Permit Application Status

PRCOM20130766


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20130766
Building Permit - Commercial
Final Completion
SUMMIT WOODS SPE LLC
ALTERATION COMMERCIAL
REMODEL OF COSMETIC AREA
04/29/2013
06/11/2013
11/04/2013
09/26/2013
Locations
Contacts
CRANE CONSTRUCTION COMPANY, Address:PO BOX 298, Phone:(816) 324-5951  
MC ELECTRIC, Address:2701 S 96TH ST, Phone:(913) 721-2988  
CASCO CORP, Address:10877 WATSON RD  
SUMMIT WOODS SPE LLC, Address:1 E WASHINGTON ST STE 300  
SUMMIT WOODS SPE LLC, Address:PO BOX 2148  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 06/24/2013 06/19/2013
Mike Weisenborn
Fire Plan Review Approved 06/24/2013 06/19/2013
Brian Austerman
Misc
Corrective Action Required
06/19/2013

No additional FD comments
Licensed Contractors Approved 11/04/2013 06/07/2013
Caroline Wiggins
Business License
Corrective Action Required
04/29/2013

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the name of the licensed general contractor. A minimum of a Class B license is required. This information is required for permit approval.
License contractors
Corrective Action Required
05/08/2013

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action Required - Provide the name of the licensed electrical contractor and the mechancial contractor if applicable. This information is required for permit approval.
Building Plan Review Approved 05/09/2013 05/08/2013
Mike Weisenborn
Fire Plan Review Approved 05/09/2013 04/29/2013
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
04/29/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide plans if modifications are required
Construction documents for fire alarm systems
Corrective Action Required
04/29/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide plans if modifications are required
FD1411.2 Maintenance (Egress)
Corrective Action Required
05/08/2013

Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Action required - This comment is for information purposes.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $62.68 $62.68 Paid 06/11/2013
$62.68
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Passed 6/17/2013 at 12:00 AM 06/17/2013
Above Ceiling Inspection Partial 6/19/2013 at 12:00 AM 06/19/2013
Misc
Partial Correction
06/19/2013
NO ISSUES FOUND ON CONSTRUCTION OF LIGHT-GAUGE STEEL SOFFIT. HOWEVER, SUBSEQUENT ABOVE-GRID INSPECTION WILL BE REQUIRED BEFORE FINAL INSPECTION. ADVISE ELECTRICAL CONTRACTOR ALL ABOVE-CEILING WIRING AND DEVICES MUST BE CONFORMING AT THAT TIME.
Above Ceiling Inspection Passed 9/26/2013 at 12:00 AM 09/26/2013
Misc
Resolved
09/26/2013
NO ISSUES FOUND ON CONSTRUCTION OF LIGHT-GAUGE STEEL SOFFIT. HOWEVER, SUBSEQUENT ABOVE-GRID INSPECTION WILL BE REQUIRED BEFORE FINAL INSPECTION. ADVISE ELECTRICAL CONTRACTOR ALL ABOVE-CEILING WIRING AND DEVICES MUST BE CONFORMING AT THAT TIME.
Final Inspection - Commercial Passed 9/26/2013 at 12:00 AM 09/26/2013
Occupancy Inspection - Fire Passed 9/26/2013 at 12:00 AM 09/26/2013
Documents & Images
Date Uploaded File Type Document Name
05/08/2013 Letter Plan Review Conditions
06/10/2013 Letter Plan Review Conditions
06/11/2013 Letter Building Permit
06/17/2013 Letter Inspection Summary
06/19/2013 Letter Inspection Summary
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Building Plan Review
09/26/2013 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home