Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
06/09/2023
|
06/12/2023
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), sanitary sewer development fee, and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $53,319.40
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
No Comments
|
06/09/2023
|
06/08/2023
|
|
Shannon McGuire
|
|
|
Engineering Review
|
Approved with Conditions
|
12/19/2022
|
12/19/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), sanitary sewer development fee, and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $53,319.40
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
No Comments
|
12/01/2022
|
12/01/2022
|
|
Shannon McGuire
|
|
|
Engineering Review
|
Approved with Conditions
|
12/01/2022
|
12/01/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The cost estimate was not sufficiiently itemized, and the following corrections should be made: 1) pavement and sawcutting and installation of joints as per plan, 2) subgrade, 3) curb and gutter, 4) sidewalk, 5) ADA-accessible ramps, 6) sanitary sewer, including wye connection and all pipe and cleanouts, 7) water line, including tap, 8) fire line, including cut-in tee, 9) valves, 10) private stormwater costs including piping and all structures, 11) grading for parking lot and peripheral areas not associated with the bulding pad, 12) erosion and sediment control measures and devices, 13) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil. Please do not include gas, electric, building, lighting, or landsaping as these are not items reviewed or inspected by the engineering group.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Building Codes Review
|
No Comments
|
12/01/2022
|
11/22/2022
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
12/01/2022
|
11/22/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
12/01/2022
|
11/22/2022
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
Confirn the FDC outside the NE door from the appartus floor will not block the egress door when a hose is connected to it.
|
|
|
Engineering Review
|
Corrections
|
11/11/2022
|
11/11/2022
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
General:
• Submit an Engineer's Estimate of Probable Construction Costs.
• As there is significant grading shown crossing the west property line, please provide documentation that the adjacent property owner is aware of and gives permission for this offsite work.
|
|
Corrective Action Required
Please include the following notes (or similar):
• All construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail.
• The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.
|
|
Corrective Action Required
Please separate the ESC Plan into before, during, and after construction. Include a phasing chart indicating when each ESC feature is to be installed and removed.
|
|
Corrective Action Required
Separate the grading plan and storm sewer plan onto different plan sheets.
|
|
Corrective Action Required
Please revise the fire line connection to the existing water main to indicate it will be made with a tee with 3 gate valves.
|
|
Corrective Action Required
Please include the design HGL in the storm sewer Profile views.
|
|
Corrective Action Required
Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
|
|
Corrective Action Required
The water line crossing the storm sewer just upstream of 1000.JB does not meet the City’s requirement of a minimum of 18” separation. Please revise.
|
|
Corrective Action Required
The specific details of ADA accessible ramps must include, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual. Elevation call-outs, although required, are not sufficient. Other design details specified in this section are required, including slope call-outs which comply with the criteria listed in Table LS-5, and section views specified in 5304.8.
|
|
|
Fire Review
|
Approved with Conditions
|
11/11/2022
|
11/07/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
Confirn the FDC outside the NE door from the appartus floor will not block the egress door when a hose is connected to it.
|
|
|
Traffic Review
|
No Comments
|
11/11/2022
|
11/07/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
Corrections
|
11/11/2022
|
11/03/2022
|
|
Shannon McGuire
|
|
Corrective Action Required
Will there be any ground mounted mechanical equipment? Please show the location, size, and type of material to be used in all screening of ground mounted mechanical equipment. Please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
|
|
Corrective Action Required
Will there be any roof mounted mechanical equipment? On the elevations, please show a dashed line indicating the roof line and rooftop mechanical equipment. Please show the location, size and materials to be used in all screening of rooftop mechanical equipment.
|
|
Corrective Action Required
Deciduous trees shall be a minimum of three-inch caliper, measured at a point 6 inches above the ground or top of the root ball, at planting. Evergreen trees shall be a minimum height of eight feet at planting. As proposed the plans do not meet these requirements.
|
|
Corrective Action Required
Please label the width of the driveway leading from SW Lemans Ln.
|
|
|
Building Codes Review
|
No Comments
|
11/11/2022
|
10/31/2022
|
|
Joe Frogge
|
|
|