Summary
PRCOM20130179
Building Permit - Commercial
Final Completion
BANK OF AMERICA
ALTERATION COMMERCIAL
CAP ADD DRIVE UP ATM
02/07/2013
04/04/2013
08/18/2013
07/16/2015
Locations
Contacts
GUARANTEE INTERIORS INC, Address:2914 LOCUST ST, Phone:(314) 881-3300  
NORTH KANSAS CITY ELECTRIC CO INC, Address:PO BOX 12442, Phone:(816) 421-2352  
BANK OF AMERICA, Address:101 N TRYON ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/05/2013 04/02/2013
Mike Weisenborn
Business License
Resolved
04/02/2013

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the names of the licnesed contractors for the project.
CPTED Plan Review Approved 03/26/2013
Mike Weisenborn
Misc
Corrective Action Required
03/26/2013

Section 9.120. Bank/Financial Services (Amend. #33) A. Lighting requirements – light levels shall be in accordance with the following standards: 1. Indoor-lobby – Light levels of sufficient intensity to provide for high resolution video data recording from the digital video surveillance cameras in accordance with the camera manufacturer’s specifications 2. Outdoor – Minimum lighting levels of 5 footcandles shall be maintained at the stores entrance or shall be sufficiently lit to provide for high resolution video data recording of outside activity within 50 feet of the store entrance Action required - Show that the outdoor lighting level will be meet at the atm.
Misc
Corrective Action Required
03/26/2013

Section 9.130. Bank/Financial Service Stand-Alone ATM (Amend. #33) A. Lighting Requirements B. Video surveillance camera(s), two-color digital high definition, required: 1. To maintain view of vehicle occupants 2. To maintain view of drive through stalls 3. Capable of providing a minimum storage of 30 days of video surveillance data C. View from street to be maintained. Action required - Provide information on the location of the outdoor cameras and verify that 30 days of video surveillance data will be kept.
Misc
Corrective Action Required
03/26/2013

There are two pole lights with metal halide lighting being added. Planning and Development recomends using LED as to meet current UDO standards.
Misc
Corrective Action Required
03/26/2013

Planning and Development - Provide the hight of the new light poles.
Misc
Corrective Action Required
03/26/2013

A sign permit shall be obtained through Planning and Development for the new ATM sign on the canopy.
CPTED Plan Review Rejected 02/20/2013 02/19/2013
Mike Weisenborn
Misc
Corrective Action Required
02/19/2013

Section 9.120. Bank/Financial Services (Amend. #33) A. Lighting requirements – light levels shall be in accordance with the following standards: 1. Indoor-lobby – Light levels of sufficient intensity to provide for high resolution video data recording from the digital video surveillance cameras in accordance with the camera manufacturer’s specifications 2. Outdoor – Minimum lighting levels of 5 footcandles shall be maintained at the stores entrance or shall be sufficiently lit to provide for high resolution video data recording of outside activity within 50 feet of the store entrance Action required - Show that the outdoor lighting level will be meet at the atm.
Misc
Corrective Action Required
02/19/2013

Section 9.130. Bank/Financial Service Stand-Alone ATM (Amend. #33) A. Lighting Requirements B. Video surveillance camera(s), two-color digital high definition, required: 1. To maintain view of vehicle occupants 2. To maintain view of drive through stalls 3. Capable of providing a minimum storage of 30 days of video surveillance data C. View from street to be maintained. Action required - Provide information on the location of the outdoor cameras and verify that 30 days of video surveillance data will be kept.
Misc
Corrective Action Required
02/19/2013

There are two pole lights with metal halide lighting being added. Planning and Development recomends using LED as to meet current UDO standards.
Misc
Corrective Action Required
02/19/2013

Planning and Development - Provide the hight of the new light poles.
Misc
Corrective Action Required
02/19/2013

A sign permit shall be obtained through Planning and Development for the new ATM sign on the canopy.
Licensed Contractors Rejected 02/20/2013 02/19/2013
Mike Weisenborn
Business License
Corrective Action Required
02/19/2013

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the names of the licnesed contractors for the project.
Building Plan Review Approved 02/20/2013 02/19/2013
Mike Weisenborn
Misc
Corrective Action Required
04/02/2013

CPTED requirements shall be met as agreed apon in the email to Jennifer Thompson dated March 26, 2013. A copy of the email is in documents and images. Action required - This will be verified on inspection.
Fire Plan Review Approved 02/20/2013 02/08/2013
Brian Austerman
Misc
Corrective Action Required
02/08/2013

No Fire Department comments
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $197.94 $197.94 Paid 04/04/2013
$197.94
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Investigation Inspection Complete 10/1/2013 at 12:00 AM 10/01/2013
Final Electrical Inspection - Commercial Passed 7/16/2015 at 12:00 AM 07/16/2015
Documents & Images
Date Uploaded File Type Document Name
02/19/2013 Letter Plan Review Conditions
03/26/2013 Letter Email - Planning
04/02/2013 Letter CPTED email
04/02/2013 Letter Plan Review Conditions
04/04/2013 Letter Building Permit
06/25/2013 Letter Fire Building Plan Review
09/03/2013 Letter Codes 140 Day Letter
10/01/2013 Letter Codes 180 Day Letter
10/01/2013 Letter Codes 180 Day Letter
07/16/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents