Summary
PL2023220
Amtrak Platform Improvement Project
Commercial Final Development Plan
Commercial Final Development Plan
Approved
08/17/2023
CITY OF LEES SUMMIT
ADA platform improvements to the existing Amtrak station in downtown Lee's Summit
Locations
Contacts
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Karen Felder, PMP, Address:AmTrak, Phone:(215) 360-5589  
Gannett Fleming, Inc, Address:207 Senate Avenue  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review Approved with Conditions 10/17/2025 10/16/2025
Susan Barry, P.E.
Corrective Action Required
10/16/2025

Pavement marking on parking spaces needs to be preformed thermoplastic for both symbols and lines.
Corrective Action Required
10/16/2025

ADA spaces shall be marked with a blue square with white ADA symbol. MUTCD Figure 3B-19
Informational
10/16/2025

We do not want the old bricks delivered to our maintenance facility. The contractor can salvage them.
Corrective Action Required
10/16/2025

For the parking signs: The height to the bottom of a sign when it is located in a pedestrian walkway or extends into a walway shall be a minimum of 80 inches above the walkway.
Traffic Review Corrections 04/21/2025 04/21/2025
Susan Barry, P.E.
Corrective Action Required
04/21/2025

No parking signs need to be breakaway. We have sign details on our website that can be provided if needed.
Corrective Action Required
04/21/2025

One end of the platform has a Caution, End of Platform sign and the other has Authorized Personnel. Why are they different? And I assume that there is a guardrail at both ends?
Corrective Action Required
04/21/2025

Lights do not match the rest of downtown lights. Also, lights are maintained by Parks and Rec so need to be approved by them.
Corrective Action Required
04/21/2025

The sidewalk for emergency access - Is this ADA compliant? Is there a sidewalk profile to verify that?
Corrective Action Required
04/21/2025

Is it possible to extend the black fencing to the south to 3rd Street?
Corrective Action Required
04/21/2025

During Phase 1, the ADA spaces are closed. Where are you putting the ADA spaces during construction?
Corrective Action Required
04/21/2025

Is there another location for the Contractor Staging? This is taking up a lot of parking spaces. How long do you expect the project to last?
Corrective Action Required
04/21/2025

Can we get a No Smoking sign on the shelter as well as the restrooms?
Corrective Action Required
04/21/2025

One of the notes mentions bike racks, but I did not see any marked on the plans.
Corrective Action Required
04/21/2025

Put sheets C200-C202 in order, north to south. It's very confusing to figure out what is being done. Or use Match lines.
Corrective Action Required
04/21/2025

For the temporary ADA ramp, make sure it is clearly marked and there are no obstructions from wherever the ADA parking stalls are.
Engineering Review No Comments 04/21/2025 04/21/2025
Sue Pyles, P.E.
Fire Review No Comments 04/21/2025 04/18/2025
Jim Eden
Planning Review No Comments 04/21/2025 04/14/2025
Claire Byers
Building Codes Review No Comments 04/21/2025 04/14/2025
Joe Frogge
Engineering Review No Comments 06/06/2024 06/07/2024
Grant White
Planning Review Corrections 06/06/2024 06/07/2024
Claire Byers
Corrective Action Required
06/07/2024

Please provide a signed and notarized Ownership Affidavit and signed Final Development Plan Application.
Corrective Action Required
06/07/2024

Lighting- Revise the proposed light poles to match the existing downtown light poles.
Building Codes Review No Comments 06/06/2024 06/06/2024
Joe Frogge
Traffic Review No Comments 06/06/2024 06/05/2024
Erin Ralovo
Fire Review Complete 06/06/2024 06/04/2024
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 05/23/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your Planning Application