Permit Application Status

PRCOM20121479


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20121479
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
TENANT EXPANSION
06/29/2012
08/16/2012
01/12/2013
03/07/2013
Locations
Contacts
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
License Tax Codes Approved 08/31/2012 08/13/2012
Mike Weisenborn
Internal Plan Review (Res) Approved 08/31/2012 08/13/2012
Mike Weisenborn
True
Building Plan Review Approved 07/30/2012 07/30/2012
Mike Weisenborn
Business License
Corrective Action Required
07/25/2012

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the name of the licensed general contractor prior to permit approval. A minimum of a Class B license is required.
License contractors
Corrective Action Required
07/25/2012

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Provide the name of the licensed mechanical, electrical and plumbing sub-contractors. This information is required for permit approval.
Accessibility - Refrigerator/Freezer - General requirements
Corrective Action Required
07/25/2012

ICC/ANSI A117.1 2003 804.6.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. A clear floor space, positioned for a parallel approach to the space dedicated to a refrigerator/freezer, shall be provided. The centerline of the clear floor space shall be offset 24 inches maximum from the centerline of the dedicated space. Action required - This comment is for information purposes.
Accessibility - Range or cooktop - General requirements
Corrective Action Required
07/25/2012

ICC/ANSI A117.1 2003 804.6.4 - Range or cooktop. A clear floor space, positioned for a parallel or forward approach to the space for a range or cooktop, shall be provided. Where the clear floor space is positioned for a forward approach, knee and toe clearance complying with Section 306 shall be provided. Where knee and toe space is provided, the underside of the range or cooktop shall be insulated or otherwise configured to prevent burns, abrasions, or electrical shock. The location of controls shall not require reaching across burners. Action required - This comment is for information purposes.
Misc
Corrective Action Required
07/25/2012

Existing fire rated assemblies shall be maintained. Action required - This comment is for information purposes.
NEC - Receptacles - Grounding
Resolved
07/30/2012

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - Provide additional information on the plans.
Fire Plan Review Approved 07/24/2012 07/24/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/24/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Construction documents for fire alarm systems
Corrective Action Required
07/24/2012

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Fire-resistant-rated construction - Maintenance
Corrective Action Required
07/24/2012

2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. For information only. Verified at inspection.
Installation acceptance testing
Corrective Action Required
07/24/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule testing.
Misc
Resolved
07/24/2012

The swing of doors N13 and 2E91 conflict with on e another. It is a RECOMMENDATION that an alternative layout be provided to avoid an accident.
Misc
Resolved
07/24/2012

1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. Provide an exiting plan.
Portable fire extinguishers - general
Resolved
07/24/2012

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show the locations of the fire extinguishers.
Internal Plan Review (Res) Rejected 07/12/2012 07/16/2012
Mike Weisenborn
Fire Plan Review Rejected 07/12/2012 07/13/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/13/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Construction documents for fire alarm systems
Corrective Action Required
07/13/2012

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Fire-resistant-rated construction - Maintenance
Corrective Action Required
07/13/2012

2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. For information only. Verified at inspection.
Installation acceptance testing
Corrective Action Required
07/13/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule testing.
Misc
Corrective Action Required
07/13/2012

The swing of doors N13 and 2E91 conflict with on e another. It is a RECOMMENDATION that an alternative layout be provided to avoid an accident.
Misc
Corrective Action Required
07/13/2012

1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. Provide an exiting plan.
Portable fire extinguishers - general
Corrective Action Required
07/13/2012

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show the locations of the fire extinguishers.
Building Plan Review Rejected 07/12/2012 07/12/2012
Mike Weisenborn
Business License
Corrective Action Required
07/12/2012

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the name of the licensed general contractor prior to permit approval. A minimum of a Class B license is required.
License contractors
Corrective Action Required
07/12/2012

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Provide the name of the licensed mechanical, electrical and plumbing sub-contractors. This information is required for permit approval.
Accessibility - Refrigerator/Freezer - General requirements
Corrective Action Required
07/12/2012

ICC/ANSI A117.1 2003 804.6.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. A clear floor space, positioned for a parallel approach to the space dedicated to a refrigerator/freezer, shall be provided. The centerline of the clear floor space shall be offset 24 inches maximum from the centerline of the dedicated space. Action required - This comment is for information purposes.
Accessibility - Range or cooktop - General requirements
Corrective Action Required
07/12/2012

ICC/ANSI A117.1 2003 804.6.4 - Range or cooktop. A clear floor space, positioned for a parallel or forward approach to the space for a range or cooktop, shall be provided. Where the clear floor space is positioned for a forward approach, knee and toe clearance complying with Section 306 shall be provided. Where knee and toe space is provided, the underside of the range or cooktop shall be insulated or otherwise configured to prevent burns, abrasions, or electrical shock. The location of controls shall not require reaching across burners. Action required - This comment is for information purposes.
Misc
Corrective Action Required
07/12/2012

Existing fire rated assemblies shall be maintained. Action required - This comment is for information purposes.
NEC - Receptacles - Grounding
Corrective Action Required
07/12/2012

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - Provide additional information on the plans.
Zoning Review Approved 03/07/2013 07/12/2012
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $3,297.00 $3,297.00 Paid 08/16/2012
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 8/30/2012 8/30/2012 at 12:00 AM 08/30/2012
Misc
Corrective Action Required
08/30/2012
THE FOLLOWINGS ARE INSPECTED: -WALL FRAMING IN CORRIDORS 2E143, E45
Rough Framing Inspection - Commercial Partial 9/6/2012 9/6/2012 at 12:00 AM 09/06/2012
Misc
Partial Correction
09/06/2012
OK TO ONE-SIDE TOP-OUT WALL GWB DOWN TO 10' A.F.F. AT: CORRIDORS 2E143 & E45; ALL WALLS NORTH FROM E-W PLANE OF 2E135 N WALL;
In-wall Inspection Partial 9/6/2012 at 12:00 AM 09/06/2012
Misc
Partial Correction
09/06/2012
OK TO HANG GWB ONE SIDE EXTERIOR FACE OF WALLS SURROUNDING TOILET 2E210;
In-wall Inspection Partial 9/6/2012 at 12:00 AM 09/06/2012
Misc
Partial Correction
09/06/2012
OK TO HANG GWB ONE SIDE EXTERIOR FACE OF WALLS SURROUNDING TOILET 2E232;
In-wall Inspection Partial 9/12/2012 9/12/2012 at 12:00 AM 09/12/2012
Misc
Partial Correction
09/06/2012
OK TO HANG GWB ONE SIDE EXTERIOR FACE OF WALLS SURROUNDING TOILET 2E232;
Misc
Partial Correction
09/12/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65 EXCLUDING EXTERIOR WALLS;
Rough Framing Inspection - Commercial Passed 9/13/2012 at 12:00 AM 09/13/2012
Misc
Resolved
09/13/2012
OK TO ONE-SIDE TOP-OUT WALL GWB DOWN TO 10' A.F.F. THROUGHOUT.
In-wall Inspection Partial 9/26/2012 9/26/2012 at 12:00 AM 09/26/2012
Misc
Resolved
09/26/2012
OK TO HANG GWB ONE SIDE EXTERIOR FACE OF WALLS SURROUNDING TOILET 2E232;
Misc
Partial Correction
09/12/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65; 134; 137; 143;
In-wall Inspection Partial 9/28/2012 at 12:00 AM 09/28/2012
Misc
Partial Correction
09/26/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65; 134; 137; 143; 92; 94;
In-wall Inspection Partial 10/15/2012 at 12:00 AM 10/15/2012
Misc
Partial Correction
09/28/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65; 134; 137; 143; 92; 93; 94
Above Ceiling Inspection Partial 10/22/2012 10/22/2012 at 12:00 AM 10/22/2012
Misc
Partial Correction
10/22/2012
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS EXCEPT @ BREAKTHROUGHS TO EXISTING BUILDING
In-wall Inspection Partial 11/2/2012 11/2/2012 at 12:00 AM 11/02/2012
Misc
Partial Correction
10/15/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65; 134; 137; 143; 92; 93; 94; 129; 130; 131; 132; 03B BOTH FACES;
Miscellaneous Inspection Passed 11/26/2012 at 12:00 AM 11/26/2012
Alarm Test Passed 11/20/2012 at 12:00 AM 11/26/2012
Occupancy Inspection - Codes Commercial Temporary C of O 11/27/2012 11/27/2012 at 12:00 AM 11/27/2012
Misc
Corrective Action Required
11/27/2012
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
11/27/2012
NEC 370-20; IRC E3806.5-6 SET-BACK OF ELECTRICAL RECEPTACLE / SWITCH BOXES: 1/4" MAXIMUM SET-BACK @ NON-COMBUSTIBLE SURFACES -- SEE AT HARD TILE WALLS IN RESTROOMS.
Occupancy Inspection - Fire Temporary C of O 11/27/2012 at 12:00 AM 11/27/2012
Misc
Corrective Action Required
11/27/2012
-extend sprinkler coverage into the transitional areas: Exam 2E131, 2E64 -addressing off the corridors
Occupancy Inspection - Codes Commercial Temporary C of O 12/6/2012 at 12:00 AM 12/06/2012
Misc
Corrective Action Required
11/27/2012
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
11/27/2012
NEC 370-20; IRC E3806.5-6 SET-BACK OF ELECTRICAL RECEPTACLE / SWITCH BOXES: 1/4" MAXIMUM SET-BACK @ NON-COMBUSTIBLE SURFACES -- SEE AT HARD TILE WALLS IN RESTROOMS.
In-wall Inspection Partial 12/14/2012 12/14/2012 at 12:00 AM 12/14/2012
Misc
Partial Correction
11/02/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65; 134; 137; 143; 92; 93; 94; 129; 130; 131; 132; 03B BOTH FACES; 087; 089; 097; 098; 127; 133;
Occupancy Inspection - Codes Commercial Temporary C of O 12/14/2012 at 12:00 AM 12/14/2012
Misc
Partial Correction
12/14/2012
OK FOR TEMPORARY OCCUPANCY AT FOLLOWING AREA(S): PHASE 1 WITHIN AREA "B";
Misc
Resolved
12/14/2012
NEC 370-20; IRC E3806.5-6 SET-BACK OF ELECTRICAL RECEPTACLE / SWITCH BOXES: 1/4" MAXIMUM SET-BACK @ NON-COMBUSTIBLE SURFACES -- SEE AT HARD TILE WALLS IN RESTROOMS.
In-wall Inspection Partial 12/19/2012 12/19/2012 at 12:00 AM 12/19/2012
Misc
Partial Correction
12/14/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E155; 154; 153; 151; 150; 152; 146; 45; 149; 147; 140; 138; 136; 135; 139; 141; 144; 65; 134; 137; 143; 92; 93; 94; 129; 130; 131; 132; 03B BOTH FACES; 087; 089; 097; 098; 127; 133; 95 SOUTH WALL;
Above Ceiling Inspection Partial 12/31/2012 12/31/2012 at 12:00 AM 12/31/2012
Misc
Partial Correction
10/22/2012
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AT LOCATIONS: 2E087; 89; 92; 93; 94; 95; 97; 98; 127; 128; 129; 130; 131; 132; 133;
Sprinkler - Hydrostatic Test Passed 5/24/2012 at 12:00 AM 01/04/2013
Sprinkler - Flow Test Passed 6/15/2012 at 12:00 AM 01/04/2013
Alarm Test Passed 1/4/2013 at 12:00 AM 01/04/2013
Occupancy Inspection - Codes Commercial Temporary C of O 1/7/2013 1/7/2013 at 12:00 AM 01/07/2013
Misc
Partial Correction
12/14/2012
OK FOR OCCUPANCY AT FOLLOWING AREA(S): PHASE 1 WITHIN AREA "B"; PHASE 2D;
Occupancy Inspection - Fire Temporary C of O 1/7/2013 at 12:00 AM 01/07/2013
Misc
Corrective Action Required
01/04/2013
-extend sprinkler coverage into the transitional areas: Exam 2E131, 2E64 -addressing off the corridors
In-wall Inspection Partial 1/9/2013 1/9/2013 at 12:00 AM 01/09/2013
Misc
Partial Correction
12/19/2012
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; [038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123;
Occupancy Inspection - Codes Commercial Failed 1/11/2013 1/11/2013 at 12:00 AM 01/11/2013
Misc
Partial Correction
01/07/2013
OK FOR OCCUPANCY AT FOLLOWING AREA(S): PHASE 1 WITHIN AREA "B"; PHASE 2D;
Misc
Corrective Action Required
01/11/2013
OCCUPANCY OF AREA 2B SUBJECT TO FIRE DEPARTMENT RE-INSPECTION. NO REMAINING CODES ADMINISTRATION ISSUES.
Occupancy Inspection - Fire Temporary C of O 1/11/2013 at 12:00 AM 01/14/2013
Misc
Corrective Action Required
01/07/2013
-extend sprinkler coverage into the transitional areas: Exam 2E131, 2E64 -addressing off the corridors
Misc
Corrective Action Required
01/14/2013
PHASE 2B -cast room 2E128 needs sprinkler head eschution installed -secure all ceiling tile throughout rennovation area - remove all construction materials, tools and debris from rooms and corridors - label appropriate doors from corridor with the proper numerics/addressing
In-wall Inspection Partial 1/15/2013 (8:00 to 5:00) 1/15/2013 at 12:00 AM 01/15/2013
Misc
Partial Correction
01/09/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; [038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; [109; PHASE 2F;
In-wall Inspection Partial 1/25/2013 1/25/2013 at 12:00 AM 01/25/2013
Misc
Partial Correction
01/15/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; [038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; 109; PHASE 2F; [PHASE 2A 2E101 W WALL, 103, 104, 105, 124, 125, 126;
In-wall Inspection Partial 1/28/2013 1/28/2013 at 12:00 AM 01/28/2013
Misc
Partial Correction
01/25/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; 038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; 109; PHASE 2F; PHASE 2A 2E101 W WALL, 103, 104, 105, 124, 125, 126; [106; 107;
Above Ceiling Inspection Partial 1/28/2013 at 12:00 AM 01/28/2013
Misc
Partial Correction
12/31/2012
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AT LOCATIONS: 2E087; 89; 92; 93; 94; 95; 97; 98; 127; 128; 129; 130; 131; 132; 133; [PHASE 2E WAITING ROOM EXPANSION
In-wall Inspection Partial 1/29/2013 (8:00 to 5:00) 1/29/2013 at 12:00 AM 01/29/2013
Misc
Partial Correction
01/28/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; 038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; 109; PHASE 2F; PHASE 2A 2E101 W WALL, 103, 104, 105, 124, 125, 126; 106; 107; PHASE 2G NW CORNER;
Occupancy Inspection - Codes Commercial Partial 1/30/2013 1/30/2013 at 12:00 AM 01/30/2013
Misc
Partial Correction
01/11/2013
OK FOR OCCUPANCY AT FOLLOWING AREA: PHASE 1 WITHIN AREA "B"; PHASE 2D; PHASE 2B; PHASE 2E;
Misc
Corrective Action Required
01/11/2013
OCCUPANCY OF AREA 2B SUBJECT TO FIRE DEPARTMENT RE-INSPECTION. NO REMAINING CODES ADMINISTRATION ISSUES.
In-wall Inspection Partial 1/30/2013 at 12:00 AM 01/30/2013
Misc
Partial Correction
01/29/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; 038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; 109; PHASE 2F; PHASE 2A 2E101 W WALL, 103, 104, 105, 124, 125, 126; 106; 107; PHASE 2G NW CORNER; 060; 062; 064;
Occupancy Inspection - Fire Passed 02/01/2013
Misc
Corrective Action Required
01/14/2013
-extend sprinkler coverage into the transitional areas: Exam 2E131, 2E64 -addressing off the corridors
Misc
Corrective Action Required
01/14/2013
PHASE 2B -cast room 2E128 needs sprinkler head eschution installed -secure all ceiling tile throughout rennovation area - remove all construction materials, tools and debris from rooms and corridors - label appropriate doors from corridor with the proper numerics/addressing
Above Ceiling Inspection Partial 2/6/2013 2/6/2013 at 12:00 AM 02/06/2013
Misc
Partial Correction
01/28/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AT LOCATIONS: 2E087; 89; 92; 93; 94; 95; 97; 98; 127; 128; 129; 130; 131; 132; 133; PHASE 2E WAITING ROOM EXPANSION; PHASE 2A EXCEPT BORDERS ONLY AT 101, 103, 106, 120 {SEE NOTES BY DON}; PHASE 2C AFTER TWO ISSUES AT ONE ELECT J.B. ARE CORRECTED;
Above Ceiling Inspection Partial 2/8/2013 2/8/2013 at 12:00 AM 02/08/2013
Misc
Partial Correction
02/06/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AT LOCATIONS: 2E087; 89; 92; 93; 94; 95; 97; 98; 127; 128; 129; 130; 131; 132; 133; PHASE 2E WAITING ROOM EXPANSION; PHASE 2A; PHASE 2C;
In-wall Inspection Partial 2/13/2013 2/13/2013 at 12:00 AM 02/13/2013
Misc
Partial Correction
01/30/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; 038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; 109; PHASE 2F; PHASE 2A 2E101 W WALL, 103, 104, 105, 124, 125, 126; 106; 107; PHASE 2G NW CORNER; 060; 062; 064; SHORT WALL @ NURSE STATION 106; PHASE 2H
Above Ceiling Inspection Passed 2/14/2013 at 12:00 AM 02/14/2013
Misc
Resolved
02/14/2013
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS AT LOCATIONS: 2E087; 89; 92; 93; 94; 95; 97; 98; 127; 128; 129; 130; 131; 132; 133; PHASE 2E WAITING ROOM EXPANSION; PHASE 2A; PHASE 2C;
In-wall Inspection Passed 2/14/2013 at 12:00 AM 02/14/2013
Misc
Resolved
02/14/2013
OK TO COVER WALL FRAMING AND IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E03B BOTH FACES; 2E045; 065; 087; 089; 092; 093; 094; 095; 097; 098 SOUTH WALL; 127; 129; 130; 131; 132; 133; 134; 135; 136; 137; 138; 139; 140; 141; 143; 144; 146; 147; 149; 150; 151; 152; 153; 154; 155; 038 NEW KNEE WALL; 099; 100; 115; 117; 118; 119; 120; 121; SOUTH SIDE 122; 123; 109; PHASE 2F; PHASE 2A 2E101 W WALL, 103, 104, 105, 124, 125, 126; 106; 107; PHASE 2G NW CORNER; 060; 062; 064; SHORT WALL @ NURSE STATION 106; PHASE 2H
Alarm Test Passed 2/15/2013 at 12:00 AM 02/19/2013
Occupancy Inspection - Fire Passed 2/19/2013 at 12:00 AM 02/19/2013
Occupancy Inspection - Codes Commercial Partial 2/19/2013 2/19/2013 at 12:00 AM 02/19/2013
Misc
Partial Correction
01/30/2013
OK FOR OCCUPANCY AT FOLLOWING AREA: PHASE 1 WITHIN AREA "B"; PHASE 2D; PHASE 2B; PHASE 2E; PHASE 2C;
Misc
Resolved
02/19/2013
OCCUPANCY OF AREA 2B SUBJECT TO FIRE DEPARTMENT RE-INSPECTION. NO REMAINING CODES ADMINISTRATION ISSUES.
Alarm Test Passed 2/28/2013 at 12:00 AM 02/28/2013
Occupancy Inspection - Codes Commercial Temporary C of O 2/26/2013 2/28/2013 at 12:00 AM 02/28/2013
Misc
Resolved
02/28/2013
OK FOR OCCUPANCY AT FOLLOWING AREA: PHASE 1 WITHIN AREA "B"; PHASE 2D; PHASE 2B; PHASE 2E; PHASE 2C; PHASE 2A; RECEPTION AREA PHASES F, G, H
Occupancy Inspection - Fire Temporary C of O 2/28/2013 at 12:00 AM 02/28/2013
Misc
Corrective Action Required
02/28/2013
Phase-2A PRCOM20121479 provide sprinkler coverage for elec. closet 2E105 install ceiling in the closet cover the open j-box above the elec. closet ceiling
Occupancy Inspection - Codes Commercial Partial 3/7/2013 3/6/2013 at 12:00 AM 03/06/2013
Misc
Partial Correction
03/06/2013
OK FOR OCCUPANCY AT FOLLOWING AREA: PHASE 1 WITHIN AREA "B"; PHASE 2D; PHASE 2B; PHASE 2E; PHASE 2C; PHASE 2A; RECEPTION AREA PHASES F, G, H
Misc
Corrective Action Required
03/06/2013
GRAB BAR TO BE INSTALLED IN EXISTING RESTROOM
Misc
Corrective Action Required
03/06/2013
FIRE DEPT REQUIRES SPRINKLER HEAD ABOVE ELECTRICAL CLOSET.
Occupancy Inspection - Codes Commercial Full C of O 3/7/2013 at 12:00 AM 03/07/2013
Misc
Resolved
03/07/2013
OK FOR OCCUPANCY AT FOLLOWING AREA: PHASE 1 WITHIN AREA "B"; PHASE 2D; PHASE 2B; PHASE 2E; PHASE 2C; PHASE 2A; RECEPTION AREA PHASES F, G, H
Misc
Resolved
03/07/2013
GRAB BAR TO BE INSTALLED IN EXISTING RESTROOM
Misc
Resolved
03/07/2013
FIRE DEPT REQUIRES SPRINKLER HEAD ABOVE ELECTRICAL CLOSET.
Occupancy Inspection - Fire Passed 3/7/2013 at 12:00 AM 03/07/2013
Misc
Corrective Action Required
02/28/2013
Phase-2A PRCOM20121479 provide sprinkler coverage for elec. closet 2E105 install ceiling in the closet cover the open j-box above the elec. closet ceiling
Documents & Images
Date Uploaded File Type Document Name
07/16/2012 Letter Plan Review Conditions
08/16/2012 Letter Building Permit
08/16/2012 Letter Plan Review Conditions
08/30/2012 Letter Inspection Summary
09/06/2012 Letter Inspection Summary
09/12/2012 Letter Inspection Summary
09/12/2012 Letter Inspection Summary
09/12/2012 Letter Inspection Summary
09/13/2012 Letter Inspection Summary
09/26/2012 Letter Inspection Summary
09/28/2012 Letter Inspection Summary
10/15/2012 Letter Inspection Summary
10/22/2012 Letter Inspection Summary
11/02/2012 Letter Inspection Summary
11/27/2012 Letter Temporary Certificate of Occupancy
12/14/2012 Letter Temporary Certificate of Occupancy
12/19/2012 Letter Inspection Summary
12/31/2012 Letter Inspection Summary
01/07/2013 Letter Temporary Certificate of Occupancy
01/09/2013 Letter Inspection Summary
01/11/2013 Letter Inspection Summary
01/15/2013 Letter Inspection Summary
01/25/2013 Letter Inspection Summary
01/28/2013 Letter Inspection Summary
01/28/2013 Letter Inspection Summary
01/29/2013 Letter Inspection Summary
01/30/2013 Letter Inspection Summary
02/06/2013 Letter Inspection Summary
02/08/2013 Letter Inspection Summary
02/13/2013 Letter Inspection Summary
02/19/2013 Letter Inspection Summary
02/28/2013 Letter Temporary Certificate of Occupancy
02/28/2013 Letter Fire Loss Reduction Form
03/07/2013 Letter Field Certificate of Occupancy
03/08/2013 Letter Final Certificate of Occupancy
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/26/2013 Letter Fire Loss Reduction Form
06/26/2013 Letter Fire Loss Reduction Form
06/27/2013 Letter Fire Building Plan Review
06/27/2013 Letter Fire Building Plan Review
08/28/2013 Letter Temporary Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home