Permit Application Status

PRCOM20120186


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20120186
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
CARDIAC REHAB REMODEL
02/06/2012
02/17/2012
10/04/2014
06/05/2012
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/16/2012 02/16/2012
Mike Weisenborn
True
Building Plan Review Approved 02/16/2012 02/15/2012
Mike Weisenborn
License Tax Codes Approved 02/16/2012 02/15/2012
Mike Weisenborn
Fire Plan Review Approved 02/16/2012 02/14/2012
Jim Eden
Installation acceptance testing
Corrective Action Required
02/14/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test of the relocated alarm appliances.
Sprinkler Plan Review Released for Construction 02/14/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
02/14/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
02/14/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Visual inspection to be completed at occupancy inspection.
Misc
Corrective Action Required
02/14/2012

Confirm sprinkler coverage in newly constructed closet D132A. Verified at inspection.
Sprinkler Plan Review Released for Construction 02/14/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
02/14/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
02/14/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be made at the scheduled occupancy inspection.
Zoning Review Approved 02/16/2012 02/07/2012
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $725.78 $725.78 Paid 02/17/2012
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 3/7/2012 at 12:00 AM 03/07/2012
Misc
Corrective Action Required
03/07/2012
IN-WALL OK TO COVER BELOW: -PFT RM
Final Inspection - Commercial Partial 3/28/2012 3/28/2012 at 12:00 AM 03/28/2012
Misc
Partial Correction
03/16/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131;
Final Inspection - Commercial Partial 4/9/2012 at 12:00 AM 04/09/2012
Misc
Partial Correction
03/28/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131; PHASE 2-B;
Occupancy Inspection - Fire Temporary C of O 4/9/2012 at 12:00 AM 04/09/2012
Final Inspection - Commercial Partial 4/9/2012 at 12:00 AM 04/09/2012
Misc
Partial Correction
04/09/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131; 133 aka PHASE 2-B;
In-wall Inspection Partial 4/18/2012 at 12:00 AM 04/18/2012
Misc
Partial Correction
04/18/2012
IN-WALL OK TO COVER BELOW: PFT RM; BOTH FACES OF WALLS SEPERATING NEW RECEPTION AREA AND D148;
Above Ceiling Inspection Partial 4/30/2012 (8:00 to 5:00) 4/30/2012 at 12:00 AM 04/30/2012
Misc
Partial Correction
04/30/2012
OK TO COVER WHEN READY ACT CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT NEW RECEPTION AREA @ SE CORNER OF GYM;
In-wall Inspection Partial 5/3/2012 (8:00 to 5:00) 5/3/2012 at 12:00 AM 05/03/2012
Misc
Partial Correction
04/18/2012
IN-WALL OK TO COVER BELOW: PFT RM; BOTH FACES OF WALLS SEPARATING NEW RECEPTION AREA AND D148; 125; 126; 127; 128A; 128B; 129; 132A;
Final Inspection - Commercial Partial 5/10/2012 5/9/2012 at 12:00 AM 05/09/2012
Misc
Partial Correction
04/09/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131; 133(PHASE 2-B); D122;
Alarm Test Partial 5/10/2012 at 12:00 AM 05/10/2012
Occupancy Inspection - Fire Temporary C of O 5/10/2012 at 12:00 AM 05/10/2012
Final Inspection - Commercial Partial 5/14/2012 at 12:00 AM 05/14/2012
Misc
Partial Correction
05/09/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131; 133 aka PHASE 2-B;
Above Ceiling Inspection Partial 5/18/2012 at 12:00 AM 05/18/2012
Misc
Partial Correction
04/30/2012
OK TO COVER WHEN READY ACT CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT: RECEPTION AREA @ SE CORNER OF GYM; PHASE 5 SPACES D125, 126, 127, 128A, 128B, 129, 132, 132A;
Alarm Test Passed 6/5/2012 at 7:00 AM 06/05/2012
Occupancy Inspection - Fire Passed 6/5/2012 at 12:00 AM 06/05/2012
Final Inspection - Commercial Failed 6/5/2012 6/5/2012 at 12:00 AM 06/05/2012
Misc
Partial Correction
05/14/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131; 133 aka PHASE 2-B;
Misc
Corrective Action Required
06/05/2012
SEVERAL ELECT RECEPTS NOT HOT FOR TEST
Misc
Corrective Action Required
06/05/2012
NEC 408.4: LABELING OF ELECTRICAL CIRCUIT POSITIONS AT PANEL(S): EACH BREAKER POSITION MUST BE LABELED. MUST BE LEGIBLE; SPECIFIC. IF PANEL SCHEDULE IS USED NUMBER POSITIONS ON PANEL FRONT PER SCHEDULE. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE"
Final Inspection - Commercial Passed 6/5/2012 at 12:00 AM 06/05/2012
Misc
Resolved
06/05/2012
FOLLOWING SPACES OK FOR USE & OCCUPANCY: C121; D131; 133 aka PHASE 2-B;
Misc
Resolved
06/05/2012
SEVERAL ELECT RECEPTS NOT HOT FOR TEST
Misc
Resolved
06/05/2012
NEC 408.4: LABELING OF ELECTRICAL CIRCUIT POSITIONS AT PANEL(S): EACH BREAKER POSITION MUST BE LABELED. MUST BE LEGIBLE; SPECIFIC. IF PANEL SCHEDULE IS USED NUMBER POSITIONS ON PANEL FRONT PER SCHEDULE. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE"
Above Ceiling Inspection Passed 6/5/2012 at 12:00 AM 06/05/2012
Misc
Resolved
06/05/2012
OK TO COVER WHEN READY ACT CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT: RECEPTION AREA @ SE CORNER OF GYM; PHASE 5 SPACES D125, 126, 127, 128A, 128B, 129, 132, 132A;
In-wall Inspection Passed 6/5/2012 at 12:00 AM 06/05/2012
Misc
Resolved
06/05/2012
IN-WALL OK TO COVER BELOW: PFT RM; BOTH FACES OF WALLS SEPARATING NEW RECEPTION AREA AND D148; 125; 126; 127; 128A; 128B; 129; 132A;
In-wall Inspection Passed 4/18/2012 at 12:00 AM 08/28/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Corrective Action Required
04/18/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Resolved
06/05/2012
Documents & Images
Date Uploaded File Type Document Name
02/14/2012 Letter Fire (Sprinkler) Plan Review
02/14/2012 Letter Fire (Sprinkler) Plan Review
02/17/2012 Letter Building Permit
02/17/2012 Letter Plan Review Conditions
03/07/2012 Letter Inspection Summary
03/16/2012 Letter Inspection Summary
03/28/2012 Letter Inspection Summary
03/28/2012 Letter Fire Loss Reduction Form
04/09/2012 Letter Inspection Summary
04/18/2012 Letter Inspection Summary
04/30/2012 Letter Inspection Summary
05/03/2012 Letter Inspection Summary
05/09/2012 Letter Inspection Summary
05/10/2012 Letter Fire Loss Reduction Form
05/18/2012 Letter Inspection Summary
06/05/2012 Letter Fire Loss Reduction Form
06/05/2012 Letter Inspection Summary
06/05/2012 Letter Inspection Summary
06/25/2013 Letter Fire Building Plan Review
06/27/2013 Letter Fire (Sprinkler) Plan Review
06/27/2013 Letter Fire (Sprinkler) Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home