Planning Application Status

PL2022075




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022075
LS Industrial, LLC
Commercial Final Development Plan
Commercial Final Development Plan
Void
02/25/2022
LS INDUSTRIAL LLC
Locations
Contacts
LS INDUSTRIAL LLC, Address:4 E FRANKLIN  
GEORGE BUTLER ASSOCIATES INC, Address:9801 RENNER BLVD, Phone:(913) 492-0400  
POLSINELLI PC, Address:900 W 48TH PLACE, SUITE 900, Phone:(913) 234-7458  
LS INDUSTRIAL LLC, Address:4 E FRANKLIN  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Corrections 03/11/2022 03/14/2022
Jim Eden
Code Statement
Corrective Action Required
03/13/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
03/13/2022

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC and public/private hydrant within 100 feet on both buildings.
Hydrants
Corrective Action Required
03/13/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide accessible fire hydrants in accordance with IFC TABLE C102.1 REQUIRED NUMBER AND SPACING OF FIRE HYDRANT. Provide hydrant coverage for the trailer storage lot.
Water Supply
Corrective Action Required
03/13/2022

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Work with LS Water Utilities to make sure there is adequate water to meet fire flow. The automatic sprinkler system in both buildings will allow for a 50% reduction in the fire flow required by IFC Table TABLE B105.1(2).
Planning Review Corrections 03/11/2022 03/11/2022
Victoria Nelson
Legal Description
Corrective Action Required
03/11/2022

Please submit an electronic copy of the legal description. Microsoft Word document is the preferred file formats. The legal description can be emailed to the planner's email address above.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Application type. Staff understands that the developer is still considering the option to rezone the property to PI, as opposed to proceed with a preliminary development plan application under the existing PMIX zoning. The developer’s ultimate decision may result in additional future comments.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Street frontage shrubs. The calculated number of required street frontage shrubs is incorrect. They mistakenly duplicate the number of street frontage trees. Shrubs are calculated at a higher rate.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Parking lot screening requirements. A modification to the parking lot screening requirements shall be required to document the lack of screening for the parking lot that parallels the SE Bailey Rd bridge overpass.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Parking/storage area. Clarify the nature of the use for the area at the southeast corner of the site.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Vision Clearance Sight Triangle. Show compliance with the vision clearance requirements of UDO Section 8.370 by adding a sight triangle to the landscape plan at every driveway connection with a street.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Application. Please submit a signed application
Miscellaneous Correction
Corrective Action Required
03/11/2022

Ownership Affidavit. Please submit a signed ownership affidavit.
Miscellaneous Correction
Corrective Action Required
03/11/2022

ROW. Please label the width of the ROW SE 16th St. Also, relocate the street name label for SE Bailey Rd so as not to overlap and cover the ROW width label for SE Bailey Rd.
Miscellaneous Correction
Corrective Action Required
03/11/2022

ADA signs. Please show the Dimensions of the ADA signs that will be in front of the ADA parking stalls.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Pavement Detail. Please show the pavement detail for each of the pavements types. See UDO Section 8.620.F for pavement design requirements.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Lighting. Please show all wall and parking lot lighting along with the photometric Plan. Please refer to the UDO Article 8 Subdivision 5-Lighting Standards. Provide manufacturer specifications of all exterior light fixture for review.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Phasing. Will this be completed in phases? Provide a phasing plan if this is the case. Is the intent for the project to be developed as a single lot, or is the intent to divide the property?
Miscellaneous Correction
Corrective Action Required
03/11/2022

Elevation. Please upload all elevation plans for the proposed buildings. Please refer to the UDO Article 8 Subdivision 3 and refer to all the Industrial area requirements. Please pay particular attention to the screening requirement of any roof-mounted mechanical equipment under UDO Section 8.180.E.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Land Use Schedule. Add a table on either the General Layout sheet (C2) or the Dimension Plan (C4) that lists out the following information: existing (and proposed, if applicable) zoning; total lot area; building floor area (including the following: total building area; building area broken out per building and further broken out by use of space within each building (office/warehousing/storage, etc.)); required and proposed number of parking spaces; impervious coverage sq. ft. and %; and floor area ratio (FAR)
Miscellaneous Correction
Corrective Action Required
03/11/2022

Parking. Please show the proposed and required parking numbers. Please refer to UDO Sec. 8.530
Miscellaneous Correction
Corrective Action Required
03/11/2022

Vehicle Parking. Show the calculation used to derive the number of required spaces, which is based on building use and square footage.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Parking lot setback. Please show the parking lot setback line.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Signs. Are there plans for a monument sign or any other types of signage?
Miscellaneous Correction
Corrective Action Required
03/11/2022

Landscaping. Deciduous trees shall not have a caliper less than 3”. Evergreen trees shall be a minimum 8’ in height at the time of planting. Please refer to UDO Sec 8.880 #3.
Miscellaneous Correction
Corrective Action Required
03/11/2022

Trash enclosure. Will there be any type of trash enclosure? If so, please refer to UDO Sec 8.180 Architectural characteristics, letter G.
Traffic Review Corrections 03/11/2022 03/11/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
03/10/2022

A Traffic Impact Study was not included with this submittal and will be required.
Corrective Action Required
03/11/2022

Pending a traffic study - It is likely modifications will need to be made to Bailey Rd. These modifications will need to be implemented into the plans. Additionally, truck traffic leaving south is a concern for Decker and Summit.
Informational
03/11/2022

The on-site converging point, where the three drives from the parking areas come together, could be problematic. There doesnt appear to be defined lanes where exiting the parking areas with offset intersecting paths.
Engineering Review Corrections 03/11/2022 03/11/2022
Gene Williams, P.E.
Corrective Action Required
03/10/2022

Sanitary sewer analysis was not included in the submittal package. Only a site flow analysis was provided. Sanitary sewer analysis shall be based on site-specific industrial flows anticipated by the applicant. The City of Lee's Summit design criteria does not have a specific "per sq. ft." figure for this base flow, so it will be important that the applicant determine what the anticipated maximum base flow from the industrial buildings will be, and the City will limit development to that number if downstream issues are evident.
Corrective Action Required
03/10/2022

The sanitary sewer study shall begin at the proposed project, including any contributors to flow, and continue downstream to City manhole 54-002. The Design and Construction Manual design criteris shall be followed for the analysis. It shall be based on ultimate build-out conditions, including the new Bailey Farm residential development and East Trails Middle School to the northeast of manhole 47-019. Please submit a complete sanitary sewer analysis. GIS records of manhole flowlines may be utilized for this analysis, and if results show questinable data, Record Drawings and/or field verification may be required.
Corrective Action Required
03/10/2022

A concept plan showing the off-site sanitary improvements (i.e., south of 16th St.) shall be provided.
Corrective Action Required
03/10/2022

A concept plan showing the off-site traffic improvements along 16th St. shall be provided, as well as any off-site traffic improvements to Bailey Rd. (if applicable, see Traffic comments).
Corrective Action Required
03/10/2022

A concept plan showing the sanitary sewer to serve customers on 16th St. shall be provided. The sanitary sewer shall be provided to them in terms of the minimum required lateral length, with the remainder of the connection to be made by the individual property owners at their expense.
Corrective Action Required
03/10/2022

Water line along 16th St. shall be shown in concept form for upgrade to a 12 inch line, to be looped to the water main within this project.
Corrective Action Required
03/10/2022

The stormwater report states the triple 48 inch pipe beneath 16th St. shall be designed to flow under pressure flow. While this may be acceptable, reasonable safety factor shall be followed for the design of this storm line crossing.
Corrective Action Required
03/10/2022

The stormwater report states that HDPE shall be utilized for the triple 48 inch pipes. The City does not allow HDPE for this road classification. Acceptable alternatives are CPP or RCP. Please revise as appropriate.
Corrective Action Required
03/10/2022

Please be aware that off-site easements for the drainage improvements between the existing industrial buildings to the south of the project will be the sole responsiblity of the applicant to obtain. In addition, any public drainage easement for the outfall of the triple 48 inch pipe shall also be the sole responsibility of the applicant to acquire.
Corrective Action Required
03/10/2022

Please be aware that some off-site sanitary sewer easements may already exist for the off-site sanitary sewer running generally north/south. Please review these easements, and show the general location of the sanitary sewer in relation to these easements to determine what, if any, other easements are necessary.
Corrective Action Required
03/10/2022

Further discsussions concerning the public water line loop shall be completed during the applicant meeting. Most of the interior water lines shall be private, with backflow vaults installed near the right of way or easement, but the public main shall be looped in some fashion to 16th St.
Corrective Action Required
03/11/2022

Is there enough separation between the triple 48 inch storm lines and the sanitary sewer? Please check, since this may present an issue for acquisition of off-site easements.
Corrective Action Required
03/11/2022

Suggest labeling the detention basin to the far southeast on all sheets just to avoid confusion (i.e., the one that is in hydraulic communication with the detention basin to the northeast of it). Or is this part of the bioswale? If so, please label as being part of the bioswale.
Corrective Action Required
03/11/2022

Please label all interior storm lines as "PRIVATE". This does not include the triple 48 inch culvert, which staff has identified as being most appropriate as a "PUBLIC" line.
Corrective Action Required
03/11/2022

Private sanitary laterals are shown entering manholes. Unless these private laterals are 8 inch or greater, they shall enter the public sanitary sewer line with a wye. If applicable, please revise.
Corrective Action Required
03/11/2022

Is this one (1) single lot? Please respond since it did not appear any lot lines were shown. This shall have an affect on the termination of public sanitary sewer. It shall also have an affect on the termination of public water lines.
Corrective Action Required
03/11/2022

The bioswale will be a critical feature of the stormwater improvements. Was the freeboard analyzed in terms of providing a minimum 2.0 feet of freeboard between the 100 year event and the top of the berm forming the bioswale, especially in reference to the boundary between the existing industrial development to the south (Maddox Acres) and this project? Was the triple 48 inch culvert designed to manage this flow without backwater affecting the HGL adversely (i.e., raising the HGL to a point less than 2.0 feet of freeboard from the low point of the bioswale berm)?
Corrective Action Required
03/11/2022

A graphical representation of the 100 year water surface elevation for the clogged/zero available storage condition shall be shown, along with dimesions to property lines, buildings, or right of way. A minimum of 20.0 feet setback is required from this WSE and any of these lines. Please provide the 100 year WSE for the clogged condition/zero available storage in graphic and numeric format on the plan sheet(s), and provide dimensions at key points.
Corrective Action Required
03/11/2022

The outfall of the triple culvert at 16th St. shall require energy dissipation above and beyond standard rip rap. Please show in concept format the proposed method for energy dissipation at the end of this outfall. It should incorporate a design which creates a stilling basin at the end of pipe, or other method to reduce stream power levels at the point of discharge to the existing stream.
Corrective Action Required
03/11/2022

Please show and label in concept format the location of the emergency spillways for each detention basin.
Corrective Action Required
03/11/2022

Previous project (The Grove) showed a north/south road from SE Summit St./16th St. intersection, with road widening required on the entire length of 16th St. This shall be discussed at the applicant meeting, since this proposed plan does not show this new public road nor any of the improvements to 16th St.
Corrective Action Required
03/11/2022

Ensure all lighting poles are located outside the limits of public easements.
Corrective Action Required
03/11/2022

Ensure all private curb inlets and private field inlets/junction boxes are located outside the limits of public easements.
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/26/2022 Plans The PDP
02/26/2022 Engineer Report/Study The Stormwater Report
02/28/2022 Application Form Preliminary Development Plan_LS Industrial-c
03/10/2022 REJECTED Industrial Sanitary Study
03/25/2022 Letter Applicant Letter - Dev. Apps (DRCP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home