Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
08/02/2022
|
08/02/2022
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Approved with Conditions
|
08/02/2022
|
07/26/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $84.00 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
|
|
|
Fire Review
|
No Comments
|
08/02/2022
|
07/26/2022
|
|
Mike Weisenborn
|
|
|
Building Codes Review
|
No Comments
|
08/02/2022
|
07/26/2022
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
Approved with Conditions
|
08/02/2022
|
07/26/2022
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
Following the 3rd Street CIP, if the drive-through does not function or flow appropriately, a redesign of the parking lot may be necessary by the business owner.
|
|
Miscellaneous Correction
Corrective Action Required
The current site has two access points. The 3rd Street CIP will result in one access point near the middle of the site.
|
|
|
Traffic Review
|
Approved with Conditions
|
07/21/2022
|
07/19/2022
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
Following the 3rd Street CIP, if the drive-through does not function or flow appropriately, a redesign of the parking lot may be necessary by the business owner.
|
|
Miscellaneous Correction
Corrective Action Required
The current site has two access points. The 3rd Street CIP will result in one access point near the middle of the site.
|
|
|
Planning Review
|
Corrections
|
07/21/2022
|
07/19/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
LAND USE SCHEDULE. Revise the total FAR to read 0.11. The 0.02 listed under total reflects the FAR for the addition only.
|
|
|
Engineering Review
|
Corrections
|
07/21/2022
|
07/16/2022
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Show the utility contact information provided (in the response letter), on the set of plans.
|
|
Corrective Action Required
A visual survey of the site isn’t an acceptable source for oil/gas well presence. Please use/refer to an accredited source such as the Edward Alton May’s 1995 environmental study or the Missouri DNR geological survey (GeoSTRAT). Show the finding(s) within an oil and/gas note, on the set of plans.
|
|
Corrective Action Required
Does the 6” wide curb to be constructed match the characteristics of a dowelled curb? Indicate the type of curb on the set of plans and make sure to include a construction detail. Construction detail of curbs can be obtained from the GEN-4 curb and gutter detail, accessible through the Design & Construction manual tab located on the City’s website.
|
|
Corrective Action Required
Revise the detail(s) shown on sheet A201, as applicable. Please also be aware that rebuilding the entire asphalt pavement (in comparison with asphalt patching) will be necessary in the case where demolition, as shown on sheet G002, includes more than just the surface course of existing asphalt pavement. If so, make sure to include a proposed cross-sectional detail of asphalt pavement.
|
|
Corrective Action Required
Update/revise the cost estimate sheet. Make sure to replace “Striping” with “New 6” curb”,and include "Demolition". EOOPCC needs to be submitted on a separate/unique sheet.
|
|
|
Building Codes Review
|
No Comments
|
07/21/2022
|
07/14/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
No Comments
|
07/21/2022
|
07/14/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
No Comments
|
07/13/2022
|
07/13/2022
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
07/13/2022
|
07/13/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
BUILDING ELEVATIONS. Label the colors of the proposed exterior materials for the addition.
|
|
Corrective Action Required
LAND USE SCHEDULE. Provide a table that lists the following site information:
- Lot Area;
- Total Floor Area (broken out by existing, proposed and total);
- Floor Area Ratio (existing and total);
- Number of Parking Spaces (required and proposed). ***FYI -- required parking spaces for retail uses are calculated as 5 spaces per 1,000 gross sq. ft.
|
|
|
Traffic Review
|
Approved with Conditions
|
07/13/2022
|
07/13/2022
|
|
Brad Cooley, P.E., RSPI
|
|
Corrective Action Required
Following the 3rd Street CIP, if the drive-through does not function or flow appropriately, a redesign of the parking lot may be necessary by the business owner.
|
|
Corrective Action Required
The current site has two access points. The 3rd Street CIP will result in one access point near the middle of the site.
|
|
|
Building Codes Review
|
No Comments
|
07/13/2022
|
07/07/2022
|
|
Joe Frogge
|
|
|
Engineering Review
|
Corrections
|
07/13/2022
|
07/05/2022
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Mention Final Development Plans or FDP, with(in) the title on the cover sheet.
|
|
Corrective Action Required
Include utility contact information. Make sure to also add the owner’s telephone number.
|
|
Corrective Action Required
Include a FEMA National Flood Hazard information note.
|
|
Corrective Action Required
Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
Corrective Action Required
Include the Missouri One Call System 1-800-DIG-RITE “Call Before You Dig” information.
|
|
Corrective Action Required
Include a general note stating that “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a field engineering inspector prior to any land disturbance work at (816) 969-1200”.
|
|
Corrective Action Required
Include a general note stating that “All construction shall conform to the City of Lee’s Summit’s Design and Construction manual”.
|
|
Corrective Action Required
Provide a demolition plan (sheet) showing the sawcut delineation and the footprint of the existing pavement area to be obliterated/removed.
|
|
Corrective Action Required
Will there be any new sidewalk or curb around the new building expansion?
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
|
|
|