Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
04/22/2022
|
04/18/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
COMMON AREA. A copy of the CC&Rs shall be submitted to the City for review. In accordance with City ordinance, the CC&Rs shall contain the required language found under UDO Section 4.290. The City can provide a Word document with the required language for the developer's use.
|
|
Corrective Action Required
SIDEWALK. The proposed new sidewalk in front of Lot 1C and a portion of Lot 1A is required to be a minimum 5' in width. The sidewalk label in front of Lot 1C indicates "proposed 4' sidewalk". Revise to 5'.
|
|
|
GIS Review
|
No Comments
|
04/22/2022
|
04/15/2022
|
|
Kathy Kraemer
|
|
|
Traffic Review
|
No Comments
|
04/22/2022
|
04/15/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
No Comments
|
04/22/2022
|
04/15/2022
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Approved with Conditions
|
04/22/2022
|
04/15/2022
|
|
Mike Weisenborn
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
Planning Review
|
Corrections
|
03/01/2022
|
02/28/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
COMMON AREA.
- Revise the common area dedication paragraph to dedicate both ownership and maintenance responsibilities to the property owners association. As written, the current language only dedicates maintenance responsibilities to the POA. The language shall also dedicate ownership of Tract A to the POA.
- A copy of the CC&Rs shall be submitted to the City for review. In accordance with City ordinance, the CC&Rs shall contain the required language found under UDO Section 4.290. The City can provide a Word document with the required language for the developer's use.
|
|
Corrective Action Required
ADDRESSES.
- Add the "NE" street name quadrant prefix to the addresses labeled on Lots 1B and 1C.
- Label Tract A with the address of 550 NE Town Centre Dr.
|
|
Corrective Action Required
EASEMENT DEDICATIONS. The last sentence in the standard easement dedication paragraph reads, "Grantor, on behalf of himself...." This same sentence shall be added to the end of both the waterline and sanitary easement dedication paragraphs.
|
|
Corrective Action Required
STREET NAMES.
- The street name suffix for NE Town Centre located along the west plat boundary is incorrect. The correct suffix is Boulevard, not Parkway. Also, delete the parenthetical Independence Ave street label beneath it. Independence Ave is a different street located off the plat drawing to the east.
|
|
Corrective Action Required
SIDEWALK. The proposed new sidewalk in front of Lot 1C and a portion of Lot 1A is required to be a minimum 5' in width.
|
|
|
Engineering Review
|
Approved with Conditions
|
03/01/2022
|
02/28/2022
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
GIS Review
|
Corrections
|
03/01/2022
|
02/22/2022
|
|
Kathy Kraemer
|
|
Corrective Action Required
The curve on the south line has 2 dimensions, 106.36+141.19 = 247.55 The dwg has an overall dimnsion of 247.54 Please revise
|
|
|
Traffic Review
|
No Comments
|
03/01/2022
|
02/22/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
No Comments
|
03/01/2022
|
02/22/2022
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Corrections
|
02/15/2022
|
02/15/2022
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
The existing sidewalk along the north side of NE Town Centre Dive is 4’ wide. Please revise the label.
|
|
Corrective Action Required
Please include the following, revising the sections within brackets to the appropriate entities: All storm water conveyance, retention, or detention facilities to be located on common property shall be owned and maintained by the {property owners’ association, homeowners’ association} in accordance with the standards set forth in the covenants, conditions, and restrictions. These stormwater detention facilities shall be inspected by the {property owners’ association, homeowners association, or owner, as appropriate} on the frequency specified in the current City of Lee’s Summit Design and Construction Manual, to assure that all inlet and outlet structures are fully-functional, the detention basin has full storage capacity and all landscaping, vegetation and structural improvements are being maintained in accordance with the current City of Lee’s Summit Property Maintenance Code.
|
|
|
Traffic Review
|
No Comments
|
02/15/2022
|
02/15/2022
|
|
Susan Barry, P.E.
|
|
|
Planning Review
|
Corrections
|
02/15/2022
|
02/09/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
LOT NUMBERS. Based on the City's naming convention for a replat, the lot numbers shall be revised from 1-3 to 1A, 1B and 1C.
|
|
Corrective Action Required
PLAT TITLE. The plat title shall be revised to read, "Lee's Summit Town Centre, Lots 1A-1C and Tract A". Update all references to the plat title throughout the document to reflect the revised plat title.
|
|
Corrective Action Required
COMMON AREA.
- In accordance with City ordinance, the creation of common area requires that a property owners association be established to own and maintain said common area. Revise the common area dedication paragraph to dedicate both ownership and maintenance responsibilities to the property owners association.
- A copy of the CC&Rs shall be submitted to the City for review. In accordance with City ordinance, the CC&Rs shall contain the required language found under UDO Section 4.290. The City can provide a Word document with the required language for the developer's use.
|
|
Corrective Action Required
STREET NAMES. Add the "NE" quadrant prefix to the Independence Avenue and Town Centre Drive street name labels.
|
|
Corrective Action Required
ADDRESSES. Label each parcel with their following respective addresses: Lot 1A - 520; Lot 1B - 540; Lot 1C - 530; and Tract A - 550.
|
|
Corrective Action Required
VICINITY MAP. Add a north arrow to the vicinity map.
|
|
Corrective Action Required
EASEMENT DEDICATIONS. Dedication paragraphs defining the proposed water line, sanitary sewer and access easements shall be added to the plat. The paragraphs shall also include to whom each easement type is dedicated.
|
|
|
GIS Review
|
Corrections
|
02/15/2022
|
02/08/2022
|
|
Kathy Kraemer
|
|
Corrective Action Required
The east line of the plat shows overall dimension as 585.47, but lot dimensions total 585.35
Either revise lot dimensions or overall dimension so they match.
|
|
Corrective Action Required
Plat does not close. It appears that the west line is 1.5 too long, but please double check.
|
|
|
Fire Review
|
No Comments
|
02/15/2022
|
02/03/2022
|
|
Jim Eden
|
|
|