Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
|
05/23/2013
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
Plans received 5/23/2013, released 5/23/2013
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
|
04/15/2013
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
Control valve in corridor needs to be marked with the suite number
|
|
|
Licensed Contractors
|
Approved
|
09/02/2013
|
03/25/2013
|
|
Codes Admin
|
|
Business License
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required - Provide the name of the licensed general contractor. Either a Class A or B license is required. This information is required for permit approval.
|
|
License contractors
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances.
Action required - Provide the names of the licensed mechanical, electrical and plumbing contractors for the project. This informaiton is required for permit approval.
|
|
|
Building Plan Review
|
Approved
|
03/18/2013
|
03/12/2013
|
|
Mike Weisenborn
|
|
Suite address
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required - The building has suites A through D moving from east to west assigned to it. This space should be either B or C. Provide the suite letter for the space.
Mike Weisenborn 03/12/2013 3:59 PM - This space will be Unit B.
|
|
Misc
Corrective Action Required
The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will need to be verified by the city inspection staff.
Action required - This comment is for information purposes and will be verified on inspection.
|
|
Misc
The plans show an electrical transformer to be installed above the ceiling in the work room area. No installation details are provided.
Action required - Provide the weight of the transformer and details for the installation.
Mike Weisenborn 03/12/2013 4:00 PM - Information has been provided.
|
|
|
Fire Plan Review
|
Approved
|
03/18/2013
|
03/11/2013
|
|
Brian Austerman
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide sprinkler plans for approval for any modifications. Sprinkler control valve for the space must be labeled. verified at inspection
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide alarm plans for approval for any additions or modifications to the existing system
|
|
Misc
Corrective Action Required
Resub approved without further LSFD comments
|
|
|
Building Plan Review
|
Rejected
|
03/07/2013
|
03/06/2013
|
|
Mike Weisenborn
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required - The building has suites A through D moving from east to west assigned to it. This space should be either B or C. Provide the suite letter for the space.
|
|
Misc
Corrective Action Required
The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will need to be verified by the city inspection staff.
Action required - This comment is for information purposes and will be verified on inspection.
|
|
Misc
Corrective Action Required
The plans show an electrical transformer to be installed above the ceiling in the work room area. No installation details are provided.
Action required - Provide the weight of the transformer and details for the installation.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/07/2013
|
02/25/2013
|
|
Brian Austerman
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide sprinkler plans for approval for any modifications. Sprinkler control valve for the space must be labeled. verified at inspection
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide alarm plans for approval for any additions or modifications to the existing system
|
|
|