Permit Application Status

PRCOM20130027


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20130027
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
SAINT LUKES EAST RADIATION ONCOLOGY/UROLOGY ADDITION AND FIRST FLOOR TENANT FINISH. THE RADIATION ONCOLOGY SUITE IS PART OF THE HOSPITAL AND IS ADDRESS 100 NE SAINT LUKE'S BLVD. THE UROLOGY SUITE IS ADDRESSED 110 NE SAINT LUKE'S BLVD, UNIT 120. THE BUILDING ADDITION IS 2,414 SF. THE TOTAL FINISHED SPACE COVERED UNDER THIS PERMIT IS 14,784 SF.
01/09/2013
03/01/2013
10/06/2014
11/18/2013
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
CAPITAL ELECTRIC CONSTRUCTION INC, Address:PO BOX 410079, Phone:(913) 335-1214  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
ACI BOLAND, Address:11229 NALL SUITE 140  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 03/07/2013 08/06/2013
Brian Austerman
Hazardous material identification
Corrective Action Required
08/06/2013

2006 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. For information only, mark doors or areas accordingly. Verified at inspection
Misc
Corrective Action Required
08/06/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Action Required: Provide certification of system
Construction documents - Fire protection systems
Corrective Action Required
08/06/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide sprinkler plans for approval, include standpipes at exterior doors if not already existing
Construction documents for fire alarm systems
Corrective Action Required
08/06/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide alarm plans for approval
Misc
Corrective Action Required
08/06/2013

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble. Required for systems over 2,000 CFM. for information only, apply as required.
Misc
Corrective Action Required
08/06/2013

Provide approval documentation from state and federal agencies as required for the LINAC unit
Knox box required
Corrective Action Required
08/06/2013

6/19/2013 2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a knox box at the gate for FD access. Cal;l (816)969-1300 to obtain a knox box application
Misc
Corrective Action Required
08/06/2013

8/6/13 Review of revisions for temporary RT offices. No additional FD comments
Fire Plan Review Approved with Conditions 03/07/2013 06/19/2013
Brian Austerman
Hazardous material identification
Corrective Action Required
06/19/2013

2006 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. For information only, mark doors or areas accordingly. Verified at inspection
Misc
Corrective Action Required
06/19/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Action Required: Provide certification of system
Construction documents - Fire protection systems
Corrective Action Required
06/19/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide sprinkler plans for approval, include standpipes at exterior doors if not already existing
Construction documents for fire alarm systems
Corrective Action Required
06/19/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide alarm plans for approval
Misc
Corrective Action Required
06/19/2013

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble. Required for systems over 2,000 CFM. for information only, apply as required.
Misc
Corrective Action Required
06/19/2013

Provide approval documentation from state and federal agencies as required for the LINAC unit
Knox box required
Corrective Action Required
06/19/2013

6/19/2013 2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a knox box at the gate for FD access. Cal;l (816)969-1300 to obtain a knox box application
Building Plan Review Approved 06/18/2013 06/17/2013
Mike Weisenborn
Sprinkler Plan Review Released for Construction 04/08/2013
Brian Austerman
Misc
Corrective Action Required
04/08/2013

Verify existence and location of the standpipe in the first floor corridor where connection is to be made. There should be one on each side of the fire door.
Misc
Corrective Action Required
04/08/2013

Relabel the sign on Building "C" FDC to reflect added area that the pump serves
Misc
Corrective Action Required
04/08/2013

Will the 5th floor of "F" building be served off of this system?
Installation acceptance testing
Corrective Action Required
04/08/2013

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call 969-1300 to schedule hydrostatic and flow testing
Building Plan Review Approved 03/27/2013 04/01/2013
Mike Weisenborn
Fire Plan Review Approved with Conditions 03/27/2013 03/21/2013
Brian Austerman
Hazardous material identification
Corrective Action Required
03/21/2013

2006 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. For information only, mark doors or areas accordingly. Verified at inspection
Misc
Corrective Action Required
03/21/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Action Required: Provide certification of system
Construction documents - Fire protection systems
Corrective Action Required
03/21/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide sprinkler plans for approval, include standpipes at exterior doors if not already existing
Construction documents for fire alarm systems
Corrective Action Required
03/21/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide alarm plans for approval
Misc
Corrective Action Required
03/21/2013

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble. Required for systems over 2,000 CFM. for information only, apply as required.
Misc
Corrective Action Required
03/21/2013

Provide approval documentation from state and federal agencies as required for the LINAC unit
Final Development Plan Review Approved 02/28/2013 03/01/2013
Mike Weisenborn
Fire Plan Review Approved with Conditions 03/07/2013 02/28/2013
Tracy Deister
Misc
Corrective Action Required
02/28/2013

2006 (IFC) Ammended- 2701.4 Permits. Permits shall be required as set forth in sections 105.6 and 105.7. The Hazardous Materials Permit shall encompass all materials that pose a significant risk to the life and property due to quantity or Physical and chemical properties. Action Required: Call (816) 969-1300 to obtain a Hazardous Materials Permit for the LINAC unit.
Hazardous material identification
Corrective Action Required
02/28/2013

2006 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. For information only, mark doors or areas accordingly. Verified at inspection
Misc
Corrective Action Required
02/28/2013

2701.5.1 Hazardous Materials Management Plan. Where required by the fire code official, each application for a permit shall include a Hazardous Materials Management Plan (HMMP). The HMMP shall include a facility site plan designating the following: 1. Storage and use areas. 2. Maximum amount of each material stored or used in each area. 3. Range of container sizes. 4. Locations of emergency isolation and mitigation valves and devices. 5. Product conveying piping containing liquids or gases, other than utility-owned fuel gas lines and low-pressure fuel gas lines. 6. On and off positions of valves for valves that are of the self-indicating type. 7. Storage plan showing the intended storage arrangement, including the location and dimensions of aisles. 8. The location and type of emergency equipment.The plans shall be legible and drawn approximately to scale. Separate distribution systems are allowed to be shown on separate pages. Action Required: provide a Radiation management plan including emergency procedures, identification of sources and quantity and protection of sources and safeguards on equipment.
Misc
Corrective Action Required
02/28/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Action Required: Provide certification of system
Construction documents - Fire protection systems
Corrective Action Required
02/28/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide sprinkler plans for approval, include standpipes at exterior doors if not already existing
Construction documents for fire alarm systems
Corrective Action Required
02/28/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide alarm plans for approval
Misc
Corrective Action Required
02/28/2013

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble. Required for systems over 2,000 CFM. for information only, apply as required.
Misc
Corrective Action Required
02/28/2013

Provide approval documentation from state and federal agencies as required for the LINAC unit
Building Plan Review Approved with Conditions 03/07/2013 02/28/2013
Tracy Deister
Final Development Plan
Resolved
03/04/2013

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required - This comment is for information purposes.
Misc
Resolved
03/04/2013

I am unable to locate the actual area (square footage) of this project. Action required - Provide the area of this project.
Misc
Resolved
03/04/2013

I am unable to locate information on the exterior gate from the mechaincial area at exit corridor 1F013. Action required - Provide informaiton on the locking device and hardware to be used on the gate.
NEC - Receptacles - Grounding
Resolved
03/04/2013

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - I am unable to locate information on how this requirement is being met. Provide additional informaiton.
Suite address
Resolved
03/04/2013

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required - Will these spaces have suite numbers assigned. If so they should start with 1 and can you provide them please.
Building Plan Review Rejected 01/24/2013 01/23/2013
Mike Weisenborn
Final Development Plan
Corrective Action Required
01/23/2013

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required - This comment is for information purposes.
Misc
Corrective Action Required
01/23/2013

I am unable to locate the actual area (square footage) of this project. Action required - Provide the area of this project.
Misc
Corrective Action Required
01/23/2013

I am unable to locate information on the exterior gate from the mechaincial area at exit corridor 1F013. Action required - Provide informaiton on the locking device and hardware to be used on the gate.
NEC - Receptacles - Grounding
Corrective Action Required
01/23/2013

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - I am unable to locate information on how this requirement is being met. Provide additional informaiton.
Suite address
Corrective Action Required
01/23/2013

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required - Will these spaces have suite numbers assigned. If so they should start with 1 and can you provide them please.
Licensed Contractors Approved 01/23/2013 01/23/2013
Mike Weisenborn
Fire Plan Review Approved with Conditions 01/24/2013 01/14/2013
Brian Austerman
Misc
Corrective Action Required
01/14/2013

2006 (IFC) Ammended- 2701.4 Permits. Permits shall be required as set forth in sections 105.6 and 105.7. The Hazardous Materials Permit shall encompass all materials that pose a significant risk to the life and property due to quantity or Physical and chemical properties. Action Required: Call (816) 969-1300 to obtain a Hazardous Materials Permit for the LINAC unit.
Hazardous material identification
Corrective Action Required
01/14/2013

2006 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. For information only, mark doors or areas accordingly. Verified at inspection
Misc
Corrective Action Required
01/14/2013

2701.5.1 Hazardous Materials Management Plan. Where required by the fire code official, each application for a permit shall include a Hazardous Materials Management Plan (HMMP). The HMMP shall include a facility site plan designating the following: 1. Storage and use areas. 2. Maximum amount of each material stored or used in each area. 3. Range of container sizes. 4. Locations of emergency isolation and mitigation valves and devices. 5. Product conveying piping containing liquids or gases, other than utility-owned fuel gas lines and low-pressure fuel gas lines. 6. On and off positions of valves for valves that are of the self-indicating type. 7. Storage plan showing the intended storage arrangement, including the location and dimensions of aisles. 8. The location and type of emergency equipment.The plans shall be legible and drawn approximately to scale. Separate distribution systems are allowed to be shown on separate pages. Action Required: provide a Radiation management plan including emergency procedures, identification of sources and quantity and protection of sources and safeguards on equipment.
Misc
Corrective Action Required
01/14/2013

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Action Required: Provide certification of system
Construction documents - Fire protection systems
Corrective Action Required
01/14/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide sprinkler plans for approval, include standpipes at exterior doors if not already existing
Construction documents for fire alarm systems
Corrective Action Required
01/14/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide alarm plans for approval
Misc
Corrective Action Required
01/14/2013

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble. Required for systems over 2,000 CFM. for information only, apply as required.
Misc
Corrective Action Required
01/14/2013

Provide approval documentation from state and federal agencies as required for the LINAC unit
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $17,490.00 $17,490.00 Paid 02/28/2013
$17,490.00
7232302-Saint Lukes Road and Bridge Escrow $714.20 $714.20 Paid 05/05/2014
$714.20
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 3/1/2013 3/1/2013 at 12:00 AM 03/01/2013
Misc
Partial Correction
03/01/2013
OK TO COVER WHEN READY UNDER-SLAB C.I. DWV PIPING AT FOLLOWING LOCATIONS: ALL FROM (4) WEST TO (9);
Underslab Electrical Inspection - Commercial Partial 3/1/2013 3/1/2013 at 12:00 AM 03/01/2013
Misc
Partial Correction
03/01/2013
OK TO COVER WHEN READY SCH 40 6" PVC CONDUIT UNDER GRADE BEAM @ (DD.5)/(12) AND SWEEP UP ABOVE FLOOR ELEVATION INSIDE BUILDING;
Misc
Partial Correction
03/01/2013
OK TO COVER WHEN READY UNDER-SLAB SCH 40 2-1/2" PVC CONDUIT FROM (H)/(9) TO 18' NW;
Rated Assembly Inspection Partial 3/13/2013 3/13/2013 at 12:00 AM 03/13/2013
Misc
Partial Correction
03/13/2013
OK TO APPLY 2ND LAYER OF GWB @ N&NE WALLS OF 1F150 & 1F151;
Underground Electrical Inspection - Commercial Partial 3/13/2013 3/13/2013 at 12:00 AM 03/13/2013
Misc
Partial Correction
03/13/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION;
Rated Assembly Inspection Partial 3/18/2013 3/18/2013 at 12:00 AM 03/18/2013
Misc
Partial Correction
03/13/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Rated Assembly Inspection Partial 3/21/2013 3/21/2013 at 12:00 AM 03/21/2013
Misc
Partial Correction
03/18/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Partial Correction
03/21/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Underground Electrical Inspection - Commercial Partial 3/25/2013 3/26/2013 at 12:00 AM 03/26/2013
Misc
Partial Correction
03/13/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
In-wall Inspection Partial 4/1/2013 4/1/2013 at 12:00 AM 04/01/2013
Misc
Partial Correction
04/01/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL PLAN NORTH OF CORRIDOR 1F007 EXCEPT 1F007A; 008A; 200; 201; 217;
Underground Electrical Inspection - Commercial Partial 4/3/2013 4/3/2013 at 12:00 AM 04/03/2013
Misc
Partial Correction
03/26/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH AND WEST SIDES;
Underground Electrical Inspection - Commercial Partial 4/3/2013 4/3/2013 at 12:00 AM 04/03/2013
Underground Electrical Inspection - Commercial Partial 4/3/2013 at 12:00 AM 04/03/2013
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH, WEST AND NORTH SIDES EXCEPT FOR THREE LOCATIONS WHERE EXOTHERMIC WELD CONNECTIONS ARE TO BE COMPLETED AND INSPECTED BEFORE COVERING
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Underground Electrical Inspection - Commercial Partial 4/3/2013 at 12:00 AM 04/03/2013
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH, WEST AND NORTH SIDES EXCEPT FOR THREE LOCATIONS WHERE EXOTHERMIC WELD CONNECTIONS ARE TO BE COMPLETED AND INSPECTED BEFORE COVERING
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Misc
Partial Correction
04/03/2013
MATERIAL AND WORKMANSHIP OK TO COVER WHEN READY UNDER-SLAB PVC ELECT CONDUITS + ONE 6" RACEWAY FOR PLUMBING LINES BELOW SPACES 1A127 & 1A128A
In-wall Inspection Partial 4/8/2013 4/8/2013 at 12:00 AM 04/08/2013
Misc
Partial Correction
04/01/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 1F007A, 008A, 200, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147
Underslab Plumbing Inspection - Commercial Passed 4/10/2013 at 12:00 AM 04/10/2013
Underslab Electrical Inspection - Commercial Partial 4/10/2013 4/10/2013 at 12:00 AM 04/10/2013
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH, WEST AND NORTH SIDES EXCEPT FOR THREE LOCATIONS WHERE EXOTHERMIC WELD CONNECTIONS ARE TO BE COMPLETED AND INSPECTED BEFORE COVERING
Misc
Partial Correction
04/03/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Misc
Partial Correction
04/03/2013
MATERIAL AND WORKMANSHIP OK TO COVER WHEN READY UNDER-SLAB PVC ELECT CONDUITS + ONE 6" RACEWAY FOR PLUMBING LINES BELOW SPACES 1A127 & 1A128A
Misc
Partial Correction
04/10/2013
OK TO COVER WHEN READY SCH 40 6" PVC CONDUIT UNDER GRADE BEAM @ (DD.5)/(12) AND SWEEP UP ABOVE FLOOR ELEVATION INSIDE BUILDING;
Misc
Partial Correction
04/10/2013
OK TO COVER WHEN READY UNDER-SLAB SCH 40 2-1/2" PVC CONDUIT FROM (H)/(9) TO 18' NW;
Misc
Partial Correction
04/10/2013
NO ISSUES WITH MATERIAL OR WORKMANSHIP AT UNDER-SLAB PVC CONDUIT @ LINAC #1 & #2. OK TO COVER WHEN READY
In-wall Inspection Partial 4/12/2013 (8:00 to 5:00) 4/12/2013 at 12:00 AM 04/12/2013
Misc
Partial Correction
04/08/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 1F007A, 008A, 200, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117;
Rated Assembly Inspection Partial 4/12/2013 at 12:00 AM 04/12/2013
Misc
Partial Correction
03/21/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Partial Correction
03/21/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Misc
Partial Correction
04/12/2013
RATED WALL DOG-LEGGED AT 1F151 WEST/NORTHWEST ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRE-SEAL EXCEPT E-W LEG AT TOP 24" NEXT TO CONCRETE BEAM NEEDS TO BE MORE SECURELY FASTENED TO FRAMING
In-wall Inspection Partial 4/17/2013 at 12:00 AM 04/17/2013
Misc
Partial Correction
04/12/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 1F007A, 008A, 200, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200
Rated Assembly Inspection Partial 4/17/2013 at 12:00 AM 04/17/2013
Misc
Partial Correction
04/12/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Partial Correction
04/12/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Misc
Partial Correction
04/12/2013
RATED WALL DOG-LEGGED AT 1F151 WEST/NORTHWEST ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRE-SEAL EXCEPT E-W LEG AT TOP 24" NEXT TO CONCRETE BEAM NEEDS TO BE MORE SECURELY FASTENED TO FRAMING *LID AT TOP OF 1F151 RATED WALL
Underground Electrical Inspection - Commercial Partial 4/17/2013 4/17/2013 at 12:00 AM 04/17/2013
Misc
Partial Correction
04/17/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH, WEST AND NORTH SIDES EXCEPT FOR THREE LOCATIONS WHERE EXOTHERMIC WELD CONNECTIONS ARE TO BE COMPLETED AND INSPECTED BEFORE COVERING
Misc
Partial Correction
04/17/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Misc
Partial Correction
04/17/2013
MATERIAL AND WORKMANSHIP OK TO COVER WHEN READY UNDER-SLAB PVC ELECT CONDUITS + ONE 6" RACEWAY FOR PLUMBING LINES BELOW SPACES 1A127 & 1A128A
Misc
Partial Correction
04/17/2013
-GROUND RING WITH RODS AT 3 LOCATIONS
In-wall Inspection Partial 4/23/2013 4/23/2013 at 12:00 AM 04/23/2013
Misc
Partial Correction
04/17/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Rated Assembly Inspection Partial 4/23/2013 at 12:00 AM 04/23/2013
Misc
Partial Correction
04/17/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Partial Correction
04/17/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Misc
Partial Correction
04/17/2013
RATED WALL DOG-LEGGED AT 1F151 WEST/NORTHWEST ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRE-SEAL INCLUDING E-W LEG AT TOP 24" WITH LID CONSTRUCTED TO CLOSE TO CONCRETE BEAM
Rated Assembly Inspection Partial 4/25/2013 4/25/2013 at 12:00 AM 04/25/2013
Misc
Partial Correction
04/23/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Partial Correction
04/23/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Misc
Partial Correction
04/23/2013
RATED WALL DOG-LEGGED AT 1F151 WEST/NORTHWEST ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRE-SEAL INCLUDING E-W LEG AT TOP 24" WITH LID CONSTRUCTED TO CLOSE TO CONCRETE BEAM
Misc
Partial Correction
04/25/2013
PER DESIGN REVISION, 1-HR RATED LID AT AF209A: FRAMING AND 1" LINER BOARD OK TO PLACE ONE LAYER OF 5/8" TYPE X GWB + TAPE AND MUD.
Misc
Partial Correction
04/25/2013
OK TO COVER WHEN READY CORRIDOR CROSS-WALL AT DOOR 1F108 BOTH FACES 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
04/25/2013
OK TO TAPE & MUD WHEN READY SPACES 1F109 & 110 BOTH FACES ONE LAYER 5/8" TYPE X GWB
Rated Assembly Inspection Partial 4/29/2013 4/29/2013 at 12:00 AM 04/29/2013
Misc
Partial Correction
04/25/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Partial Correction
04/25/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Misc
Partial Correction
04/25/2013
RATED WALL DOG-LEGGED AT 1F151 WEST/NORTHWEST ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRE-SEAL INCLUDING E-W LEG AT TOP 24" WITH LID CONSTRUCTED TO CLOSE TO CONCRETE BEAM
Misc
Partial Correction
04/25/2013
PER DESIGN REVISION, 1-HR RATED LID AT 1F109A: FRAMING +1" LINER BOARD + 1 LAYER OF 5/8" TYPE X GWB OK TO TAPE AND MUD.
Misc
Partial Correction
04/25/2013
CORRIDOR WALL AND CROSS-WALL AT DOOR 1F108 BOTH FACES 2 LAYERS 5/8" TYPE X GWB OK TO TAPE, MUD AND FIRE-SEAL
Misc
Partial Correction
04/25/2013
OK TO TAPE & MUD WHEN READY SPACES 1F109 & 110 BOTH FACES ONE LAYER 5/8" TYPE X GWB
Above Ceiling Inspection Partial 4/30/2013 at 12:00 AM 04/30/2013
Misc
Partial Correction
04/30/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200;
Rated Assembly Inspection Partial 5/3/2013 at 12:00 AM 05/03/2013
Misc
Resolved
05/03/2013
N&NE WALLS OF 1F150&1F151: OK TO APPLY 2ND LAYER OF GWB; GWB PERIMETER FIRE-CAULKED & APPROVED TO COVER
Misc
Resolved
05/03/2013
FOLLOWING TYPE (P) WALL SECTIONS OK TO TOP OUT (6') GWB ONE FACE FOR ADJACENT HVAC DUCT TO BE HUNG: ~24' OF 1F007 EAST WALL ACROSS FROM PASSENGER ELEVATORS; ~24' OF 1F100 NW WALL;
Misc
Resolved
05/03/2013
RATED WALL DOG-LEGGED AT 1F151 WEST/NORTHWEST ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRE-SEAL INCLUDING E-W LEG AT TOP 24" WITH LID CONSTRUCTED TO CLOSE TO CONCRETE BEAM
Misc
Resolved
05/03/2013
PER DESIGN REVISION, 1-HR RATED LID AT 1F109A: FRAMING +1" LINER BOARD + 1 LAYER OF 5/8" TYPE X GWB OK TO TAPE AND MUD.
Misc
Resolved
05/03/2013
CORRIDOR WALL AND CROSS-WALL AT DOOR 1F108 BOTH FACES 2 LAYERS 5/8" TYPE X GWB OK TO TAPE, MUD AND FIRE-SEAL
Misc
Resolved
05/03/2013
OK TO TAPE & MUD WHEN READY SPACES 1F109 & 110 BOTH FACES ONE LAYER 5/8" TYPE X GWB
Misc
Partial Correction
05/03/2013
OK TO ENCLOSE RATED ASSEMBLY AT N CORNER OF 1F120 NOW FIRE-TAPED AND FIRE-SEALED
Above Ceiling Inspection Partial 5/3/2013 at 12:00 AM 05/03/2013
Misc
Partial Correction
04/30/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW;
In-wall Inspection Partial 5/3/2013 5/3/2013 at 12:00 AM 05/03/2013
Misc
Partial Correction
04/23/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007; 1F007A; 1F100; 101; 102; 103-1; 103-2; 104-110; 112-118; 121; 123; 125; 133; 135; 136; 138, 139; 141; 141A; 142-145; 147; 200;
Misc
Partial Correction
04/24/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Misc
Partial Correction
04/24/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Rough Framing Inspection - Commercial Partial 5/8/2013 (8:00 to 5:00) 5/8/2013 at 12:00 AM 05/08/2013
Misc
Partial Correction
05/08/2013
OK TO COVER WHEN READY PARAPET FRAMING AT RADIOLOGY BUNKER ROOF W, NW, AND SW;
In-wall Inspection Partial 5/8/2013 (8:00 to 5:00) 5/8/2013 at 12:00 AM 05/08/2013
Misc
Partial Correction
05/03/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007; 1F007A; 1F100; 101; 102; 103-1; 103-2; 104-110; 112-118; 121; 123; 125; 133; 135; 136; 138, 139; 141; 141A; 142-145; 147; 200; [122; 008A SOUTH WALL; CORRIDOR CROSS-WALL @ 100-2;
Misc
Partial Correction
05/03/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Misc
Partial Correction
05/03/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Above Ceiling Inspection Partial 5/8/2013 at 12:00 AM 05/08/2013
Misc
Partial Correction
05/03/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101;
Rough Framing Inspection - Commercial Partial 5/9/2013 5/9/2013 at 12:00 AM 05/09/2013
Misc
Partial Correction
05/08/2013
OK TO COVER WHEN READY PARAPET/COPING FRAMING AT RADIOLOGY BUNKER ROOF COMPLETE
Rough Framing Inspection - Commercial Partial 5/16/2013 5/16/2013 at 12:00 AM 05/16/2013
Misc
Partial Correction
05/09/2013
OK TO COVER WHEN READY PARAPET/COPING FRAMING AT RADIOLOGY BUNKER ROOF COMPLETE EXTERIOR FRAMING APPROVED 12 LINE TO 14 LINE AND DD LINE TO EE LINE
Above Ceiling Inspection Partial 5/31/2013 5/31/2013 at 12:00 AM 05/31/2013
Misc
Partial Correction
05/08/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101;
Misc
Partial Correction
05/31/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007 EXCEPT 007A, 008, 008A;
In-wall Inspection Partial 6/4/2013 6/4/2013 at 12:00 AM 06/04/2013
Misc
Resolved
06/04/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007; 1F007A; 1F100; 101; 102; 103-1; 103-2; 104-110; 112-118; 121; 123; 125; 133; 135; 136; 138, 139; 141; 141A; 142-145; 147; 200; [122; 008A SOUTH WALL; CORRIDOR CROSS-WALL @ 100-2;
Misc
Resolved
06/04/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Misc
Resolved
06/04/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: ALL SPACES PLAN NORTH OF CORRIDOR 1F007 EXCEPT 008A, 201 AND 217; 1F138, 1F141, 1F141A, 1F142-145, 1F147; 109; 110; 113; 114; 115; 115; 116; 117; 1F007A; 1F200; [1F101; 102; 103-1; 103-2; 104; 105; 106; 107; 108; 112; 118; 121; 123; 125; 133; 135; 136; 139;
Misc
Partial Correction
06/04/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT: 1F126; 127; 128A; 129; 131; 132 LINAC #1;
Above Ceiling Inspection Partial 6/6/2013 at 12:00 AM 06/06/2013
Misc
Partial Correction
05/31/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101;
Misc
Partial Correction
05/31/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007 EXCEPT 007A, 008, 008A; 1F109; 110; 113; 114; 115; 116; 117; 138; 141; 142; 143; 144; 145;
In-wall Inspection Partial 6/11/2013 6/11/2013 at 12:00 AM 06/11/2013
Misc
Partial Correction
06/04/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT: 1F126; 127; 128A; 129; 131; 132 LINAC #1; AT VAULT DOOR @ LINAC CONTROL 1F131;
Above Ceiling Inspection Partial 6/12/2013 6/11/2013 at 12:00 AM 06/11/2013
Misc
Partial Correction
06/06/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132;
Misc
Partial Correction
06/06/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007 EXCEPT 007A, 008, 008A; 1F109; 110; 113; 114; 115; 116; 117; 138; 141; 142; 143; 144; 145;
Rough Framing Inspection - Commercial Partial 6/11/2013 at 12:00 AM 06/11/2013
Misc
Partial Correction
05/16/2013
OK TO COVER WHEN READY: PARAPET/COPING FRAMING AT RADIOLOGY BUNKER ROOF COMPLETE. EXTERIOR FRAMING 12 LINE TO 14 LINE AND DD LINE TO EE LINE. RAISED FLOOR FRAMING AT DISPLAY 1F008A
Above Ceiling Inspection Partial 6/12/2013 at 12:00 AM 06/12/2013
Misc
Partial Correction
06/11/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132;
Misc
Partial Correction
06/11/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007 EXCEPT 007A, 008, 008A; 1F109; 110; 113; 114; 115; 116; 117; 138; 141; 142; 143; 144; 145; CEILINGS AT FOLLOWING SPACES OK TO COVER WHEN READY EXCEPT AT SMOKE-RESISTIVE WALLS WHERE PENETRATIONS HAVE YET TO BE SEALED: [1F100; 101; 102; 103-1; 103-2; 104; 105; 106; 107; 118; 120; 121; 139; 147]
Above Ceiling Inspection Partial 6/13/2013 6/13/2013 at 12:00 AM 06/13/2013
Misc
Partial Correction
06/12/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132;
Misc
Partial Correction
06/12/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; 100-107; 1F109; 110; 113-118; 120; 121; 138; 141-145; 147;
Above Ceiling Inspection Not Ready 6/14/2013 6/14/2013 at 12:00 AM 06/14/2013
Misc
Partial Correction
06/13/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132;
Misc
Partial Correction
06/13/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; 100-107; 1F109; 110; 113-118; 120; 121; 138; 141-145; 147; ELECTRICAL CONTRACTOR NOT COMPLETED IN SPACES REQUESTED FOR INSPECTION 6/14/13.
In-wall Inspection Partial 6/19/2013 6/19/2013 at 12:00 AM 06/19/2013
Misc
Partial Correction
06/11/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT: 1F126; 127; 128A; 129; 131; 132 LINAC #1; AT VAULT DOOR @ LINAC CONTROL 1F131; WALLS MODIFIED PER PR-11
Above Ceiling Inspection Partial 6/19/2013 6/19/2013 at 12:00 AM 06/19/2013
Misc
Partial Correction
06/14/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132;
Misc
Partial Correction
06/14/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; 100-107; 1F109; 110; 113-118; 120; 121; 138; 141-145; 147; AFTER TEMPORARY ELECTRICAL WIRING IS REMOVED: CORR 1F007 EXCEPT SOUTH 8'; 111; 112; 119; 122; 123; 146
Above Ceiling Inspection Partial 7/12/2013 7/10/2013 at 12:00 AM 07/10/2013
Misc
Partial Correction
06/19/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132; SOFFIT AT 137 NURSE STATION -- AFTER HANGERS ARE ADDED;
Misc
Partial Correction
06/19/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; 100-107; 1F109; 110; 113-118; 120; 121; 138; 141-145; 147; AFTER TEMPORARY ELECTRICAL WIRING IS REMOVED: CORR 1F007 EXCEPT SOUTH 8'; 111; 112; 119; 122; 123; 146
Above Ceiling Inspection Partial 7/15/2013 7/15/2013 at 12:00 AM 07/15/2013
Misc
Partial Correction
07/10/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132; SOFFIT AT 137 NURSE STATION -- AFTER HANGERS ARE ADDED;
Misc
Partial Correction
07/10/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; CORR 1F007 EXCEPT SOUTH 8'; 1F008; 008A; 100-107; 1F109; 110; 111; 112; 113-118; 119; 120; 121; 122; 123; 138; 141-145; 146; 147; AFTER TEMPORARY ELECTRICAL WIRING IS REMOVED: 1F124; 125; 126; 128A; 129; 131; 133; 133A; 135; 136; 140;
Above Ceiling Inspection Partial 7/23/2013 at 12:00 AM 07/23/2013
Misc
Resolved
07/23/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 1F200; SOFFIT AT CORR 1F108 NW; SOFFIT AT 1F101; GWB CEILING AND PERIMETER BULKHEADS @ LINAC 1F132; SOFFIT AT 137 NURSE STATION
Misc
Partial Correction
07/15/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; CORR 1F007 EXCEPT SOUTH 8'; 1F008; 008A; 100-107; 1F109; 110; 111; 112; 113-118; 119; 120; 121; 122; 123; 124; 125; 126; 128A; 129; 131; 133; 133A; 135; 136; 138; 140; 141-145; 146; 147; 137
Underground Electrical Inspection - Commercial Partial 8/1/2013 8/1/2013 at 12:00 AM 08/01/2013
Misc
Resolved
08/01/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH, WEST AND NORTH SIDES EXCEPT FOR THREE LOCATIONS WHERE EXOTHERMIC WELD CONNECTIONS ARE TO BE COMPLETED AND INSPECTED BEFORE COVERING
Misc
Resolved
08/01/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Misc
Resolved
08/01/2013
MATERIAL AND WORKMANSHIP OK TO COVER WHEN READY UNDER-SLAB PVC ELECT CONDUITS + ONE 6" RACEWAY FOR PLUMBING LINES BELOW SPACES 1A127 & 1A128A
Misc
Resolved
08/01/2013
-GROUND RING WITH RODS AT 3 LOCATIONS
Misc
Partial Correction
08/01/2013
OK TO COVER WHEN READY TRENCHED PVC POWER AND GROUNDING CONDUIT FROM W WALL OF BUNKER W TO/AT LOCATION OF GATE.
Sprinkler - Hydrostatic Test Passed 08/15/2013
Sprinkler - Flow Test Passed 08/15/2013
Alarm Test Passed 8/15/2013 at 12:00 AM 08/29/2013
08/15/2013
Misc
Corrective Action Required
08/15/2013
- all card readers need to drop off on alarm activation, corrodors, stairways, passage doors - mag hold open doors need to drop off on alarm activation, come fully closed - on the silence command from the facp - both horns and strobes need to terminate. - new panel check dial out and addressing of panel
Occupancy Inspection - Fire Temporary C of O 8/27/2013 at 12:00 AM 08/29/2013
Misc
Corrective Action Required
08/29/2013
Urology area appeared appropriate at the time of the inspection. -Oncology/Radiation: OK to set up for patients, no patient treatment until LINACs fail safes are all tested - north security gate, keys and or combination for access needed to be placed in knox box. - bldg owners to verify that all red outlets and switches supply power during generator tests.
In-wall Inspection Passed 7/10/2013 6/19/2013 at 12:00 AM 08/29/2013
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT: 1F126; 127; 128A; 129; 131; 132 LINAC #1; AT VAULT DOOR @ LINAC CONTROL 1F131; WALLS MODIFIED PER PR-11
Rated Assembly Inspection Passed 5/3/2013 at 12:00 AM 08/29/2013
Misc
Resolved
08/29/2013
OK TO ENCLOSE RATED ASSEMBLY AT N CORNER OF 1F120 NOW FIRE-TAPED AND FIRE-SEALED
Rough Framing Inspection - Commercial Passed 6/11/2013 at 12:00 AM 08/29/2013
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY: PARAPET/COPING FRAMING AT RADIOLOGY BUNKER ROOF COMPLETE. EXTERIOR FRAMING 12 LINE TO 14 LINE AND DD LINE TO EE LINE. RAISED FLOOR FRAMING AT DISPLAY 1F008A
Underground Electrical Inspection - Commercial Passed 8/1/2013 at 12:00 AM 08/29/2013
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY TRENCHED PVC POWER AND GROUNDING CONDUIT FROM W WALL OF BUNKER W TO/AT LOCATION OF GATE.
Underslab Electrical Inspection - Commercial Passed 4/10/2013 at 12:00 AM 08/29/2013
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY GROUND RING AROUND BUNKER AND WAITING ROOM FOUNDATION: EAST, SOUTH, WEST AND NORTH SIDES EXCEPT FOR THREE LOCATIONS WHERE EXOTHERMIC WELD CONNECTIONS ARE TO BE COMPLETED AND INSPECTED BEFORE COVERING
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY 25' OF SIX 4" PVC ELECT CONDUITS + TWO RUNS OF 2" CONDUIT -- ALL INSIDE WEST WALL ADJACENT TO BUNKER UNDER CONSTRUCTION; ALL CONDUIT FOR BUILDING F UNDERSLAB IN CONTROL ROOM APPROVED
Misc
Resolved
08/29/2013
MATERIAL AND WORKMANSHIP OK TO COVER WHEN READY UNDER-SLAB PVC ELECT CONDUITS + ONE 6" RACEWAY FOR PLUMBING LINES BELOW SPACES 1A127 & 1A128A
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY SCH 40 6" PVC CONDUIT UNDER GRADE BEAM @ (DD.5)/(12) AND SWEEP UP ABOVE FLOOR ELEVATION INSIDE BUILDING;
Misc
Resolved
08/29/2013
OK TO COVER WHEN READY UNDER-SLAB SCH 40 2-1/2" PVC CONDUIT FROM (H)/(9) TO 18' NW;
Misc
Resolved
08/29/2013
NO ISSUES WITH MATERIAL OR WORKMANSHIP AT UNDER-SLAB PVC CONDUIT @ LINAC #1 & #2. OK TO COVER WHEN READY
Occupancy Inspection - Codes Commercial Temporary C of O 8/29/2013 8/30/2013 at 12:00 AM 08/29/2013
Misc
Corrective Action Required
08/29/2013
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Partial Correction
08/29/2013
UROLOGY DEPARTMENT AREA OK FOR OCCUPANCY ONCOLOGY/RADIATION DEPARTMENT AREA OK TO SET UP FOR BUSINESS. NO PATIENTS PRIOR TO APPROVAL. ALL EMERGENCY CIRCUITS MUST BE TESTED ON GENERATOR POWER AND CERTIFIED OPERATIONAL.
Occupancy Inspection - Codes Commercial Temporary C of O 9/25/2013 at 12:00 AM 09/25/2013
Misc
Corrective Action Required
08/29/2013
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Partial Correction
08/29/2013
UROLOGY DEPARTMENT AREA OK FOR OCCUPANCY ONCOLOGY/RADIATION DEPARTMENT AREA OK TO SET UP FOR BUSINESS. NO PATIENTS PRIOR TO APPROVAL. ALL EMERGENCY CIRCUITS MUST BE TESTED ON GENERATOR POWER AND CERTIFIED OPERATIONAL. TCO EXTENDED 9/25/13 TO ACCOMODATE COMPLETION OF SITEWORK AT BUNKER AREA.
Occupancy Inspection - Codes Commercial Temporary C of O 9/26/2013 at 12:00 AM 09/26/2013
Misc
Corrective Action Required
09/25/2013
SITEWORK AT BUKER AREA TO BE COMPLETED & APPROVED.
Misc
Partial Correction
09/25/2013
UROLOGY DEPARTMENT AREA OK FOR OCCUPANCY ONCOLOGY/RADIATION DEPARTMENT AREA OK TO SET UP FOR BUSINESS. TCO EXTENDED 9/26/13 TO ACCOMODATE COMPLETION OF SITEWORK AT BUNKER AREA.
Misc
Corrective Action Required
09/26/2013
RESOLVE ANY ISSUES WITH: - FIRE DEPARTMENT - PLANNING & DEVELOPMENT DEPARTMENT - PUBLIC WORKS DEPARTMENT
Occupancy Inspection - Codes Commercial Partial 9/26/2013 at 12:00 AM 09/26/2013
Misc
Corrective Action Required
09/26/2013
SITEWORK AT BUNKER AREA TO BE COMPLETED & APPROVED.
Misc
Partial Correction
09/26/2013
UROLOGY DEPARTMENT AREA OK FOR OCCUPANCY ONCOLOGY/RADIATION DEPARTMENT AREA OK TO SET UP FOR BUSINESS. TCO EXTENDED 9/26/13 TO ACCOMODATE COMPLETION OF SITEWORK AT BUNKER AREA.
Misc
Corrective Action Required
09/26/2013
RESOLVE ANY ISSUES WITH: - FIRE DEPARTMENT - PLANNING & DEVELOPMENT DEPARTMENT - PUBLIC WORKS DEPARTMENT
Occupancy Inspection - Fire Passed 10/23/2013 at 12:00 AM 10/23/2013
Misc
Corrective Action Required
08/29/2013
Urology area appeared appropriate at the time of the inspection. -Oncology/Radiation: OK to set up for patients, no patient treatment until LINACs fail safes are all tested - north security gate, keys and or combination for access needed to be placed in knox box. - bldg owners to verify that all red outlets and switches supply power during generator tests.
Above Ceiling Inspection Passed 7/23/2013 at 12:00 AM 10/25/2013
Misc
Resolved
10/25/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: ALL PLAN NORTH OF CORR 1F007; CORR 1F007 EXCEPT SOUTH 8'; 1F008; 008A; 100-107; 1F109; 110; 111; 112; 113-118; 119; 120; 121; 122; 123; 124; 125; 126; 128A; 129; 131; 133; 133A; 135; 136; 138; 140; 141-145; 146; 147; 137
Occupancy Inspection - Codes Commercial Full C of O 11/18/2013 at 12:00 AM 11/18/2013
Misc
Resolved
11/18/2013
SITEWORK AT BUNKER AREA TO BE COMPLETED & APPROVED.
Misc
Resolved
11/18/2013
UROLOGY DEPARTMENT AREA OK FOR OCCUPANCY ONCOLOGY/RADIATION DEPARTMENT AREA OK TO SET UP FOR BUSINESS. TCO EXTENDED 9/26/13 TO ACCOMODATE COMPLETION OF SITEWORK AT BUNKER AREA.
Misc
Resolved
11/18/2013
RESOLVE ANY ISSUES WITH: - FIRE DEPARTMENT - PLANNING & DEVELOPMENT DEPARTMENT - PUBLIC WORKS DEPARTMENT
Documents & Images
Date Uploaded File Type Document Name
01/23/2013 Letter Plan Review Conditions
02/28/2013 Letter Building Permit
03/01/2013 Letter Inspection Summary
03/13/2013 Letter Inspection Summary
03/13/2013 Letter Inspection Summary
03/18/2013 Letter Inspection Summary
03/21/2013 Letter Inspection Summary
03/26/2013 Letter Inspection Summary
04/01/2013 Letter Inspection Summary
04/03/2013 Letter Inspection Summary
04/03/2013 Letter Inspection Summary
04/08/2013 Letter Inspection Summary
04/10/2013 Letter Inspection Summary
04/12/2013 Letter Inspection Summary
04/16/2013 Letter CMR
04/17/2013 Letter Inspection Summary
04/23/2013 Letter Inspection Summary
04/25/2013 Letter Inspection Summary
04/29/2013 Letter Inspection Summary
04/30/2013 Letter Inspection Summary
05/03/2013 Letter Inspection Summary
05/08/2013 Letter Inspection Summary
05/09/2013 Letter Inspection Summary
05/16/2013 Letter Inspection Summary
06/11/2013 Letter Inspection Summary
06/12/2013 Letter Inspection Summary
06/13/2013 Letter Inspection Summary
06/14/2013 Letter Inspection Summary
06/19/2013 Letter Inspection Summary
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Building Plan Review
06/26/2013 Letter Fire (Sprinkler) Plan Review
07/10/2013 Letter Inspection Summary
07/15/2013 Letter Inspection Summary
07/23/2013 Letter Inspection Summary
08/01/2013 Letter Inspection Summary
08/14/2013 Letter Fire Building Plan Review
08/29/2013 Letter Fire Loss Reduction Form
08/29/2013 Letter Codes Temporary Certificate of Occupancy
08/30/2013 Letter Fire Loss Reduction Form
09/25/2013 Letter Codes Temporary Certificate of Occupancy
09/26/2013 Letter Codes Temporary Certificate of Occupancy
11/18/2013 Letter Field Certificate of Occupancy
11/19/2013 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home