Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
07/24/2024
|
07/26/2024
|
|
Mike Weisenborn
|
|
Corrective Action Required
The final plat documents shall not be submitted for signatures until after the recording information for the vacation of ROW and vacation of easements has been added to the plat document.
|
|
|
GIS Plat Review
|
Approved with Conditions
|
07/24/2024
|
07/25/2024
|
|
Mike Weisenborn
|
|
Corrective Action Required
This is not a formal correction, but a request to help the JaCo GIS group: on the east line of lot 4, please indicate that the 192.05 is the LOT DIMENSION. There are 3 dimensions listed there, and it could be clearer that 192.05 is for lot 4 boundary.
We have already noted that 192.05 in our GIS.
|
|
|
Engineering Review
|
Approved with Conditions
|
07/24/2024
|
07/24/2024
|
|
Sue Pyles, P.E.
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
|
Traffic Review
|
No Comments
|
06/28/2024
|
07/01/2024
|
|
Shannon McGuire
|
|
|
Planning Review
|
Corrections
|
06/28/2024
|
07/01/2024
|
|
Shannon McGuire
|
|
Corrective Action Required
Please label all IE’s, ROW’s and UE’s to be vacated as “Easement vacated by Ord #. XXXX”. The Ord number will be filled in prior to mylars being submitted for City signatures.
|
|
Corrective Action Required
Please label each lot with its respective street number;
Lot 1 = 220 SE Green Street
Lot 2 = 205 SE Green Street
Lot 3 = 200 SE Johnson Street
Lot 4 = 200 SE 3rd Street
|
|
Corrective Action Required
Please show the location of any oil and/or gas well. If none are present add a note stating so and cite the source of information.
|
|
Corrective Action Required
Since the plat consists of more than one sheet, the certifications for city approval shall be repeated on each sheet, in approximately the same location on each sheet.
|
|
Corrective Action Required
Please update Josh Johnson’s signature to reflect his correct title, “Joshua Johnson, AICP, Director of Development Services”.
|
|
|
Engineering Review
|
Corrections
|
06/28/2024
|
06/28/2024
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
There is an Ingress/Egress Easement called out at the NE corner of Lot 1. Please add the note that it is being vacated by separate document.
|
|
Corrective Action Required
Please show the location of the plugged abandoned water well.
|
|
Corrective Action Required
Is an ingress/egress easement provided for Lots 2-4 to access to public rights of way via internal drives located within Lot 1? Please clarify.
|
|
|
Fire Review
|
No Comments
|
06/28/2024
|
06/26/2024
|
|
Jim Eden
|
|
|
GIS Plat Review
|
Corrections
|
06/28/2024
|
06/18/2024
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please provide an ITB on one end of the west line of lot 4.
|
|
Corrective Action Required
The south line of the plat does not add up.
177.15+63.91+19.36+34.02+113.50= 407.94
Please revise to match. And there's no identifiable measurement on that part of lot 1, so have no idea what that measurement should be. Please make all lot dimensions clear.
|
|
|