5th floor space will be granted until completion of the fire command center and other high-rise requirements
Licensed Contractors Approved 10/15/2013 10/03/2013
Codes Admin
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $29,013.60 $29,013.60 Paid 11/11/2013
$29,013.60
7232302-Saint Lukes Road and Bridge Escrow $8,097.63 $8,097.63 Paid 05/05/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 11/14/2013 at 12:00 AM 11/14/2013
Misc
Partial Correction
11/14/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A205; SPACE 140; 143; 162;
In-wall Inspection Partial 11/15/2013 at 12:00 AM 11/15/2013
Misc
Partial Correction
11/14/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (15.3);
In-wall Inspection Partial 11/20/2013 at 12:00 AM 11/20/2013
Misc
Partial Correction
11/15/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11);
In-wall Inspection Partial 11/26/2013 11/26/2013 at 12:00 AM 11/26/2013
Misc
Partial Correction
11/20/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11);
Misc
Partial Correction
11/26/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143;
In-wall Inspection Partial 12/2/2013 at 12:00 AM 12/02/2013
Misc
Partial Correction
11/26/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
11/26/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143;
Rated Assembly Inspection Partial 12/2/2013 12/2/2013 at 12:00 AM 12/02/2013
Misc
Partial Correction
12/02/2013
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: > SHAFT AT B'.2/18.5: FRAMING AND INNER LAYER SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL
Rated Assembly Inspection Partial 12/4/2013 12/4/2013 at 12:00 AM 12/04/2013
Misc
Partial Correction
12/02/2013
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: > SHAFT AT B'.2/18.5: FRAMING AND INNER LAYER SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL
Misc
Partial Correction
12/04/2013
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT;
Rated Assembly Inspection Partial 12/9/2013 12/9/2013 at 12:00 AM 12/09/2013
Misc
Partial Correction
12/04/2013
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: > SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; > SHAFT AT B'.5/17.9: W & S WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; > SHAFT AT B'.2/17.1: FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL;
Misc
Partial Correction
12/04/2013
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL;
In-wall Inspection Partial 12/16/2013 at 12:00 AM 12/16/2013
Misc
Partial Correction
12/02/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
12/02/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; {070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 052 EXCEPT HEADWALLS;
In-wall Inspection Partial 12/20/2013 12/20/2013 at 12:00 AM 12/20/2013
Misc
Partial Correction
12/16/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
12/16/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; {070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 EXCEPT HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203;
Rated Assembly Inspection Partial 12/27/2013 at 12:00 AM 12/27/2013
Misc
Partial Correction
12/09/2013
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: > SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; > SHAFT AT B'.5/17.9: W & S WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; > SHAFT AT B'.2/17.1: FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL;
Misc
Partial Correction
12/09/2013
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208;
In-wall Inspection Partial 12/27/2013 12/27/2013 at 12:00 AM 12/27/2013
Misc
Partial Correction
12/20/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
12/20/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; {070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 EXCEPT HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; [016 THRU 046; 134; XXX; 135 EXCEPT SE CORNER @ RD STACKS; 136; 147; 148; 149 N WALL;
In-wall Inspection Partial 12/27/2013 at 12:00 AM 12/27/2013
Misc
Partial Correction
12/27/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
12/27/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; {070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 EXCEPT HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; [[016 THRU 046; RR134; RR135; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; {NOTE: DUPLICATION OF SPACE # 135 TO BE CLARIFIED.}
Above Ceiling Inspection Partial 12/31/2013 at 12:00 AM 12/31/2013
Misc
Partial Correction
12/31/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SHOWERS @ 47-54;
In-wall Inspection Partial 12/31/2013 12/31/2013 at 12:00 AM 12/31/2013
Misc
Partial Correction
12/27/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); CORR 102 W WALL FROM (8) TO (11);
Misc
Partial Correction
12/27/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; {070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 054 INCLUDING HEADWALLS; 055 THRU 059 EXCEPT HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL;
Rated Assembly Inspection Partial 1/3/2014 at 12:00 AM 01/03/2014
Misc
Partial Correction
12/27/2013
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: > SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; > SHAFT AT B'.5/17.9: W & S WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; > SHAFT AT B'.2/17.1: FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL;
Misc
Partial Correction
12/27/2013
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208; CORR CROSS-WALL @ DOOR A203;
In-wall Inspection Partial 1/3/2014 1/3/2014 at 12:00 AM 01/03/2014
Misc
Partial Correction
12/31/2013
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
12/31/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; {070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 INCLUDING HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11);
In-wall Inspection Partial 1/6/2014 1/6/2014 at 12:00 AM 01/06/2014
Misc
Partial Correction
01/03/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
01/03/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 INCLUDING HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046 INCLUDING HEADWALLS;
In-wall Inspection Not Ready 1/8/2014 1/8/2014 at 12:00 AM 01/08/2014
Misc
Partial Correction
01/06/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
01/06/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 INCLUDING HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046 INCLUDING HEADWALLS;
Misc
Corrective Action Required
01/08/2014
031 THRU 036 NOT READY
In-wall Inspection Partial 1/9/2014 1/9/2014 at 12:00 AM 01/09/2014
Misc
Partial Correction
01/08/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
01/08/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036;
Misc
Resolved
01/09/2014
031 THRU 036 NOT READY
Above Ceiling Inspection Partial 1/10/2014 at 12:00 AM 01/10/2014
Misc
Partial Correction
12/31/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SHOWERS @ 47-54; [SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NOT READY/NOT APPROVED: SOFFITS @ NURSE STATION; SOFFIT @ 062 E WALL. ENSURE TENSION STUDS ARE SCREWED BOTH FLANGES AT CONNECTIONS -- TOP AND BOTTOM.
Rated Assembly Inspection Partial 1/10/2014 1/10/2014 at 12:00 AM 01/10/2014
Misc
Partial Correction
01/03/2014
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: > SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; SHAFT AT B'.5/17.9: W & S WALLS FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; SHAFT AT B'.2/17.1: FRAMING & SHAFT LINER BOARD OK TO COMPLETE AND FIRE-SEAL; [FRAMING AND LINER BOARD AT TYPE "F" SHAFT IN 119 N WALL;
Misc
Partial Correction
01/03/2014
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208; CORR CROSS-WALL @ DOOR A203; [COMMON WALL @ 056/057; ABOVE DOOR OPNG #203; 123 W,N,E WALLS; 124, 136 & 153 BOTH FACES;
In-wall Inspection Partial 1/10/2014 at 12:00 AM 01/10/2014
Misc
Partial Correction
01/10/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
01/10/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; [ABOVE DOOR 207;
In-wall Inspection Partial 1/10/2014 at 12:00 AM 01/10/2014
Misc
Partial Correction
01/08/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
01/08/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059 INCLUDING HEADWALLS; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046 INCLUDING HEADWALLS;
In-wall Inspection Partial 1/15/2014 1/15/2014 at 12:00 AM 01/15/2014
Misc
Partial Correction
01/10/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C');
Misc
Partial Correction
01/10/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201;
Above Ceiling Inspection Partial 1/15/2014 at 12:00 AM 01/15/2014
Misc
Partial Correction
01/10/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SHOWERS @ 47-54; [SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; [NURSE STATION 150 SOFFITS E & W ONLY; SHOWER LIDS AT 055 THRU 060; SHOWER LIDS AT 043 THRU 046; NOT APPROVED: SOFFITS @ NURSE STATION N & S. ADD FRAMING TO CARRY LOADS WHERE 2 OR MORE TENSION STUDS DO NOT EXTEND TO STRUCTURE ABOVE.
Rated Assembly Inspection Partial 1/17/2014 (8:00 to 5:00) 1/17/2014 at 12:00 AM 01/17/2014
Misc
Partial Correction
01/10/2014
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.5/17.9 W & S WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.2/17.1 FRAMING & SHAFT LINER BOARD;
Misc
Partial Correction
01/10/2014
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208; CORR CROSS-WALL @ DOOR A203; [COMMON WALL @ 056/057; ABOVE DOOR OPNG #203; 123 W,N,E WALLS; 124, 136 & 153 BOTH FACES; [RATED WALL CLOSED TO COLUMN AND FIRE-SEALED @ B'/12.8; E-W WALL ADJACENT TO (7) FROM (A) TO (A.8);
Above Ceiling Inspection Partial 1/17/2014 at 12:00 AM 01/17/2014
Misc
Partial Correction
01/15/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SHOWERS @ 47-54; [SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; [NURSE STATION 150 SOFFITS E & W ONLY; SHOWER LIDS AT 055 THRU 060; SHOWER LIDS AT 043 THRU 046; [SOFFITS @ NURSE STATION N & S;
In-wall Inspection Partial 1/21/2014 (8:00 to 5:00) 1/21/2014 at 12:00 AM 01/21/2014
Misc
Partial Correction
01/15/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES; CHASE WALLS @ B.5' BETWEEN (B) & (C): 125 N WALL OK TO COVER TO DECK (NOTE TYPE K) 151 S WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L). CLARIFICATION REQUIRED RE WHICH WALL IS INTENDED TO BE 0 HR SMOKE.
Misc
Partial Correction
01/15/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201;
Above Ceiling Inspection Partial 1/21/2014 at 12:00 AM 01/21/2014
Misc
Partial Correction
01/17/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS;
Misc
Partial Correction
01/21/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 047 THRU 060; 041 THRU 046; 031; 032; AT 033 THRU 040 ENSURE ALL HORIZONTAL CEILING FRAMING MEMBERS ARE SCREWED BOTH FLANGES BOTH ENDS.
In-wall Inspection Partial 1/22/2014 1/22/2014 at 12:00 AM 01/22/2014
Misc
Partial Correction
01/21/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES; CHASE WALLS @ B.5' BETWEEN (B) & (C): [151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L);
Misc
Partial Correction
01/21/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201;
Above Ceiling Inspection Partial 1/22/2014 at 12:00 AM 01/22/2014
Misc
Partial Correction
01/21/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS;
Misc
Partial Correction
01/21/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 047 THRU 060; 041 THRU 046; 031 THRU 040;
In-wall Inspection Partial 1/22/2014 at 12:00 AM 01/22/2014
Misc
Partial Correction
01/22/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES;
Misc
Partial Correction
01/22/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L);
Above Ceiling Inspection Partial 1/24/2014 at 12:00 AM 01/24/2014
Misc
Partial Correction
01/22/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200;
Misc
Partial Correction
01/22/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 047 THRU 060; 041 THRU 046; 031 THRU 040;
Rated Assembly Inspection Partial 1/24/2014 at 12:00 AM 01/24/2014
Misc
Partial Correction
01/17/2014
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.5/17.9 W & S WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.2/17.1 FRAMING & SHAFT LINER BOARD;
Misc
Partial Correction
01/17/2014
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208; CORR CROSS-WALL @ DOOR A203; [COMMON WALL @ 056/057; ABOVE DOOR OPNG #203; 123 W,N,E WALLS; 124, 136 & 153 BOTH FACES; [RATED WALL CLOSED TO COLUMN AND FIRE-SEALED @ B'/12.8; E-W WALL ADJACENT TO (7) FROM (A) TO (A.8); COMMON WALL BETWEEN 115A & 116;
Above Ceiling Inspection Partial 1/24/2014 at 12:00 AM 01/24/2014
Misc
Partial Correction
01/24/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200;
Misc
Partial Correction
01/24/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 031 THRU 060;
In-wall Inspection Partial 1/24/2014 1/28/2014 at 12:00 AM 01/28/2014
Misc
Partial Correction
01/22/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES;
Misc
Partial Correction
01/22/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15;
In-wall Inspection Partial 1/31/2014 at 12:00 AM 01/31/2014
Misc
Partial Correction
01/28/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES;
Misc
Partial Correction
01/28/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15; FRAMING TO WRAP COLUMNS @ A.8/9.5 & A.8/10.5;
Above Ceiling Inspection Partial 1/31/2014 at 12:00 AM 01/31/2014
Misc
Partial Correction
01/24/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200; OVAL FACIA @ 9'-8";
Misc
Partial Correction
01/24/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 031 THRU 060;
Above Ceiling Inspection Partial 2/10/2014 2/10/2014 at 12:00 AM 02/10/2014
Misc
Partial Correction
01/31/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200; OVAL FACIA @ 9'-8";
Misc
Partial Correction
01/31/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 031 THRU 060;
Misc
Partial Correction
02/10/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 5A135-137; 139; 141; 143; 147-148;
Above Ceiling Inspection Partial 2/12/2014 at 12:00 AM 02/12/2014
Misc
Partial Correction
02/10/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200; OVAL FACIA @ 9'-8"; ARC SOFFITS FROM C'/11 TO C/9 AND FROM A.8/10.5 TO A.8/9.5;
Misc
Partial Correction
02/10/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 031 THRU 060;
Misc
Partial Correction
02/10/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 5A135-137; 139; 141; 143; 147-148;
Above Ceiling Inspection Partial 2/20/2014 2/20/2014 at 12:00 AM 02/20/2014
Misc
Partial Correction
02/12/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200; OVAL FACIA @ 9'-8"; ARC SOFFITS FROM C'/11 TO C/9 AND FROM A.8/10.5 TO A.8/9.5;
Misc
Partial Correction
02/12/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 031 THRU 060;
Misc
Partial Correction
02/12/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 135-137; 139; 141; 143; 147-148; 031-046; 0150;
Above Ceiling Inspection Partial 2/24/2014 2/24/2014 at 12:00 AM 02/24/2014
Misc
Partial Correction
02/20/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:SOFFITS AT CORRIDORS 203 & 207 @ (16), (16.4), (18.1), (18.4); LOBBYS 200 & 204; NURSE STATION 150 SOFFITS; HARD LID 11' AFF @ ELEV LOBBY 200; OVAL FACIA @ 9'-8"; ARC SOFFITS FROM C'/11 TO C/9 AND FROM A.8/10.5 TO A.8/9.5;
Misc
Partial Correction
02/20/2014
OK TO COVER WHEN READY SHOWER LIDS AT: 031 THRU 060;
Misc
Partial Correction
02/20/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 135-137; 139; 141; 143; 147-148; 031-046; 0150; 115; 115A; 116; 119; 120; 121; 121A; 123; 124; 125; 153;
In-wall Inspection Partial 2/26/2014 2/26/2014 at 12:00 AM 02/26/2014
Misc
Partial Correction
01/31/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES; SHORT WALLS AT NURSE STN 5A150 S, E, N;
Misc
Partial Correction
01/31/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15; FRAMING TO WRAP COLUMNS @ A.8/9.5 & A.8/10.5;
In-wall Inspection Partial 2/26/2014 at 12:00 AM 02/26/2014
Misc
Partial Correction
02/26/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES;
Misc
Partial Correction
02/26/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15; FRAMING TO WRAP COLUMNS @ A.8/9.5 & A.8/10.5; SHORT WALLS AT NURSE STN 5A150 S, E, N;
Above Ceiling Inspection Partial 2/27/2014 2/27/2014 at 12:00 AM 02/27/2014
Misc
Partial Correction
02/24/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:NORTH WING & CENTER SECTION;
Misc
Partial Correction
02/24/2014
OK TO COVER WHEN READY SHOWER LIDS AT: NORTH WING & CENTER SECTION;
Misc
Partial Correction
02/24/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 135-137; 139; 141; 143; 147-148; 031-046; 0150; 115; 115A; 116; 119; 120; 121; 121A; 123; 124; 125; 153; 149; 151; 200-208;
In-wall Inspection Partial 3/5/2014 3/5/2014 at 12:00 AM 03/05/2014
Misc
Partial Correction
02/26/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES;
Misc
Partial Correction
02/26/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15; FRAMING TO WRAP COLUMNS @ A.8/9.5 & A.8/10.5; SHORT WALLS AT NURSE STN 5A150 COMPLETE INCLUDING WEST
In-wall Inspection Partial 3/21/2014 3/21/2014 at 12:00 AM 03/21/2014
Misc
Resolved
03/21/2014
OK TO TOP-OUT WALLS WITH GWB TO ALLOW INSTALLATION OF HVAC DUCT AND OTHER SYSTEMS AT FOLLOWING LOCATIONS: CORRIDOR 5A203 FROM (13.1) TO (18.7); SPACE 140; 143; 162; CORR 5A207 FROM (19) TO (11); ON (17) FROM (B') TO (C'); 118 BOTH FACES;
Misc
Partial Correction
03/05/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15; FRAMING TO WRAP COLUMNS @ A.8/9.5 & A.8/10.5; SHORT WALLS AT NURSE STN 5A150 COMPLETE INCLUDING WEST; RT 5A117;
Rated Assembly Inspection Partial 3/25/2014 3/25/2014 at 12:00 AM 03/25/2014
Misc
Partial Correction
01/24/2014
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.5/17.9 W & S WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.2/17.1 FRAMING & SHAFT LINER BOARD;
Misc
Partial Correction
01/24/2014
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208; CORR CROSS-WALL @ DOOR A203; [COMMON WALL @ 056/057; ABOVE DOOR OPNG #203; 123 W,N,E WALLS; 124, 136 & 153 BOTH FACES; [RATED WALL CLOSED TO COLUMN AND FIRE-SEALED @ B'/12.8; E-W WALL ADJACENT TO (7) FROM (A) TO (A.8); COMMON WALL BETWEEN 115A & 116; RT 5A117 S WALL BOTH FACES OK TO TAPE, MUD & FIRE-SEAL;
Above Ceiling Inspection Partial 4/7/2014 4/7/2014 at 12:00 AM 04/07/2014
Misc
Partial Correction
02/27/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:NORTH WING & CENTER SECTION;
Misc
Partial Correction
02/27/2014
OK TO COVER WHEN READY SHOWER LIDS AT: NORTH WING & CENTER SECTION;
Misc
Partial Correction
02/27/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 135-137; 139; 141; 143; 147-148; 031-046; 0150; 115; 115A; 116; 119; 120; 121; 121A; 123; 124; 125; 153; 149; 151; 200-208; 117; 118;
Alarm Test Partial 4/8/2014 at 12:00 AM 04/08/2014
In-wall Inspection Passed 3/21/2014 at 12:00 AM 04/21/2014
Misc
Resolved
04/21/2014
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 5A115; 143; 070; 137; 139; 140; 141; 208; CORR 203 FROM (19) TO (17); PATIENT 047 THRU 059; 060 EXCEPT HEADWALL & SE PLUMBING WALLS IN BA; 061; CORR 201/202/203 COMPLETE FROM (19) TO (10.5) EXCEPT AT NURSE STATION DROPS/SOFFITS; CORRIDOR CROSSWALL @ FIRE DOOR 5A203; 016 THRU 046; RR133; RR134; 135 EXCEPT SE CORNER @ R.D. STACKS; 136; 147; 148; 149 N WALL; CORR 102 E & S WALLS FROM (8) TO (11); 060B; 203; CORR 207 W WALL (13.7) TO (19); 125 E,S,W WALLS; 153; 124; 206; 123; 121 EXCEPT SHORT WALL; 061A; 063; 062; CORR CROSS-WALL @ DOOR 102; CORR 102 W WALL FROM (8) TO (11); 037 THRU 046; 031 THRU 036; ABOVE DOOR 207; [115; 115A; 116; ABOVE DOOR 201; [CHASE WALLS @ B.5' BETWEEN (B) & (C): 151 S WALL OK TO COVER TO DECK (NOTE TYPE K); 125 N WALL OK TO COVER TO ABOVE CEILING (NOTE TYPE L); CHASE WALL @ 121A SE; BOX CHASE @ B'.3/15; FRAMING TO WRAP COLUMNS @ A.8/9.5 & A.8/10.5; SHORT WALLS AT NURSE STN 5A150 COMPLETE INCLUDING WEST; RT 5A117;
Above Ceiling Inspection Passed 4/7/2014 at 12:00 AM 04/21/2014
Misc
Resolved
04/21/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES:NORTH WING & CENTER SECTION;
Misc
Resolved
04/21/2014
OK TO COVER WHEN READY SHOWER LIDS AT: NORTH WING & CENTER SECTION;
Misc
Resolved
04/21/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 5A047-062; 135-137; 139; 141; 143; 147-148; 031-046; 0150; 115; 115A; 116; 119; 120; 121; 121A; 123; 124; 125; 153; 149; 151; 200-208; 117; 118;
Miscellaneous Inspection Partial 4/21/2014 at 12:00 AM 04/21/2014
Rated Assembly Inspection Passed 3/25/2014 at 12:00 AM 04/21/2014
Misc
Resolved
04/21/2014
OK TO COVER WHEN READY COMPONENTS OF RATED MECHANICAL SHAFTS: SHAFT AT B'.2/18.5: "T" CROSS FRAMING & SHAFT LINER BOARD; "T" STEM FRAMING W & N WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.5/17.9 W & S WALLS FRAMING & SHAFT LINER BOARD; SHAFT AT B'.2/17.1 FRAMING & SHAFT LINER BOARD;
Misc
Resolved
04/21/2014
GWB AT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: SPACE 136 S WALL 4' TOP-OUT; 143 S WALL; [137; 139; 141; 208; CORR CROSS-WALL @ DOOR A203; [COMMON WALL @ 056/057; ABOVE DOOR OPNG #203; 123 W,N,E WALLS; 124, 136 & 153 BOTH FACES; [RATED WALL CLOSED TO COLUMN AND FIRE-SEALED @ B'/12.8; E-W WALL ADJACENT TO (7) FROM (A) TO (A.8); COMMON WALL BETWEEN 115A & 116; RT 5A117 S WALL BOTH FACES OK TO TAPE, MUD & FIRE-SEAL;
Miscellaneous Inspection Passed 4/22/2014 at 12:00 AM 04/22/2014
Occupancy Inspection - Codes Commercial Not Ready 4/23/2014 4/23/2014 at 12:00 AM 04/23/2014
Misc
Corrective Action Required
04/23/2014
SOME FIRE DOORS DO NOT DISPLAY UL LABELS
Misc
Corrective Action Required
04/23/2014
18" VERTICAL SIDEWALL GRAB BARS MIS-LOCATED AT TOILET ROOMS 5A061A; 063; 133; 134
Misc
Corrective Action Required
04/23/2014
TWO ELECT RECEPTS @ 5A136 WITHIN 6' OF EDGE OF SINK NEED TO BE GFCI PROTECTED.
Misc
Corrective Action Required
04/23/2014
CRITICAL CIRCUIT ELECT RECEPTS @ IT 5A070 YET TO BE TESTED WHEN CIRCUITS ARE HOT
Misc
Corrective Action Required
04/23/2014
OCCUPANCY STATUS: RT 5A117/118 OK FOR TEMPORARY OCCUPANCY CONTINGENT ON SCHEDULED COMPLETION AND APPROVAL OF FIRE COMMAND SYSTEM. REMAINDER OF SPACES OK TO SET UP FOR BUSINESS. NO PATIENTS NOR PUBLIC PRIOR TO APPROVAL.
Occupancy Inspection - Fire Temporary C of O 4/23/2014 at 12:00 AM 04/23/2014
Misc
Corrective Action Required
04/23/2014
Remove dust covers from smoke detectors throughout 5th floor north area. limit occupancy to rooms RT 5A117/5A118 only
Occupancy Inspection - Codes Commercial Not Ready 4/24/2014 at 12:00 AM 04/24/2014
Misc
Corrective Action Required
04/23/2014
SOME FIRE DOORS DO NOT DISPLAY UL LABELS
Misc
Corrective Action Required
04/23/2014
18" VERTICAL SIDEWALL GRAB BARS MIS-LOCATED AT TOILET ROOMS 5A061A; 063; 133; 134
Misc
Corrective Action Required
04/23/2014
TWO ELECT RECEPTS @ 5A136 WITHIN 6' OF EDGE OF SINK NEED TO BE GFCI PROTECTED.
Misc
Corrective Action Required
04/23/2014
CRITICAL CIRCUIT ELECT RECEPTS @ IT 5A070 YET TO BE TESTED WHEN CIRCUITS ARE HOT
Misc
Corrective Action Required
04/23/2014
OCCUPANCY STATUS: RT 5A117/118 OK FOR TEMPORARY OCCUPANCY CONTINGENT ON SCHEDULED COMPLETION AND APPROVAL OF FIRE COMMAND SYSTEM. REMAINDER OF SPACES OK TO SET UP FOR BUSINESS. NO PATIENTS NOR PUBLIC PRIOR TO APPROVAL.
Alarm Test Passed 5/27/2014 at 12:00 AM 05/28/2014
Occupancy Inspection - Fire Temporary C of O 5/27/2014 at 12:00 AM 05/28/2014
Misc
Corrective Action Required
05/28/2014
Remove dust covers from smoke detectors throughout 5th floor north area. limit occupancy to rooms RT 5A117/5A118 only
Misc
Corrective Action Required
05/28/2014
-confirm emergency power on the 5th floor north - access from stairway at all floor levels during fire/emerg condition activation - #13 elevator shaft needs additional pressure - seal all penetrations in c-building mechanical room 2 hour rated walls -elevator keys for all elevators to be placed in the command center knox box
Occupancy Inspection - Codes Commercial Temporary C of O 5/29/2014 at 12:00 AM 05/29/2014
Misc
Corrective Action Required
04/24/2014
SOME FIRE DOORS DO NOT DISPLAY UL LABELS
Misc
Corrective Action Required
04/24/2014
18" VERTICAL SIDEWALL GRAB BARS MIS-LOCATED AT TOILET ROOMS 5A061A; 063; 133; 134
Misc
Corrective Action Required
04/24/2014
TWO ELECT RECEPTS @ 5A136 WITHIN 6' OF EDGE OF SINK NEED TO BE GFCI PROTECTED.
Misc
Corrective Action Required
04/24/2014
CRITICAL CIRCUIT ELECT RECEPTS @ IT 5A070 YET TO BE TESTED WHEN CIRCUITS ARE HOT
Misc
Resolved
05/29/2014
OCCUPANCY STATUS: RT 5A117/118 OK FOR TEMPORARY OCCUPANCY CONTINGENT ON SCHEDULED COMPLETION AND APPROVAL OF FIRE COMMAND SYSTEM. REMAINDER OF SPACES OK TO SET UP FOR BUSINESS. NO PATIENTS NOR PUBLIC PRIOR TO APPROVAL.
Miscellaneous Inspection Passed 5/30/2014 at 12:00 AM 05/29/2014
Occupancy Inspection - Codes Commercial Partial 6/2/2014 at 12:00 AM 06/02/2014
Misc
Resolved
06/02/2014
SOME FIRE DOORS DO NOT DISPLAY UL LABELS
Misc
Resolved
06/02/2014
18" VERTICAL SIDEWALL GRAB BARS MIS-LOCATED AT TOILET ROOMS 5A061A; 063; 133; 134
Misc
Resolved
06/02/2014
TWO ELECT RECEPTS @ 5A136 WITHIN 6' OF EDGE OF SINK NEED TO BE GFCI PROTECTED.
Misc
Resolved
06/02/2014
CRITICAL CIRCUIT ELECT RECEPTS @ IT 5A070 YET TO BE TESTED WHEN CIRCUITS ARE HOT
Misc
Partial Correction
06/02/2014
FIRE DEPARTMENT YET TO APPROVE FIRE COMMAND SYSTEM
Occupancy Inspection - Codes Commercial Temporary C of O 9/4/2014 at 12:00 AM 09/04/2014
Misc
Partial Correction
06/02/2014
FIRE DEPARTMENT YET TO APPROVE FIRE COMMAND SYSTEM
Occupancy Inspection - Codes Commercial Temporary C of O 9/30/2014 at 12:00 AM 09/30/2014
Misc
Partial Correction
09/04/2014
FIRE DEPARTMENT YET TO APPROVE FIRE COMMAND SYSTEM
Misc
Partial Correction
09/30/2014
TEMPORARY OCCUPANCY APPROVAL EXTENDED TO ACCOMODATE COMPLETION OF FIRE COMMAND SYSTEM.
Occupancy Inspection - Codes Commercial Temporary C of O 9/30/2014 at 12:00 AM 09/30/2014
Misc
Partial Correction
09/30/2014
FIRE DEPARTMENT YET TO APPROVE FIRE COMMAND SYSTEM
Misc
Partial Correction
09/30/2014
TEMPORARY OCCUPANCY APPROVAL EXTENDED TO ACCOMODATE COMPLETION OF FIRE COMMAND SYSTEM.
Occupancy Inspection - Codes Commercial Temporary C of O 11/6/2014 at 12:00 AM 11/06/2014
Misc
Partial Correction
09/30/2014
FIRE DEPARTMENT YET TO APPROVE FIRE COMMAND SYSTEM
Misc
Partial Correction
11/06/2014
TEMPORARY OCCUPANCY APPROVAL EXTENDED THROUGH NOVEMBER 25, 2014 IN RESPONSE TO 11/6/14 E-MAIL REQUEST FROM JONATHAN VANDE KROL / JE DUNN.
Occupancy Inspection - Fire Passed 11/17/2014 at 12:00 AM 11/17/2014
Misc
Corrective Action Required
09/04/2014
-confirm emergency power on the 5th floor north - access from stairway at all floor levels during fire/emerg condition activation - #13 elevator shaft needs additional pressure - seal all penetrations in c-building mechanical room 2 hour rated walls -elevator keys for all elevators to be placed in the command center knox box
Misc
Corrective Action Required
09/04/2014
Remove dust covers from smoke detectors throughout 5th floor north area. limit occupancy to rooms RT 5A117/5A118 only
Alarm Test Passed 11/17/2014 at 12:00 AM 11/17/2014
Occupancy Inspection - Codes Commercial Full C of O 11/18/2014 at 12:00 AM 11/18/2014
Misc
Resolved
11/18/2014
FIRE DEPARTMENT YET TO APPROVE FIRE COMMAND SYSTEM
Misc
Resolved
11/18/2014
TEMPORARY OCCUPANCY APPROVAL EXTENDED THROUGH NOVEMBER 25, 2014 IN RESPONSE TO 11/6/14 E-MAIL REQUEST FROM JONATHAN VANDE KROL / JE DUNN.
Documents & Images
Date Uploaded File Type Document Name
10/07/2013 Letter Fire Building Plan Review
10/15/2013 Letter Codes Plan Review Conditions
10/30/2013 Letter Fire Building Plan Review
11/06/2013 Letter Codes Plan Review Conditions
11/06/2013 Letter Codes Plan Review Conditions
11/08/2013 Letter Fire Building Plan Review
11/11/2013 Letter Codes Building Permit
11/14/2013 Letter Inspection Summary
11/15/2013 Letter Inspection Summary
11/20/2013 Letter Inspection Summary
11/26/2013 Letter Inspection Summary
12/02/2013 Letter Inspection Summary
12/04/2013 Letter Inspection Summary
12/09/2013 Letter Inspection Summary
12/16/2013 Letter Inspection Summary
12/20/2013 Letter Inspection Summary
12/27/2013 Letter Inspection Summary
12/31/2013 Letter Inspection Summary
01/03/2014 Letter Inspection Summary
01/06/2014 Letter Inspection Summary
01/09/2014 Letter Inspection Summary
01/10/2014 Letter Inspection Summary
01/15/2014 Letter Inspection Summary
01/17/2014 Letter Inspection Summary
01/21/2014 Letter Inspection Summary
01/22/2014 Letter Inspection Summary
01/22/2014 Letter Inspection Summary
01/24/2014 Letter Inspection Summary
01/27/2014 Letter Fire (Sprinkler) Plan Review
01/28/2014 Letter Inspection Summary
01/31/2014 Letter Inspection Summary
02/10/2014 Letter Inspection Summary
02/12/2014 Letter Inspection Summary
02/20/2014 Letter Inspection Summary
02/24/2014 Letter Inspection Summary
02/26/2014 Letter Inspection Summary
02/27/2014 Letter Inspection Summary
03/05/2014 Letter Inspection Summary
03/21/2014 Letter Inspection Summary
03/25/2014 Letter Inspection Summary
04/07/2014 Letter Inspection Summary
04/23/2014 Letter Inspection Summary
05/29/2014 Letter Codes Temporary Certificate of Occupancy
06/02/2014 Letter Inspection Summary
08/18/2014 Letter Fire Loss Reduction Form
09/04/2014 Letter Codes Temporary Certificate of Occupancy
09/12/2014 Letter Fire Loss Reduction Form
09/30/2014 Letter Codes Temporary Certificate of Occupancy
09/30/2014 Letter Codes Temporary Certificate of Occupancy
11/04/2014 Letter Codes 10 Day Letter
11/06/2014 Letter Codes Temporary Certificate of Occupancy
11/18/2014 Letter Field Certificate of Occupancy
11/19/2014 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home