Permit Application Status

PRCOM20110083


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20110083
Building Permit - Commercial
Certificate of Occupancy
MO CVS PHARMACY LLC
NEW COMMERCIAL
CVS Pharmacy Building
01/25/2011
03/26/2012
10/06/2014
09/25/2012
Locations
Contacts
CEDARWOOD DEVELOPMENT, Address:1765 MERRIMAN RD  
PROFESSIONAL SERVICE INDUSTRIES INC, Address:1211 W CAMBRIDGE CIR, Phone:(913) 310-1600  
Land Plan Engineering, Address:1600 Genessee St, Suite 400  
TRI-C CONSTRUCTION COMPANY, Address:1765 MERRIMAN RD, Phone:(330) 836-2254  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
A & A ELECTRICAL INC, Address:705 SQUIRE CT, Phone:(816) 847-1902  
RELIABLE MECHANICAL SERVICES, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
MO CVS PHARMACY LLC, Address:1 CVS DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 02/08/2011 05/02/2012
Jim Eden
Construction documents for fire alarm systems
Carried Forward
05/02/2012

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Misc
Resolved
05/02/2012

Provide interior notification appliances throughout the building per 2002 NFPA 72 and amended IFC Section 903.4.2. Re-submit plans. 5/2/2012- Plans resubmitted with interior notification appliances provided.
Installation acceptance testing
Corrective Action Required
05/02/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule an alarm test coordinated with the sprinkler contractor.
Misc
Corrective Action Required
05/02/2012

Duct detection shall be supervisory only without activation of interior horn/strobes. Verified at inspection.
Misc
Corrective Action Required
05/02/2012

The exterior horn/strobe shall activate for sprinkler waterflow only. Verified at inspection.
Sprinkler Plan Review Released for Construction 04/19/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
04/19/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received 4/14/2012.
Misc
Corrective Action Required
04/19/2012

Confirm coverage of the VRC from the mezzanine. Verified at inspection.
Misc
Corrective Action Required
04/19/2012

The FDC shall be a 4inch Storz type connection.
Installation acceptance testing
Corrective Action Required
04/19/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow testing.
Misc
Corrective Action Required
04/19/2012

Systems shall be designed to the 2006 IBC and 2002 NFPA 13. For information only.
Misc
Corrective Action Required
04/19/2012

The Flow Test data for the site was taken from over a 1/2 mile away. Confirm flow data for the site and make changes as needed. Provide documentation of second test.
Alarm Plan Review Rejected 04/17/2012
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
04/17/2012

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Misc
Resolved
05/02/2012

Provide interior notification appliances throughout the building per 2002 NFPA 72 and amended IFC Section 903.4.2. Re-submit plans.
Internal Plan Review (Res) Approved 03/23/2012 03/20/2012
Mike Weisenborn
True
Special Inspections Review Approved 03/23/2012 03/20/2012
Mike Weisenborn
Final Development Plan Review Approved 03/05/2012 03/06/2012
Mike Weisenborn
Building Plan Review Approved 02/08/2011 02/09/2012
Mike Weisenborn
Bldg - Special inspections - Report requirement
Corrective Action Required
02/09/2012

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
02/09/2012

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide statement of special inspections.
Need special inspections statement letter and FDP approval prior to approving the Internal Plan Review.
Fire Plan Review Approved 02/08/2011 02/07/2012
Jim Eden
Building Plan Review Approved 02/04/2011 03/23/2011
Mike Weisenborn
Misc
Corrective Action Required
02/04/2011

Civil plans for this project were not include in the building permit submittal. Action required - Provide 3 sets of the civil package for review.
Stairway - Headroom
Corrective Action Required
02/04/2011

Stairways shall have a minimum headroom clearance of 80 inches measured vertically from a line connecting the edge of the nosing. Such headroom shall be continuous above the stairway to the point where the line intersects the landing below, one tread depth beyond the bottom riser. The minimum clearance shall be maintained the full width of the stairway and landing. Action required - Detail 2 on Sheet A-1.3 shows the clearance measured fro the tread of the stair which is incorrect. Make needed corrections.
Bldg - Special inspections - Report requirement
Corrective Action Required
02/04/2011

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Bldg - Special inspections - Statement of special inspections
Resolved
03/23/2011

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide statement of special inspections. Received letter from PSI
Fire Plan Review Approved 02/25/2011 02/25/2011
Jim Eden
Address numbers required
Resolved
02/25/2011

2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
02/17/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required: Provide shop drawings for review and approval.
Construction documents for fire alarm systems
Corrective Action Required
02/17/2011

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required: Provide shop drawings for review and approval.
Knox box required
Resolved
02/25/2011

2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required: The Knox Box shall be located 6'AFF over the fire department connection (FDC). RElocate from the front door. An application may be obtained from the Fire Department.
Installation acceptance testing
Corrective Action Required
02/17/2011

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required: Call 9816) 969-1300 to schedule testing. All testing shall be completed prior to scheduling an occupancy inspection.
Misc
Resolved
02/25/2011

304.3.3 Capacity exceeding 1.5 cubic yards. Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Exceptions: 1. Dumpsters or containers in areas protected by an approved automatic sprinkler system installed throughout in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Storage in a structure shall not be prohibited where the structure is of Type I or IIA construction, located not less than 10 feet (3048 mm) from other buildings and used exclusively for dumpster or container storage. Action required: Relocate bollards accordingly.
Misc
Resolved
02/25/2011

The fire department connection (FDC) shall be located within 100 feet of a fire hydrant and shall be a 4" Storz type connection. Action required: Provide Civil drawings showing the location of the hydrant and mains.
Misc
Carried Forward
02/25/2011

2006 IFC 1011.1 Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in a corridor is more than 100 feet (30 480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. Action required: If sinage is not immediately visible from most ares of the store, provide intermediate exit signage in the main interior pathway. Verified at inspection.
Building Plan Review Rejected 02/25/2011 02/25/2011
Mike Weisenborn
Misc
Resolved
02/25/2011

Civil plans for this project were not include in the building permit submittal. Action required - Provide 3 sets of the civil package for review.
Stairway - Headroom
Resolved
02/25/2011

Stairways shall have a minimum headroom clearance of 80 inches measured vertically from a line connecting the edge of the nosing. Such headroom shall be continuous above the stairway to the point where the line intersects the landing below, one tread depth beyond the bottom riser. The minimum clearance shall be maintained the full width of the stairway and landing. Action required - Detail 2 on Sheet A-1.3 shows the clearance measured fro the tread of the stair which is incorrect. Make needed corrections. Corrections have been made
Bldg - Special inspections - Report requirement
Corrective Action Required
02/17/2011

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
02/17/2011

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide statement of special inspections.
Need special inspections statement letter and FDP approval prior to approving the Internal Plan Review.
Internal Plan Review (Res) Rejected 02/04/2011 02/09/2011
Mike Weisenborn
Fire Plan Review Rejected 02/04/2011 02/09/2011
Jim Eden
Address numbers required
Corrective Action Required
02/08/2011

2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
02/08/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required: Provide shop drawings for review and approval.
Construction documents for fire alarm systems
Corrective Action Required
02/08/2011

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required: Provide shop drawings for review and approval.
Knox box required
Corrective Action Required
02/08/2011

2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required: The Knox Box shall be located 6'AFF over the fire department connection (FDC). RElocate from the front door. An application may be obtained from the Fire Department.
Installation acceptance testing
Corrective Action Required
02/08/2011

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required: Call 9816) 969-1300 to schedule testing. All testing shall be completed prior to scheduling an occupancy inspection.
Misc
Corrective Action Required
02/08/2011

304.3.3 Capacity exceeding 1.5 cubic yards. Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Exceptions: 1. Dumpsters or containers in areas protected by an approved automatic sprinkler system installed throughout in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Storage in a structure shall not be prohibited where the structure is of Type I or IIA construction, located not less than 10 feet (3048 mm) from other buildings and used exclusively for dumpster or container storage. Action required: Relocate bollards accordingly.
Misc
Corrective Action Required
02/08/2011

The fire department connection (FDC) shall be located within 100 feet of a fire hydrant and shall be a 4" Storz type connection. Action required: Provide Civil drawings showing the location of the hydrant and mains.
Misc
Corrective Action Required
02/09/2011

2006 IFC 1011.1 Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in a corridor is more than 100 feet (30 480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. Action required: If sinage is not immediately visible from most ares of the store, provide intermediate exit signage in the main interior pathway. Verified at inspection.
License Tax Codes Approved 02/04/2011 01/31/2011
Mike Weisenborn
Historical Preservation Review Approved 02/04/2011 01/31/2011
Mike Weisenborn
Misc
Corrective Action Required
05/02/2012

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $5,499.33 $5,499.33 Paid 03/26/2012
9110073-Right of Way Permit Fee $60.00 $60.00 Paid 03/26/2012
8331507-Sewer Connection Fee $30.00 $30.00 Paid 03/26/2012
8350015-Water Meter Fee $1,500.05 $1,500.05 Paid 03/26/2012
8331401-Water Tap Fee $10,180.00 $10,180.00 Paid 03/07/2012
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 4/4/2012 at 12:00 AM 04/04/2012
Misc
Partial Correction
04/04/2012
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS DESCRIBED BELOW: 1/A.8 TO 1/E.7; A 1-5; 5/ A-E
Footing Inspection - Commercial Partial 4/5/2012 (2:00) 4/5/2012 at 12:00 AM 04/05/2012
Misc
Corrective Action Required
04/05/2012
A 1-5; 5/ A-E
Footing Inspection - Commercial Partial 4/6/2012 (2:00) 4/6/2012 at 12:00 AM 04/06/2012
Misc
Partial Correction
04/06/2012
SUBJECT TO PSI APPROVAL, OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS DESCRIBED BELOW: 1/A.8 TO 1/E.7; A 1-5; 5/ A-E; 1/F TO 5/F TO 5/D.5 TO COMPLETE PERIMETER
Misc
Partial Correction
04/06/2012
SUBJECT TO PSI APPROVAL, OK TO POUR WHEN READY ISOLATED FOOTINGS AT: 3/B; 3/C; 3/D; 3/E; B/2; B/3.8; TWO MARK FT5 FOR CANOPY AT PRESCRIPTION DRIVE-THROUGH
Underslab Plumbing Inspection - Commercial Partial 4/10/2012 4/10/2012 at 12:00 AM 04/10/2012
Misc
Partial Correction
04/10/2012
OK TO COVER WHEN READY PVC DWV UNDER-SLAB PLUMBING PIPING: BUILDING DRAIN LINE + BRANCH LINE TO N END OF BLDG, EXCEPT CONCRETE ENCASEMENT AT F.C.O.'s YET TO BE POURED AND APPROVED;
Underslab Electrical Inspection - Commercial Not Ready 4/11/2012 4/11/2012 at 12:00 AM 04/11/2012
Misc
Corrective Action Required
04/11/2012
UNDER-SLAB CONDUIT NOT READY FOR INSPECTION
Underslab Plumbing Inspection - Commercial Not Ready 4/11/2012 4/11/2012 at 12:00 AM 04/11/2012
Misc
Partial Correction
04/10/2012
OK TO COVER WHEN READY PVC DWV UNDER-SLAB PLUMBING PIPING: BUILDING DRAIN LINE + BRANCH LINE TO N END OF BLDG, EXCEPT CONCRETE ENCASEMENT AT F.C.O.'s YET TO BE POURED AND APPROVED;
Misc
Corrective Action Required
04/11/2012
4/11/2012: PLUMBING PIPING NOT READY FOR INSPECTION
Underslab Plumbing Inspection - Commercial Passed 4/12/2012 4/12/2012 at 12:00 AM 04/12/2012
Misc
Resolved
04/12/2012
OK TO COVER WHEN READY PVC DWV UNDER-SLAB PLUMBING PIPING: BUILDING DRAIN LINE + BRANCH LINE TO N END OF BLDG, EXCEPT CONCRETE ENCASEMENT AT F.C.O.'s YET TO BE POURED AND APPROVED;
Misc
Resolved
04/12/2012
4/11/2012: PLUMBING PIPING NOT READY FOR INSPECTION
Underground Electrical Inspection - Commercial Passed 4/12/2012 at 12:00 AM 04/12/2012
Underslab Electrical Inspection - Commercial Passed 4/12/2012 4/12/2012 at 12:00 AM 04/12/2012
Misc
Resolved
04/12/2012
UNDER-SLAB CONDUIT NOT READY FOR INSPECTION
Sewer Service Inspection Passed 4/19/2012 (1:00) 4/19/2012 at 12:00 AM 04/19/2012
Water Service Inspection Passed 4/25/2012 (2:00) 4/25/2012 at 12:00 AM 04/25/2012
Miscellaneous Inspection Not Ready 5/14/2012 at 12:00 AM 05/14/2012
Misc
Corrective Action Required
05/14/2012
STOPPED TO MEET NEW SUPT. & DISCUSS WORK COVERED WITHOUT INSPECTION. SUPT. NOT ON SITE.
Underground Electrical Inspection - Residential Partial 5/15/2012 at 12:00 AM 05/15/2012
Misc
Partial Correction
05/15/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Underground Electrical Inspection - Residential Partial 5/16/2012 at 12:00 AM 05/16/2012
Misc
Partial Correction
05/15/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Misc
Partial Correction
05/16/2012
BURIED CONDUIT FOR SITE LIGHTING AND DATACOM COVERED WITHOUT INSPECTION EXPOSED AT <= 15' INTERVALS TO VERIFY SIZE AND DEPTH. NO ISSUES FOUND.
Piers/Caissons Inspection - Commercial Partial 5/17/2012 at 12:00 AM 05/17/2012
Misc
Partial Correction
05/17/2012
OK TO PLACE WHEN READY TWO CONCRETE COLUMN PILASTERS PER DETAIL 7/S-3.1
Miscellaneous Inspection Partial 5/18/2012 at 12:00 AM 05/18/2012
Misc
Corrective Action Required
05/14/2012
MONITORING CORRECTION OF COMPLAINT ON "OVERGROWN GRASS"
Footing Inspection - Commercial Partial 5/21/2012 (10:00) 5/22/2012 at 12:00 AM 05/22/2012
Misc
Partial Correction
04/06/2012
SUBJECT TO PSI APPROVAL, OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS DESCRIBED BELOW: 1/A.8 TO 1/E.7; A 1-5; 5/ A-E; 1/F TO 5/F TO 5/D.5 TO COMPLETE PERIMETER
Misc
Partial Correction
04/06/2012
SUBJECT TO PSI APPROVAL, OK TO POUR WHEN READY ISOLATED FOOTINGS AT: 3/B; 3/C; 3/D; 3/E; B/2; B/3.8; TWO MARK FT5 FOR CANOPY AT PRESCRIPTION DRIVE-THROUGH
Misc
Partial Correction
05/22/2012
3 FOOTINGS FOR TRASH ENCLOSURE AT SOUTH OF BUILDING APPROVED.
Underground Electrical Inspection - Residential Partial 5/23/2012 (8:00 to 5:00) 5/23/2012 at 12:00 AM 05/23/2012
Misc
Partial Correction
05/16/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Misc
Partial Correction
05/16/2012
BURIED CONDUIT FOR SITE LIGHTING AND DATACOM COVERED WITHOUT INSPECTION EXPOSED AT <= 15' INTERVALS TO VERIFY SIZE AND DEPTH. NO ISSUES FOUND. *5 LIGHT POLES PIERS ONLY-OK TO POUR. CONDUITS TO THESE LIGHTS ARE NOT IN
Footing Inspection - Commercial Passed 5/30/2012 at 12:00 AM 05/30/2012
Misc
Resolved
05/30/2012
SUBJECT TO PSI APPROVAL, OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS DESCRIBED BELOW: 1/A.8 TO 1/E.7; A 1-5; 5/ A-E; 1/F TO 5/F TO 5/D.5 TO COMPLETE PERIMETER
Misc
Resolved
05/30/2012
SUBJECT TO PSI APPROVAL, OK TO POUR WHEN READY ISOLATED FOOTINGS AT: 3/B; 3/C; 3/D; 3/E; B/2; B/3.8; TWO MARK FT5 FOR CANOPY AT PRESCRIPTION DRIVE-THROUGH
Misc
Resolved
05/30/2012
3 FOOTINGS FOR TRASH ENCLOSURE AT SOUTH OF BUILDING APPROVED.
Underground Electrical Inspection - Residential Partial 5/30/2012 (8:00 to 5:00) 5/30/2012 at 12:00 AM 05/30/2012
Misc
Partial Correction
05/23/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Misc
Partial Correction
05/23/2012
BURIED CONDUIT FOR SITE LIGHTING AND DATACOM COVERED WITHOUT INSPECTION EXPOSED AT <= 15' INTERVALS TO VERIFY SIZE AND DEPTH. NO ISSUES FOUND. *5 LIGHT POLES PIERS ONLY-OK TO POUR. CONDUITS TO THESE LIGHTS ARE NOT IN
Misc
Partial Correction
05/30/2012
1" PVC CONDUIT FROM L.P. #1 TO #3 TO #2 + FROM #4 TO #5 OK TO COVER WHEN READY EXCEPT WITHIN 5' OF EACH POLE BASE WHERE DEPTH NEEDS TO BE INCREASED TO >=18";
Underground Electrical Inspection - Residential Partial 5/30/2012 at 12:00 AM 05/30/2012
Misc
Partial Correction
05/30/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Misc
Partial Correction
05/30/2012
BURIED CONDUIT FOR SITE LIGHTING AND DATACOM COVERED WITHOUT INSPECTION EXPOSED AT <= 15' INTERVALS TO VERIFY SIZE AND DEPTH. NO ISSUES FOUND. *5 LIGHT POLES PIERS ONLY-OK TO POUR. CONDUITS TO THESE LIGHTS ARE NOT IN
Misc
Partial Correction
05/30/2012
1" PVC CONDUIT FROM L.P. #1 TO #3 TO #2 + FROM #4 TO #5 OK TO COVER WHEN READY. ONE DISTORTED BEND NEAR EXISTING 3RD ST DRIVEWAY NOT CORRECTED -- DO NOT COVER
Electrical Service Inspection Not Ready 5/31/2012 5/31/2012 at 12:00 AM 05/31/2012
Misc
Partial Correction
05/31/2012
DISCUSSED PLANS FOR CUT-OVER OF SERVICE TO MEDICAL CLINIC; TO CONTINUE WITH IN-PROGRESS INSPECTION(S) 6/1/12
Electrical Service Inspection Not Ready 6/1/2012 at 12:00 AM 06/01/2012
Misc
Partial Correction
05/31/2012
RELEASED TO KCP&L NEWLY-CONFIGURED SERVICE TO EXISTING MEDICAL CLINIC AT 615 SW 2ND ST
Underground Electrical Inspection - Residential Partial 6/5/2012 6/5/2012 at 12:00 AM 06/05/2012
Misc
Partial Correction
05/30/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Misc
Partial Correction
05/30/2012
BURIED CONDUIT FOR SITE LIGHTING AND DATACOM COVERED WITHOUT INSPECTION EXPOSED AT <= 15' INTERVALS TO VERIFY SIZE AND DEPTH. NO ISSUES FOUND. *5 LIGHT POLES PIERS ONLY-OK TO POUR. CONDUITS TO THESE LIGHTS ARE NOT IN
Misc
Partial Correction
05/30/2012
6/5/12 DRIVEWAY CROSSING INSPECTED; NO ISSUES. ONE DISTORTED BEND NEAR 3RD ST DRIVEWAY NOT CORRECTED -- RECORDED EARLIER AS "DO NOT COVER" -- PRESENTLY COVERED WITHOUT APPROVAL
Footing Inspection - Commercial Passed 6/6/2012 at 12:00 AM 06/06/2012
Underground Electrical Inspection - Residential Passed 6/6/2012 at 12:00 AM 06/06/2012
Misc
Resolved
06/06/2012
OK TO COVER WHEN READY THREE 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM TRANSFORMER LOCATION TO BUILDING ENTRY; TWO 2" TELEPHONE SERVICE CONDUITS FROM MANHOLE TO BUILDING ENTRY
Misc
Resolved
06/06/2012
BURIED CONDUIT FOR SITE LIGHTING AND DATACOM COVERED WITHOUT INSPECTION EXPOSED AT <= 15' INTERVALS TO VERIFY SIZE AND DEPTH. NO ISSUES FOUND. *5 LIGHT POLES PIERS ONLY-OK TO POUR. CONDUITS TO THESE LIGHTS ARE NOT IN
Misc
Resolved
06/06/2012
6/5/12 DRIVEWAY CROSSING INSPECTED; NO ISSUES. ONE DISTORTED BEND NEAR 3RD ST DRIVEWAY NOT CORRECTED -- RECORDED EARLIER AS "DO NOT COVER" -- PRESENTLY COVERED WITHOUT APPROVAL
Rough Framing Inspection - Commercial Partial 6/8/2012 (8:00 to 5:00) 6/8/2012 at 12:00 AM 06/08/2012
Misc
Partial Correction
06/08/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Rough Framing Inspection - Commercial Partial 6/11/2012 at 12:00 AM 06/11/2012
Misc
Partial Correction
06/08/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Suspended Slab Inspection Passed 6/12/2012 at 12:00 AM 06/12/2012
Rough Framing Inspection - Commercial Partial 6/13/2012 at 12:00 AM 06/13/2012
Misc
Partial Correction
06/11/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Rough Framing Inspection - Commercial Partial 6/14/2012 at 12:00 AM 06/14/2012
Misc
Partial Correction
06/13/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Miscellaneous Inspection Passed 6/14/2012 at 12:00 AM 06/14/2012
Misc
Resolved
06/14/2012
MONITORING CORRECTION OF COMPLAINT ON "OVERGROWN GRASS"
Piers/Caissons Inspection - Commercial Passed 6/14/2012 at 12:00 AM 06/14/2012
Misc
Resolved
06/14/2012
OK TO PLACE WHEN READY TWO CONCRETE COLUMN PILASTERS PER DETAIL 7/S-3.1
Rough Framing Inspection - Commercial Partial 6/15/2012 at 12:00 AM 06/15/2012
Misc
Partial Correction
06/14/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Rough Framing Inspection - Commercial Partial 6/18/2012 at 12:00 AM 06/18/2012
Misc
Partial Correction
06/15/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Rough Framing Inspection - Commercial Partial 6/19/2012 at 12:00 AM 06/19/2012
Misc
Partial Correction
06/18/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Rough Framing Inspection - Commercial Partial 6/21/2012 at 12:00 AM 06/21/2012
Misc
Partial Correction
06/19/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Rough Framing Inspection - Commercial Partial 6/26/2012 6/26/2012 at 12:00 AM 06/26/2012
Misc
Partial Correction
06/21/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
In-wall Inspection Partial 6/29/2012 at 12:00 AM 06/29/2012
Misc
Partial Correction
06/29/2012
OK TO COVER WHEN READY WALL FRAMING & IN-WALL SYSTEMS @ INTERIOR & EXTERIOR WALLS AFTER: 1) VERTICAL DWV & WATER PIPING IS SECURED THROUGHOUT ITS HEIGHT 2) ELECTRICAL BOX STAND-OFFS ARE EXTENDED TO ENSURE SOLID BOXES
Rough Framing Inspection - Commercial Passed 6/29/2012 (8:00 to 5:00) 6/29/2012 at 12:00 AM 06/29/2012
Misc
Partial Correction
06/26/2012
PROGRESS INSPECTION OF LIGHT-GAUGE STEEL FRAMING
Electrical Service Inspection Not Ready 7/11/2012 at 12:00 AM 07/11/2012
Misc
Partial Correction
06/01/2012
RELEASED TO KCP&L NEWLY-CONFIGURED SERVICE TO EXISTING MEDICAL CLINIC AT 615 SW 2ND ST
Misc
Corrective Action Required
07/11/2012
BUILDING STEEL GROUND TO BE COMPLETED
Misc
Corrective Action Required
07/11/2012
GROUND ROD NOT 3/4" x 10' PER DRAWING
Electrical Service Inspection Partial 7/12/2012 at 12:00 AM 07/12/2012
Misc
Resolved
07/12/2012
RELEASED TO KCP&L NEWLY-CONFIGURED SERVICE TO EXISTING MEDICAL CLINIC AT 615 SW 2ND ST
Misc
Resolved
07/12/2012
BUILDING STEEL GROUND TO BE COMPLETED
Misc
Resolved
07/12/2012
GROUND ROD NOT 3/4" x 10' PER DRAWING
Misc
Partial Correction
07/12/2012
BUILDING STEEL GROUND JUMPER INSTALLED. 3/4" x 10' GROUND ROD + G.E.C. INSTALLED PER DRAWING. OK FOR INSTALLATION OF SERVICE CONDUCTORS AND FOR ACTIVATION OF HVAC SYSTEM FOR CONSTRUCTION COOLING.
Misc
Corrective Action Required
07/12/2012
FURTHER INSPECTION REQUIRED AS SERVICE EQUIPMENT INSTALLATION AND TERMINATIONS ARE COMPLETED.
Miscellaneous Inspection Passed 7/13/2012 at 12:00 AM 07/13/2012
Above Ceiling Inspection Partial 7/16/2012 7/16/2012 at 12:00 AM 07/16/2012
Misc
Partial Correction
07/16/2012
OK TO COVER WHEN READY CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: DRIVE-THROUGH CANOPY;
Gas Piping Inspection - Commercial Partial 7/16/2012 7/16/2012 at 12:00 AM 07/16/2012
Misc
Corrective Action Required
07/16/2012
EXPOSED PIPING TO BE PAINTED BEFORE FINAL INSPECTION
Misc
Corrective Action Required
07/16/2012
ADD SUPPORTS AT TEE-OFF'S TO TWO RTU'S
Gas Service Inspection - Commercial Passed 7/16/2012 at 12:00 AM 07/16/2012
Above Ceiling Inspection Not Ready 7/20/2012 at 12:00 AM 07/20/2012
Misc
Partial Correction
07/16/2012
OK TO COVER WHEN READY CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: DRIVE-THROUGH CANOPY;
Above Ceiling Inspection Partial 7/23/2012 7/23/2012 at 12:00 AM 07/23/2012
Misc
Partial Correction
07/20/2012
OK TO COVER WHEN READY CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: DRIVE-THROUGH CANOPY; PHARMACY AREA @ REAR
Sprinkler - Hydrostatic Test Passed 7/27/2012 at 10:00 AM 07/27/2012
Miscellaneous Inspection Passed 8/3/2012 8/2/2012 at 12:00 AM 08/02/2012
Misc
Resolved
08/02/2012
TESTING OF ELECTRICAL RECEPTACLES IN PROGRESS
Above Ceiling Inspection Passed 8/2/2012 at 12:00 AM 08/02/2012
Misc
Resolved
08/02/2012
OK TO COVER WHEN READY CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: DRIVE-THROUGH CANOPY; PHARMACY AREA @ REAR
Electrical Service Inspection Passed 8/2/2012 at 12:00 AM 08/02/2012
Misc
Resolved
08/02/2012
RELEASED TO KCP&L NEWLY-CONFIGURED SERVICE TO EXISTING MEDICAL CLINIC AT 615 SW 2ND ST
Gas Piping Inspection - Commercial Passed 8/2/2012 at 12:00 AM 08/02/2012
Misc
Resolved
08/02/2012
EXPOSED PIPING TO BE PAINTED BEFORE FINAL INSPECTION
Misc
Resolved
08/02/2012
ADD SUPPORTS AT TEE-OFF'S TO TWO RTU'S
In-wall Inspection Passed 8/2/2012 at 12:00 AM 08/02/2012
Misc
Resolved
08/02/2012
OK TO COVER WHEN READY WALL FRAMING & IN-WALL SYSTEMS @ INTERIOR & EXTERIOR WALLS AFTER: 1) VERTICAL DWV & WATER PIPING IS SECURED THROUGHOUT ITS HEIGHT 2) ELECTRICAL BOX STAND-OFFS ARE EXTENDED TO ENSURE SOLID BOXES
Alarm Test Passed 8/3/2012 at 12:00 AM 08/03/2012
Sprinkler - Flow Test Passed 8/3/2012 at 12:00 AM 08/03/2012
Occupancy Inspection - Codes Commercial Failed 8/7/2012 8/7/2012 at 12:00 AM 08/07/2012
Misc
Corrective Action Required
08/07/2012
RESOLVE ANY ISSUES FROM OTHER DEPARTMENTS: - FIRE - WATER UTILITIES - PUBLIC WORKS - PLANNING & DEVELOPMENT
Misc
Corrective Action Required
08/07/2012
ENSURE ALL WALL PENETRATIONS ARE FULLY SEALED
Misc
Corrective Action Required
08/07/2012
SECURE TO WALL THE COPPER WATER PIPE AT S SIDE OF ROLLING STEEL DOOR @ SW
Misc
Corrective Action Required
08/07/2012
LABEL MAIN DISTRIBUTION PANEL
Misc
Corrective Action Required
08/07/2012
WATER HOSE CONNECTION BELOW ROOF HATCH REQUIRES VACUUM BREAKER
Misc
Corrective Action Required
08/07/2012
PAINTING OF ROOFTOP GAS PIPING: REQUIRES FULL COVERAGE FULL LENGTH TO CONNECTION AT RTU
Occupancy Inspection - Fire Temporary C of O 8/7/2012 at 12:00 AM 08/07/2012
Misc
Corrective Action Required
08/07/2012
post the numeric address on the 3rd street side, readable from the roadway, contrasting color with the background replace the east mandoor exit/combo light
Occupancy Inspection - Planning Temporary C of O 08/07/2012
Corrective Action Required
08/07/2012
LANDSCAPING. Sodding shall be completed along the south property line adjacent to the cellular tower enclosure as well as along the Blue Pkwy right-of-way.
Occupancy Inspection - Fire Passed 8/9/2012 at 12:00 AM 08/09/2012
Misc
Corrective Action Required
08/09/2012
post the numeric address on the 3rd street side, readable from the roadway, contrasting color with the background replace the east mandoor exit/combo light
Occupancy Inspection - Codes Commercial Temporary C of O 8/15/2012 at 12:00 AM 08/15/2012
Misc
Corrective Action Required
08/07/2012
RESOLVE ANY ISSUES FROM OTHER DEPARTMENTS: - PUBLIC WORKS - PLANNING & DEVELOPMENT
Misc
Resolved
08/15/2012
ENSURE ALL WALL PENETRATIONS ARE FULLY SEALED
Misc
Resolved
08/15/2012
SECURE TO WALL THE COPPER WATER PIPE AT S SIDE OF ROLLING STEEL DOOR @ SW
Misc
Resolved
08/15/2012
LABEL MAIN DISTRIBUTION PANEL
Misc
Resolved
08/15/2012
WATER HOSE CONNECTION BELOW ROOF HATCH REQUIRES VACUUM BREAKER
Misc
Resolved
08/15/2012
PAINTING OF ROOFTOP GAS PIPING: REQUIRES FULL COVERAGE FULL LENGTH TO CONNECTION AT RTU
Occupancy Inspection - Codes Commercial Partial 8/27/2012 at 12:00 AM 08/27/2012
Misc
Corrective Action Required
08/15/2012
RESOLVE ANY DEVELOPMENT ISSUES: - PUBLIC WORKS - PLANNING & DEVELOPMENT
Occupancy Inspection - Codes Commercial Partial 8/29/2012 at 12:00 AM 08/29/2012
Misc
Corrective Action Required
08/27/2012
RESOLVE ANY DEVELOPMENT ISSUES: - PUBLIC WORKS - PLANNING & DEVELOPMENT
Occupancy Inspection - Codes Commercial Partial 8/29/2012 at 12:00 AM 08/29/2012
Misc
Corrective Action Required
08/29/2012
RESOLVE REMAINING PUBLIC WORKS ISSUES
Occupancy Inspection - Codes Commercial Full C of O 9/25/2012 at 12:00 AM 09/25/2012
Misc
Resolved
09/25/2012
RESOLVE REMAINING PUBLIC WORKS ISSUES
Occupancy Inspection - Engineering Passed 12/05/2013
Documents & Images
Date Uploaded File Type Document Name
02/09/2011 Letter Plan Review Conditions
02/25/2011 Letter Plan Review Conditions
04/20/2011 Letter PRCOM20110083CVSLetter.pdf
03/26/2012 Letter Building Permit
03/26/2012 Letter Plan Review Conditions
04/04/2012 Letter Inspection Summary
04/05/2012 Letter Inspection Summary
04/06/2012 Letter Inspection Summary
04/10/2012 Letter Inspection Summary
04/11/2012 Letter Inspection Summary
04/12/2012 Letter Inspection Summary
04/12/2012 Letter Inspection Summary
04/17/2012 Letter Fire (Alarm) Plan Review Notice
04/19/2012 Letter Inspection Summary
04/25/2012 Letter Inspection Summary
05/15/2012 Letter Inspection Summary
05/16/2012 Letter Inspection Summary
05/17/2012 Letter Inspection Summary
05/22/2012 Letter Inspection Summary
05/23/2012 Letter Inspection Summary
05/30/2012 Letter Inspection Summary
05/30/2012 Letter Inspection Summary
05/31/2012 Letter Inspection Summary
06/01/2012 Letter Inspection Summary
06/05/2012 Letter Inspection Summary
06/06/2012 Letter Inspection Summary
06/12/2012 Letter Inspection Summary
06/29/2012 Letter Inspection Summary
07/12/2012 Letter Inspection Summary
07/16/2012 Letter Inspection Summary
07/16/2012 Letter Inspection Summary
07/23/2012 Letter Inspection Summary
08/07/2012 Letter Inspection Summary
08/07/2012 Letter Fire Loss Reduction Form
08/09/2012 Letter Fire Loss Reduction Form
08/15/2012 Letter Temporary Certificate of Occupancy
09/25/2012 Letter Field Certificate of Occupancy
09/26/2012 Letter Final Certificate of Occupancy
06/21/2013 Letter Fire (Alarm) Plan Review Notice
06/21/2013 Letter Fire (Alarm) Plan Review Notice
06/21/2013 Letter Fire (Sprinkler) Plan Review
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire (Sprinkler) Plan Review
06/25/2013 Letter Fire Building Plan Review
07/02/2013 Letter Plan Review Conditions
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home