Planning Review
|
Corrections
|
04/04/2025
|
04/07/2025
|
|
Claire Byers
|
|
Corrective Action Required
If there will be a dumpster, provide trash enclosure details. "Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. Each trash enclosure shall be protected through the installation of four-inch bollards along the rear wall of the trash enclosure."
|
|
Corrective Action Required
Accessible spaces shall be located at the nearest point to the front building entry and/or accessible ramp. Show the expected accessible path into the main customer entrance of the building for new accessible parking spaces.
|
|
Corrective Action Required
Include note on sheet C012: Every accessible parking space required by this section shall be identified by a sign, mounted on a pole or other structure, located between 36 inches (3 feet) and 60 inches (5 feet) above the ground measured from the bottom of
the sign, at the head of the parking space. The sign shall be at least 12” by 18” in area and meet the requirements set forth in the Manual on Uniform Traffic Control Devices, as referenced in Section 29-381 of the Lee’s Summit General Code of Ordinances.
|
|
Corrective Action Required
Provide more information on lighting labeled 'P' placeholder on Photometric Plan. If still unidentified by time of FDP approval, will be added as condition of approval to be reviewed at time of final building inspections for code compliance.
|
|
Corrective Action Required
C.33. Signs. Location, size, and type of material of all proposed monument or freestanding signs, if known.
|
|
Corrective Action Required
C.31 Mechanical Screening. Is any ground-mounted mechanical equipment proposed? What is box labeled 'T' on Landscaping Plan? If so, provide spec sheets including height, and note that it shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
|
|
Corrective Action Required
D.2. Screening Materials. Location, size and materials to be used in all screening of rooftop mechanical equipment. Per UDO, all roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. Metal screening not permitted without Planning Commission modification approval.
|
|
Corrective Action Required
Connect southernmost point of proposed sidewalk to existing sidewalk along existing parking lot.
|
|
Corrective Action Required
Street frontage tree and shrub requirements are not 'N/A', please update chart. Current landscape plan satisfies requirements, but needs to be shown as part of table calculations.
|
|
|
Engineering Review
|
Corrections
|
04/04/2025
|
04/04/2025
|
|
Susan Nelson, P.E.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
Corrective Action Required
Submit the SWPPP and a copy of the MDNR Land Disturbance Permit.
|
|
Corrective Action Required
Please add a note stating: “All construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
|
|
Corrective Action Required
Add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
|
|
Corrective Action Required
Show, with documentation, all utility easements and right-of-way lines.
|
|
Corrective Action Required
The existing water and sanitary lines shown do not agree with City mapping. There appears to be a water line about where the plans show an existing sanitary stub that does not appear on City mapping. Please reconcile.
|
|
Corrective Action Required
Show the watermain connection locations and type, including valves and restraints. The fire line will be connected to the public water main utilizing a cut-in tee with two valves at the main and a valve provided at the BFPD. The BFPD must be located outside of the easement (LS 6901 I. Fire Lines). Grade the vault area to drain and provide a note indicating how the vault sump will drain.
|
|
Corrective Action Required
Where is the plan to complete or remove the unfinished drive that terminates into grass in the area where the two watermain connections are proposed?
|
|
Corrective Action Required
Inspect the existing sidewalks and curb ramps along the project site and include in this project the repair panels necessary to address concrete failures and any compromises to ADA compliance. Several areas were observed to require repair, including a spall at the bottom of an ADA ramp to the roadway.
|
|
Corrective Action Required
The proposed landing before the proposed curb ramp to the roadway does not appear to provide an adequate level turning space, please verify that all sidewalks and ramps are ADA compliant and revise accordingly. Add a landing (turning space) along the sidewalk to negotiate the turn from the sidewalk to the proposed lift approach (Detail 1). Add a landing (turning space) along the sidewalk to negotiate the turn from the sidewalk to the building (Detail 2). Limit the slope and cross slope call-out within landings (turning spaces) to max. 1.5% per City Standard Detail.
|
|
Corrective Action Required
Add any City Standard Details that apply to this project, to include but not limited to, curb and gutter, sidewalks and ramps, pipe bedding, BFPD (WAT-12), water meter (WAT-11), etc. Remove City Standard Details that are not being used in this project such as the sanitary precast manhole detail.
|
|
Corrective Action Required
The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
|
|
Corrective Action Required
Show in the pavement sections and add the following notes to the plans regarding paving per Section 2200 of the City Design and Construction Manual. Note that the minimum surface course thickness for KCMMB asphalt is 2 inches and the Unified Development Ordinance Section 8.620 – Parking Lot Design will still govern for overall thickness requirements.
- All asphalt materials shall conform to the KCMMB ASPHALT MATERIAL SPECIFICATION, current edition.
- All concrete materials for paving curb and gutter, sidewalks, paths, commercial driveways and other pavements in the right of way shall conform to the KCMMB specifications.
|
|
Corrective Action Required
Add stormwater drainage information to the plans including the pipe/inlet calculations and pipe profiles. Add site/project specific ADS design information.
|
|
|
Traffic Review
|
No Comments
|
04/04/2025
|
04/03/2025
|
|
Erin Ralovo
|
|
|
Fire Review
|
Corrections
|
04/04/2025
|
04/03/2025
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Miscellaneous Correction
Corrective Action Required
Provide clarification where the fire protection main enters the foundation and where the riser room is located. Placing the fire protection main under the entire diagonal length of the building is highly discouraged.
NFPA 24 10.4.3.2 *
Where approved, private fire service mains supplying systems within the building shall be permitted to extend more than 10 ft (3.0 m) under the building when all the requirements of 10.4.3.2.1, through 10.4.3.2.4 are met.
|
|
Miscellaneous Correction
Corrective Action Required
NFPA 24 10.4.3.2.4
A valve shall be installed before the piping enters under the building and within 24 in. (600 mm) of where the piping enters the building.
Provide a post indicator valve (PIV) on the fire protection main at the foundation.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Relocate the FDC as needed per Item #2.
|
|
|
Building Codes Review
|
Corrections
|
04/04/2025
|
04/03/2025
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Water service piping from main to meter and 10' past meter must be 1" when serving a 1" meter.
|
|
Miscellaneous Correction
Corrective Action Required
Provide cleanouts near where sanitary sewer lines leave building. (multiple locations)
|
|
|