Summary
PL2022051
The Retreat at Bailey Farms, 1st Plat - Public Streets, Storm and Master Drainage Plan
Engineering Plan Review
Engineering Plan Review
Approved
02/10/2022
CLAYTON PROPERTIES GROUP INC
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 12/19/2023 12/14/2023
Gene Williams, P.E.
Traffic Review No Comments 12/19/2023 12/06/2023
Erin Ralovo
Engineering Review Corrections 11/13/2023 11/13/2023
Gene Williams, P.E.
Traffic Review No Comments 11/13/2023 11/13/2023
Erin Ralovo
Engineering Review No Comments 11/09/2022 11/08/2022
Gene Williams, P.E.
Engineering Review No Comments 09/15/2022 09/15/2022
Gene Williams, P.E.
Traffic Review No Comments 09/15/2022 09/13/2022
Brad Cooley, P.E., RSPI
Engineering Review Corrections 09/07/2022 09/07/2022
Gene Williams, P.E.
Corrective Action Required
09/07/2022

A new field inlet is called-out as "109". The stormwater collection system was designed what appears to be the 10 year event, and it is unclear what the 100 year event will show within the underground system. It should be noted that the minimum level of service for all stormwater systems within the City of Lee's Summit is the 100 year event, with an overflow system designed for the system in the event the 100 year event cannot be managed by the underground system. Lot 13 and Lot 14 therefore should include an MBOE which is a minimum 2.0 feet above the calculated 100 year water surface elevation interpolated along this water surface. An overflow route shall be established and a design provided for this overflow system. Alternatives include the design of a stormwater system that is capable of managing the 100 year event without surcharging (i.e., defined as being a minimum of 6 inches below the lowest throat opening of any field inlet). The City would prefer the system be capable of managing the 100 year event without surcharging, and it would appear this could be achieved with relative ease. If this can be achieved, the MBOEs along Lots 13 and Lot 14 would not be necessarily required. Please evaluate, and revise as appropriate.
Corrective Action Required
09/07/2022

Wouldn't the new field inlet 109 be better configured with additional openings? As proposed, it appears only one (1) opening to the north is proposed. Please evaluate, and revise as necessary with the previous comment in mind.
Traffic Review No Comments 09/14/2022 08/30/2022
Mike Weisenborn
Engineering Review Corrections 05/13/2022 05/13/2022
Gene Williams, P.E.
Corrective Action Required
05/13/2022

Please see previous applicant letter comment 1. It does not appear the stormwater memorandum was submitted. It shall be signed and sealed by a design professional registered in the State of Missouri.
Corrective Action Required
05/13/2022

Please see comment 5 in previous applicant letter. No callouts were provided on whether an "as-graded" plot plan is required for the lots on the MBOE table shown on Sheet 3. Please indicate on the table (or other means) which lots require an "as-graded" plot plan. This information is needed by our development technicians during the plot plan review phase.
Corrective Action Required
05/13/2022

Please see comment 12 in previous applicant letter. Drainage along Ranson Rd. will likely be a significant problem without an underground storm system installed to manage the stormwater. This will become even worse during the future phase. Stormwater will be managed via the ditch along Ranson Rd., and will lead to further deterioration of Ranson Rd. Normal procedure is to look 4 lots upstream, and install a field inlet. There may be a possibility of routing some of the stormwater to the west. Please re-evaluate this situation, since it is not considered an acceptable alternative for long term maintenance.
Traffic Review Corrections 05/10/2022 05/11/2022
Gene Williams, P.E.
Corrective Action Required
05/11/2022

Street name signs shall be a mix of upper and lower case. The City's detail sheet has been updated on our website.
Traffic Review No Comments 05/10/2022 04/26/2022
Mike Weisenborn
Engineering Review Corrections 02/25/2022 02/25/2022
Gene Williams, P.E.
Corrective Action Required
02/20/2022

A stormwater memorandum is required. It shall document this phase and other phases of the overall development and perhaps reference the overall overall stormwater report. Please provide a signed and sealed stormwater memorandum.
Corrective Action Required
02/20/2022

Sheet 3: A callout for an overflow swale is shown, yet the contour lines do not reflect a swale being installed. Please revise this sheet in this area to reflect the installation of an overflow swale at B-B, and also include additional cross-sections along this emergency overflow route. Finally, profile views of each cross section are required. Generic cross-sections as depicted on this sheet are not sufficient. Please revise.
Corrective Action Required
02/25/2022

Sheet 3: Additional cross-sections are required to denote the location of the swale A-A. These shall be placed at key locations, at the beginning, end, and selected intervals along the swale. Graphic representation of each cross-section is required. Generic cross-section profile views are not sufficient. Please revise.
Corrective Action Required
02/25/2022

Sheet 3: MBOE designation was missing on the table. Please see guidance provided on previous project (e.g., The Manor at Bailey Farms 1st Plat) concerning MBOE designation for lots. At present, it is unclear whether the underground system is capable of managing the 100 year event since HGL was not provided. MBOEs shall be established for all lots adjacent to emergency overflow swales, swales, or other features if the underground system is unable to meet the criteria sent previously. Please revise.
Corrective Action Required
02/25/2022

Sheet 3: The table was missing the lots requiring an "as-graded" plot plan. Please revise.
Corrective Action Required
02/25/2022

Sheet 3: It appears a swale is being constructed along the eastern boundary of the project in Tract A. No cross-section callouts were provided, nor were any profile views of the cross-section callouts provided, nor any calcualtions of the hydraulics within the swale. Please revise as appropriate.
Corrective Action Required
02/25/2022

Sheet 6: Geometry is acceptable, but not reviewed due to lack of any details. Please be aware that "wings" on ADA-accessible ramps are not allowed in the City of Lee's Summit. Grading shall be required at no more than 3 to 1 slope to the ramp. Please provide a complete plan for the ADA-accessible ramps. Ensure all elevation callouts, running slope callouts, and cross-slope callouts are provided on the ADA-accessible ramps.
Corrective Action Required
02/25/2022

There was no indication in the plans concerning the start and stop point of sidewalk construction. All ADA-accesible ramps shall be shown to be constructed with these improvements, and all sidewalk along unplatted property and common area tracts shall be constructed with these improvements. Provide sufficient notes showing the exact start and stop points for construction of ADA-accessible ramps and sidewalk.
Corrective Action Required
02/25/2022

Sidewalk north of Lot 24 shall be constructed along with these improvements since it is located along unplatted property. Please see above comment concerning the placement of notes and symbols to delineate the start and stop point of all sidewalk construction.
Corrective Action Required
02/25/2022

Sheet 10: HGL for the design storm was not provided on the profile views. Recommend the 10 year event be at or below the crown of pipe, and the 100 year event at least 0.5 feet below any opening. If the underground system cannot manage the 100 year event without surcharging (as defined as being less than 0.5 feet below any opening such as a throat in a curb inlet or field inlet), then an emergency overflow swale shall be required. Please be aware that emergency overflow swales are still suggested even if this criteria is met. Please revise as appropriate.
Corrective Action Required
02/25/2022

Sheet 11: Asphaltic concrete pavement type was missing. Please see Design and Construction Manual for specific choices, and revise as appropriate.
Corrective Action Required
02/25/2022

It would appear an underground storm system is warranted along Ranson Rd. to eliminate the swale within Tract A. Please analyze and revise as appropriate. Ensure appropriate easements are dedicated on the plat and shown on the plans.
Corrective Action Required
02/25/2022

It would appear additional underground stormwater system is warranted within the rear of the lots north of Windbreak Dr. Please analyze and revise as appropriate. Additional easements along the rear of these lots is also warranted to place the public storm lines and field inlets within the rear lots. Ensure this is carried-through to the plat.
Traffic Review No Comments 02/25/2022 02/25/2022
Susan Barry, P.E.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
02/10/2022 Plans 21-133-SS(REV0) signed
02/25/2022 Letter DE-Comment Letter (Engineering Plans)
04/26/2022 Plans 21-133-SS(REV1)sealed
04/26/2022 Engineers Estimate 21-133-Retreat - EOPC(REV0)
04/26/2022 Letter Response to Comments - DE Comment Letter dated 2-25-2022 - Public Streets - Storm and Master Drainage
05/13/2022 Letter DE-Comment Letter (Engineering Plans)
08/29/2022 Plans 21-133-SS(REV3) sealed
09/07/2022 Letter DE-Comment Letter (Engineering Plans)
09/08/2022 Letter Response to Comments dated 9-7-2022
09/08/2022 Plans 21-133-SS(REV4)sealed
09/08/2022 Engineers Estimate 21-133-Retreat - Cost Estimate(REV2)
09/08/2022 Plans 21-130-SS Sheet 31 (Manor) sealed
09/15/2022 Activity Document FeeWorksheetRetreatAtBaileyFarmsStreetStormMDP
11/02/2022 Letter 21-133 Submittal Letter 11_1_2022
11/02/2022 Plans 21-133-SS-SHEET 9 - STORM PLAN 11_01_2022 (sealed)
11/02/2022 Plans 21-133-SS-SHEET 10 - STORM PROFILES 11_01_2022 (sealed)
11/02/2022 Letter Permit Review Route RA Improvements @ The Retreat at Bailey Farms
11/08/2022 Email PRIOR TO PERMITTING REQUIREMENTS
06/06/2023 Letter APPLICATION EXTENSION REQUEST_Rev 0_PL2021431
10/27/2023 Plans 10272023-21-133-SS-REV(0)sealed
11/14/2023 Email EMAIL COMMENTS NOV2023
11/30/2023 Plans 21-133-SS(REV6)sealed
12/14/2023 Approved Plans STREET, STORM AND MDP STAMPED CONSTRUCTION PLANS
12/14/2023 Engineers Estimate 21-133-Retreat - Cost Estimate(REV3)
12/14/2023 Activity Document FeeWorksheetRetreatBaileyStreetStormMDP
12/14/2023 Email STKY APPROVAL
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.